斜井二次涌水原因分析及注浆治理措施
引用本文:钱自卫,马保明,姜振泉,刘鹏.斜井二次涌水原因分析及注浆治理措施[J].水文地质工程地质,2012,39(2):19-22.
作者姓名:钱自卫  马保明  姜振泉  刘鹏
作者单位:(1.中国矿业大学资源与地球科学学院,徐州 221116;2.山西潞安集团黑龙煤业有限公司,临汾 401201)
基金项目:中国矿业大学青年科研基金资助项目(2009A029);深部岩土力学与地下工程国家重点实验室博士后专项基金(PD1012)
摘    要:山西潞安集团黑龙煤矿副斜井在经过迎头预注浆后,在预注浆段内掘进时再次发生涌水现象,导致井筒被淹。分析其主要原因为初次注浆形成的软粘土与浆液共同的裂隙充填体稳定性差。对于涌水裂隙采取分流泄压再堵水的总体治理方案,即变不可控涌水为可控水后再注浆处理。涌水点注浆堵水严格控制注浆压力,采用水泥-水玻璃双液浆。通过布设检查孔对注浆效果进行检查分析注浆质量较好,为类似有软粘土充填裂隙岩体的注浆治理提供借鉴。

关 键 词:涌水    软粘土充填    充填体稳定性    注浆治理
收稿时间:2011-06-30
修稿时间:2011-10-20

Hydrogeological analysis and control of groundwater inrush for the second time in an inclined shaft
QIAN Zi-wei , MA Bao-ming , JIANG Zhen-quan , LIU Peng.Hydrogeological analysis and control of groundwater inrush for the second time in an inclined shaft[J].Hydrogeology and Engineering Geology,2012,39(2):19-22.
Authors:QIAN Zi-wei  MA Bao-ming  JIANG Zhen-quan  LIU Peng
Institution:(1. School of Resources and Geosciences, China University of Mining and Technology, Xu Zhou 221116, China; 2.Hei Long Cola Mine, Lu′An Group, Lin Fen, 401201, China)
Abstract:A groundwater inrush occurred again when excavation came to the pregrouting interval in the auxiliary inclined shaft,which submersed the shaft of the Heilong Coal Mine in Shanxi.The main cause was that the poorness of the fracture stability was formed during the interaction of soft clay and grout in the first grouting process.The method "distributary to relieve pressure then to prevent water inflow" was taken,thus the uncontrollable gushing was changed into controllable gushing and grouting.The borehole was used to examine the effect of the grouting,and the results show that the effect was good.This paper provides references for similar grouting in rock mass which is filled with soft clay.
Keywords:water inflow  soft clay filling  filling body stability  grouting control
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水文地质工程地质》浏览原始摘要信息
点击此处可从《水文地质工程地质》下载免费的PDF全文