Drillhole high-pressure packer permeability test for underground powerhouse in Pushihe pumped storage hydro-plant |
| |
Authors: | TIAN Zuoyin CHEN Li REN Xiangyu LI Zhanjun |
| |
Institution: | 1. Institute of Northeast Hydroelectric Investigation Design, Changchun 130000, China 2. College of Construction Engineering, Jilin University, Changchun 130026, China |
| |
Abstract: | Usually the water head of the pumped storage hydro-plant is high, generally up to 400-500 m, therefore the rock mass under the high-pressure bifurcation pipe have to bear as high as millions Pascal water pressure, in according with the requirements of high water head pumped storage hydro-plant should be 1.2 times of the water head special high-pressure packer permeability test compared with normal to test the permeability of rock and rock cleavage pressure value. The test results on the choice of design options often play a decisive role. Based on the engineering practice, the authors studied the drillhole high-pressure packer permeability test in the pumped storage hydro-plant's underground powerhouse, by the analysis of test results, this article offers a demonstration of the deformation of rock fracture witch under building in the condition of high-pressure water head, it provides a more detailed engineering geological background. |
| |
Keywords: | pumped storage high-pressure packer permeability test rock mass deformation permeability rock cleavage |
本文献已被 CNKI 维普 万方数据 等数据库收录! |
|