首页 | 本学科首页   官方微博 | 高级检索  
     检索      

夯扩桩沉管控制贯入度计算法
引用本文:周武阶.夯扩桩沉管控制贯入度计算法[J].地质与勘探,1998,34(5):53-55.
作者姓名:周武阶
作者单位:冶金部中南勘察基础工程总公司
摘    要:通过改造格尔谢万诺夫打桩公式,提供了夯扩桩沉管控制贯入度计算表达式,在此 ,介绍了沉积控制贯入度在夯扩桩设计和施工中的用途,并举例验证。

关 键 词:沉管控制  贯入度  夯扩桩  闭口钢管桩  承载力

CALCULATION OF PENETRATION CONTROLLED BY IMMERSED TUBE FOR RAMMER-REAMED PILE
Zhou Wujie.CALCULATION OF PENETRATION CONTROLLED BY IMMERSED TUBE FOR RAMMER-REAMED PILE[J].Geology and Prospecting,1998,34(5):53-55.
Authors:Zhou Wujie
Abstract:A calculation formulation of penetration controlled by immersed tube for fammer-reamed pile was proposed by means of revising Geer Xiefannuofu piling formular,and its use in the designing and construction of rammer-reamed pile was introduced.
Keywords:penetration controlled by immersed tube  standard value for vertical ultimate bearing capacity of single pile  rammer-reamed pile  closed steel pile
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《地质与勘探》浏览原始摘要信息
点击此处可从《地质与勘探》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号