首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Numerical investigation of the gel barrier formation with vertical injection pipe
Authors:Meejeong Kim  M Yavuz Corapcioglu  Jae-Woo Park
Institution:(1) Department of Civil Engineering, Hanyang University, Seoul, 133-791, South Korea;(2) Department of Civil Engineering, Texas A&M University, College Station, TX 77843, USA
Abstract:Permeation grouting is the injection of a fluid grout into ground and production of a solidified mass to carry increased load and/or fill voids to control water flow. This study examined a technology of constructing horizontal gel barrier by the permeation grouting through multiple vertical injection pipes. Colloidal Silica (CS) solution was used as a gelling liquid to be injected and solidified in the unsaturated soil. Formation of a gel bulb was simulated and the results were compared with those obtained from the sleeve pipe injection with horizontal pipes. The gel bulb generated from the injection method employing vertical pipe showed greater sensitivity of the bulb’s lateral extent to variations in operating conditions compared to the sleeve pipe injection. Although in the limited numbers, in all examined cases, the vertical-pipe system appeared to consume a larger volume of CS solution than the horizontal-pipe system to form an equivalent horizontal gel barrier. This result supports our intuition that the injection with the horizontal pipes may be more effective than the one with vertical pipes in constructing horizontal gel barrier.
Keywords:Barrier  Colloidal silica  Permeation grouting  Numerical model  Unsaturated soil
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号