首页 | 本学科首页   官方微博 | 高级检索  
     


Dynamic optimal ground water remediation including fixed and operation costs
Authors:Chang Liang-Cheng  Hsiao Chin-Tsai
Affiliation:Department of Civil Engineering, National Chiao Tung University, 1001 TA Hsueh Rd., Hsinchu, Taiwan, 300, Republic of China;011886–3–5727293;fax 011886–3–5727293;;Department of Information Management, Chungchou Institute of Technology, 6, Lane 2, sec. 3, Shan-Chiao Rd., Yuanlin, Changhwa, Taiwan, 510, Republic of China;011886–4–8311498;
Abstract:In time-varying ground water remediation, the lack of an optimal control algorithm to simultaneously consider fixed costs and time-varying operating costs makes it nearly impossible to obtain an optimal solution. This study presents a novel algorithm that integrates a genetic algorithm (GA) and constrained differential dynamic programming (CDDP) to solve this time-varying ground water remediation problem. A GA can easily incorporate the fixed costs associated with the installation of wells. However, using a GA to solve for time-varying policies would dramatically increase the computational resources required. Therefore, the CDDP is used to handle the subproblems associated with time-varying operating costs. A hypothetical case study that incorporates fixed and time-varying operating costs is presented to demonstrate the effectiveness of the proposed algorithm. Simulation results indicate that the fixed costs can significantly influence the number and locations of wells, and a notable total cost savings can be realized by applying the novel algorithm herein.
Keywords:
本文献已被 PubMed 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号