首页 | 本学科首页   官方微博 | 高级检索  
     检索      

国家庄煤矿8101工作面动水注浆堵水技术
引用本文:王则才.国家庄煤矿8101工作面动水注浆堵水技术[J].煤田地质与勘探,2004,32(4):26-28.
作者姓名:王则才
作者单位:肥城矿业集团公司, 山东 肥城 271619
摘    要:简要介绍了国家庄煤矿810 1工作面隐伏断层导致特大型奥灰水突出的经过,并分析了突水水源,还阐述了治理方案和堵水技术,为类似矿井的突水治理提供了经验。 

关 键 词:突水    隐伏断层    注浆    堵水技术
文章编号:1001-1986(2004)04-0026-03
收稿时间:2003-09-25
修稿时间:2003年9月25日

Grouting technique for water-shut-off under water-flowing conditions in No.8101 work-face,Guojiazhuang Coal Mine
WANG Ze-cai.Grouting technique for water-shut-off under water-flowing conditions in No.8101 work-face,Guojiazhuang Coal Mine[J].Coal Geology & Exploration,2004,32(4):26-28.
Authors:WANG Ze-cai
Institution:Feicheng Mining Company Group, Feicheng 271619, China
Abstract:The procedure of water inrush from Ordovician limestone in No. 8101 work-face,Guojiazhuang Coal Mine, is briefly introduced, which caused by potential faults. The origin of water is analyzed, and water control plan and technique for water-shut-off are described, providing experiences for other mines.
Keywords:water inrush  potential fault  grouting  technique of water-shut-off  
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《煤田地质与勘探》浏览原始摘要信息
点击此处可从《煤田地质与勘探》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号