首页 | 本学科首页   官方微博 | 高级检索  
     检索      

夯管锤的优化设计
引用本文:彭振斌,张治兵,等.夯管锤的优化设计[J].地质与勘探,2001,37(3):81-83.
作者姓名:彭振斌  张治兵
作者单位:中南大学,长沙410083
摘    要:论述了夯管锤优化变量的选取和约束条件的建立,并运用计算机仿真技术获得了夯管锤优化目标函数的计算方法,在此基础上运用复形调优法对YH300型夯管锤进行了优化设计,使夯管锤的性能得到显提高。

关 键 词:夯管锤  优化设计  目标函数  约束条件  计算机仿真技术
文章编号:0495-5331(2001)03-0 081-03
修稿时间:2000年11月20

OPTIMIZATION OF RAMMER
PENG Zhen-bin,ZHANG Zhi-bing,LIU Jing,ZHU Shi-ping.OPTIMIZATION OF RAMMER[J].Geology and Prospecting,2001,37(3):81-83.
Authors:PENG Zhen-bin  ZHANG Zhi-bing  LIU Jing  ZHU Shi-ping
Abstract:This article describes the selection of designing variables and establishment of binding condition of rammer.The computer imitation is used for obtaining the method of calculating objective function .On the basis of the method,the optimization of YH300 rammer is carried out with the complicated pattern method. The result indicates that the performance of the rammer is improved remarkably.
Keywords:rammer  optimization  designing variables  binding condition  objective function
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《地质与勘探》浏览原始摘要信息
点击此处可从《地质与勘探》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号