首页 | 本学科首页   官方微博 | 高级检索  
     

中国地震预警延迟时间算法及其对预警盲区的影响研究
引用本文:杜航,王俊,江昊琳,王宝善,郑江蓉,朱音杰,王大伟. 中国地震预警延迟时间算法及其对预警盲区的影响研究[J]. 中国地震, 2021, 37(1): 216-226
作者姓名:杜航  王俊  江昊琳  王宝善  郑江蓉  朱音杰  王大伟
作者单位:江苏省地震局, 南京 210014;中国科学技术大学, 地球和空间科学学院, 合肥 230026;中国科学技术大学, 地球和空间科学学院, 合肥 230026;中国地震局地球物理研究所, 地震观测与地球物理成像重点实验室, 北京 100081;河北省地震局, 石家庄 075000
基金项目:江苏省科技支撑计划—社会发展项目(BE2016804)、江苏省地震局青年科学基金(202102)共同资助
摘    要:通过分析预警系统的预警步骤来探讨影响获得预警时间的因素,并与瑞士地震台网预警延迟各步骤进行对比,得出中国地震预警系统仪器延迟时间为7.6s。提出地震波到台站所需时间的算法,较震中假设在台站中间的传统算法更为准确,在此算法下采用双台法和四台法计算接收地震波所需时间,得到中国地震预警延迟时间。讨论双台法和四台法在不同震源深度和台站密度下对预警盲区大小的影响,在台间距小于20km时,2种方法预警盲区差异不大。通过理论计算得出,在台站到达一定密度时,预警系统仪器延迟时间缩短比台站加密对预警盲区的缩小更有效。

关 键 词:地震预警  预警延迟  算法  预警盲区  台站密度
收稿时间:2020-05-08
修稿时间:2020-10-31

Research on the Delay Time Algorithm of Earthquake Early Warning and Its Influence on the Early Warning Blind Area in China
Du Hang,Wang Jun,Jiang Haolin,Wang Baoshan,Zheng Jiangrong,Zhu Yinjie,Wang Dawei. Research on the Delay Time Algorithm of Earthquake Early Warning and Its Influence on the Early Warning Blind Area in China[J]. Earthquake Research in China, 2021, 37(1): 216-226
Authors:Du Hang  Wang Jun  Jiang Haolin  Wang Baoshan  Zheng Jiangrong  Zhu Yinjie  Wang Dawei
Affiliation:Jiangsu Earthquake Agency, Nanjing 210014, China;School of Earth and Space Sciences, Science and Technology University of China, Hefei 230026, China;School of Earth and Space Sciences, Science and Technology University of China, Hefei 230026, China;Key Laboratory of Earthquake Observation and Geophysical Imaging, Institute of Geophysics, China Earthquake Administration, Beijing 100081, China;Hebei Earthquake Agency, Shijiazhuang 075000, China
Abstract:This paper analyzed the steps of the early warning system to obtain the influencing factors of the early warning time. By comparing with the early warning delay decomposition of the Swiss Seismic Network we obtain that the instrument delay time of the earthquake early warning system is 7.6s in China. In this paper we present an algorithm of seismic wave arrival time,which is more accurate than the traditional algorithm with the epicenter assumed to be in the center of the station. Under this algorithm,the time required for receiving seismic waves by the two-station method and the four-station method is calculated to obtain the delay time of earthquake early warning in China. We discuss the influence of the two-station method and the four-station method on the size of the early warning blind area under different focal depths and station densities. We find that when the interval between the stations is less than 20km,the difference between the two methods of early warning blind area is not significant. Through theoretical calculation,when the station density reaches a certain density,the instrument delay time of the early warning system is shortened,which is more effective than the station encryption to reduce the warning blind area.
Keywords:Earthquake early warning  Early warning delay  Algorithm  Early warning blind area  Station density
点击此处可从《中国地震》浏览原始摘要信息
点击此处可从《中国地震》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号