Handling and launching of heavy concrete caissons in a marine environment |
| |
Authors: | S. Surendran |
| |
Affiliation: | Ocean Engineering Centre, IIT Madras, Madras-600 036, India |
| |
Abstract: | Handling of heavy structures demand unusual crane capacity. Availability of such cranes may be limited in developing countries. An innovative way to construct and launch heavy concrete structures in a developing country, where crane availability is rare, to lift, transport and handle heavy structures, is discussed in this paper. Heavy caissons are used in the marine environment as breakwaters, as berthing facilities for vessels, as gravity structures to absorb energy from waves, etc. The methodology for constructing multi-caissons on-board a barge and then on-board a floating dock is the subject of this paper. The respective feasibilities are discussed.The free floating condition of the caisson and its righting arm stability are described. At first the caisson was considered as its lip wall opened to the sea. The case of lip wall closed for more buoyancy is also considered. The stability of the barge and floating docks is shown for various stages of completion of construction. After investigating many factors, a safe procedure for construction and launching thereafter is described in this paper. The problem of handling a heavy concrete structure from the view point of a naval architect is highlighted. |
| |
Keywords: | Righting arm stability Metacentric height Launching Trimming Towing and ballast |
本文献已被 ScienceDirect 等数据库收录! |
|