武当山隧道进口处滑坡稳定性分析与研究
引用本文:卢生强.武当山隧道进口处滑坡稳定性分析与研究[J].新疆地质,2012,30(1):109-112.
作者姓名:卢生强
作者单位:新疆铁道勘察设计院,新疆乌鲁木齐,830011
摘    要:对武当山隧道进口处Ⅰ号和Ⅱ号滑坡稳定性主要影响因素进行了分析,采用传递系数法对Ⅰ号和Ⅱ号滑坡在天然及饱和状态下的稳定性进行定量计算,利用Flac3d软件对Ⅰ号滑坡在天然及饱和状态时的应力应变进行数值模拟研究.综合分析认为,降雨入渗是加剧武当山隧道进口处滑坡活动触发因素.为保证襄渝铁路运营安全,建议对Ⅰ号滑坡进行削坡处理,对Ⅱ号滑坡在前缘设置抗滑桩进行处理.

关 键 词:滑坡  传递系数法  稳定性  数值模拟

Analysis and Study on Stability of Landslides on Wudang Mountain Tunnel Entrance of Xiangfan-Chongqing Rail Way
LU Sheng-qiang.Analysis and Study on Stability of Landslides on Wudang Mountain Tunnel Entrance of Xiangfan-Chongqing Rail Way[J].Xinjiang Geology,2012,30(1):109-112.
Authors:LU Sheng-qiang
Institution:LU Sheng-qiang(Xinjiang Railway Survey and Design Institute,Urumqi,Xinjiang,830011,China)
Abstract:The main influence of stability of landslides on Wudang mountain tunnel entrance of Xiangfan-Chongqing rail way is analysised qualitatively,and the stability of landslideⅠand landsideⅡin natural state and saturated state are calculated by the transfer coefficient method.Besides,The stress and strain of landslideⅠin natural state and saturated state are simulated by the Flac3d.It comes to the conclusion that rainfall infiltration is the trigger factor of landslide on wudang mountain tunnel entrance.To ensure the operation safety of Xiangfan-Chongqing rail way,this papper suggests that cutting slope for landslideⅠand setting anti-slide pile for the frontal part of lanslideⅡ.
Keywords:Landslides on Wudang mountain tunnel entrance  Transfer coefficient method  Numerical simulation  Stability