首页 | 本学科首页   官方微博 | 高级检索  
     

国家体育场斜柱测量放样原理与方法
引用本文:郑之宏,杨锐. 国家体育场斜柱测量放样原理与方法[J]. 现代测绘, 2008, 31(2): 12-15
作者姓名:郑之宏  杨锐
作者单位:1. 中咨工程建设监理公司,北京,100044
2. 北京华星勘查新技术公司,北京,100035
摘    要:本文用两种不同的数学方法解决国家体育场斜扭柱在任意高程上柱角点三维坐标计算问题,对斜柱现场放样的方法进行阐述。提出建筑施工测量中空间直角坐标系旋转矩阵法转换思路,并论述全站仪坐标放样限差的制定方法。

关 键 词:国家体育场  斜柱  施工测量  放样  空间直角坐标系  旋转矩阵
文章编号:1672-4097(2008)02-0012-04

The Principle and Method for Setting Out the Raking Columns of the National Stadium
Zheng Zhihong,Yang Rui. The Principle and Method for Setting Out the Raking Columns of the National Stadium[J]. Modern Surveying and Mapping, 2008, 31(2): 12-15
Authors:Zheng Zhihong  Yang Rui
Abstract:The different mathematical methods were used to calculate the three dimensional coordinate of the national stadium's raking columns,and the setting out method of the raking columns was elaborated.The Thinking for the method of revolving matrix was raised in construction survey, and the method for formulating the Tolerance about the setting out with total Station was discussed.
Keywords:National stadium  raking columns  Construction survey  Setting out  Spatial rectangular coordinate System  revolving matrix
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号