首页 | 本学科首页   官方微博 | 高级检索  
     检索      

2017年四川九寨沟MS 7.0地震的强地面运动模拟
引用本文:丁阳,王国新,杨福剑.2017年四川九寨沟MS 7.0地震的强地面运动模拟[J].震灾防御技术,2018,13(3):578-587.
作者姓名:丁阳  王国新  杨福剑
作者单位:1.大连理工大学, 建设工程学部工程抗震研究所, 辽宁大连 116024
基金项目:国家自然科学基金项目(51378092、51578113),中国地震局工程力学研究所基本科研业务专项(2018D19)和“十二五”国家科技支撑计划项目(2014BAL05B03)共同资助
摘    要:2017年8月8日发生的九寨沟MS 7.0地震,是中国近10年来发生的强震之一,造成了大量建筑破坏、人员伤亡和经济损失,强震台网记录到的最大峰值加速度为0.19g。本文采用Wang等(2015)提出的改进有限断层法模拟了这次地震中部分台站的加速度时程。首先,选取合适的震源模型和输入参数,通过对比模拟结果和地震记录,估计这次地震的应力降大约为4.0MPa,与王宏伟等(2017)的分析结果基本一致。与EXSIM(Motazedian等,2005)方法相比,Wang等(2015)的方法得到的结果在频域上与实际地震记录更相符。同时,合成了强震台站以及断层附近网格点的加速度时程,模拟结果的时程和反应谱与实际记录整体上较为符合,震中附近的PGA分布与震中烈度区基本一致,验证了本文结果的有效性。本文合成的地震动可以为该地区的灾后抗震设计提供一定依据。

关 键 词:九寨沟地震    随机有限断层法    震源模型    场地放大因子    烈度图
收稿时间:2018/1/3 0:00:00

Simulation of Strong Ground Motion from the 2017 Jiuzhaigou, Sichuan MS7.0 Earthquake
Ding Yang,Wang Guoxin and Yang Fujian.Simulation of Strong Ground Motion from the 2017 Jiuzhaigou, Sichuan MS7.0 Earthquake[J].Technology for Earthquake Disaster Prevention,2018,13(3):578-587.
Authors:Ding Yang  Wang Guoxin and Yang Fujian
Institution:1.Institute of Earthquake Engineering, Faculty of Infrastructure Engineering, Dalian University of Technology, Dalian 116024, Liaoning, China2.State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Dalian 116024, Liaoning, China
Abstract:The August 8, 2017 Jiuzhaigou MS 7.0 earthquake is one of the strong earthquakes occurred in China during the last decade. This earthquake has caused a large amount of building damage, casualties and economic loss. The maximum PGA recorded by the seismic network is 0.19g. In this paper, the acceleration time histories at several strong-motion stations are simulated using an improved stochastic finite-fault method proposed by Wang et al. (2015). First, we selected proper source model and input parameters. Through the comparison between simulation results and seismic records, we estimate that the stress drop of this seismic event is as 4.0MPa, which is generally consistent with the analytical result reported in literature. Compared with the EXSIM method (Motazedian et al., 2005), the results obtained by using the Wang's method (2015) have better agreement with the seismic records in the frequency domain. Then we generated acceleration time histories at several strong-motion stations and grid points surrounding the fault. Through the simulation, we found that the synthetic time series and response spectra are in generally good agreement with the recorded motions, and distribution of synthetic PGA close to the epicenter is consistent with the maximum intensity area, suggesting the effectiveness of the results. The synthetic ground motions could provide reliable basis for the post-disaster seismic design in this region.
Keywords:Jiuzhaigou earthquake  Stochastic finite-fault method  Source model  Site amplification factors  Intensity map
点击此处可从《震灾防御技术》浏览原始摘要信息
点击此处可从《震灾防御技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号