首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Embankment reliability versus factor of safety: Before and after slide repair
Authors:Thomas F Wolff
Institution:Department of Civil and Environmental Engineering, Michigan State University, East Lansing, Michigan, 48824, U.S.A.
Abstract:Probabilistic slope stability analyses incorporate more information regarding the input variables than do traditional deterministic analyses. Consequently, more information is contained in the results. A probabilistic method for slope stability analysis for very general problems was presented by Wolff and Harr.1 The method allows analysis of a broad range of slope stability problems. In this Application Brief, the method is reviewed and used to illustrate the significant change in reliability of a dam slope from the time of an actual slide to the time the slide was repaired by the construction of a rock toe berm.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号