首页 | 本学科首页   官方微博 | 高级检索  
     

基坑开挖对近邻运营地铁隧道影响规律研究
引用本文:王立峰,庞 晋,徐云福,杨开放. 基坑开挖对近邻运营地铁隧道影响规律研究[J]. 岩土力学, 2016, 37(7): 2004-2010. DOI: 10.16285/j.rsm.2016.07.022
作者姓名:王立峰  庞 晋  徐云福  杨开放
作者单位:1. 浙江科技学院 土木与建筑工程学院,浙江 杭州 310023;2. 杭州萧山城市建设投资集团有限公司,浙江 杭州 311202
基金项目:浙江科技学院研究生科研创新基金重点项目(No.2015YJSKC005)。
摘    要:对某邻近基坑开挖的地铁隧道的水平位移和沉降的时空分布做了深入分析。由于软土的蠕变效应,应考虑基坑分块开挖的先后顺序造成的时空效应的影响,以及基坑围护体系的水平支撑结构对土体位移的限制作用。基坑开挖对邻近地铁隧道的影响范围为2.5倍开挖深度,而对于远基坑的右线,影响范围更低,甚至低至1.5倍开挖深度。将基坑和隧道的监测数据联系分析,得到比值与水平距离的关系曲线,将基坑监测数据代入拟合公式,对地铁水平和垂直位移进行估算。隧道水平位移与邻近的同深度土体水平位移的比值(?),其最大累计位移点的? 较多地处在0.60~0.65范围,在底板浇筑都已完成后,稳定在0.60。隧道沉降与邻近地表沉降的比值(?),其最大累计沉降点的?,较多地处在0.50~0.60间,底板浇筑完成后,稳定在0.52±0.05水平。

关 键 词:地铁隧道  基坑开挖  时空效应  时程分析  联系分析  
收稿时间:2015-11-28

Influence of foundation pit excavation on adjacent metro tunnels
WANG Li-feng,PANG Jin,XU Yun-fu,YANG Kai-fang. Influence of foundation pit excavation on adjacent metro tunnels[J]. Rock and Soil Mechanics, 2016, 37(7): 2004-2010. DOI: 10.16285/j.rsm.2016.07.022
Authors:WANG Li-feng  PANG Jin  XU Yun-fu  YANG Kai-fang
Affiliation:1. School of Civil Engineering and Architecture, Zhejiang University of Science and Technology, Hangzhou, Zhejiang 310023, China; 2. Hangzhou Xiaoshan Urban Construction Investment Group Co., Ltd., Hangzhou, Zhejiang 311202, China
Abstract:The spatial and temporal distribution of the horizontal displacement and settlement of a metro tunnel adjacent to the foundation pit is analyzed. Due to the creep effect of the soft soil, the space-time effect caused by the excavation of the foundation pit should be considered, in addition to the limit of the horizontal support structure of the foundation pit supporting system. The influencing scope of excavation on adjacent metro tunnel is 2.5 times the depth of excavation, and for the right line far away from the foundation pit, the influence scope is smaller, even lower to 1.5 times the depth of excavation. Based on the monitoring data of foundation pit and adjacent tunnels, the ratio-horizontal distance relation curve is obtained. Then the horizontal and vertical displacements of tunnel are estimated based on the monitoring data of foundation pit and fitting formula. The ratio between horizontal displacement of tunnel and that of the adjacent soil at the same depth, which corresponds to the maximum accumulative displacement, generally ranges from 0.60 to 0.65, and becomes stabilized at 0.60 after the foundation slab casting is finished. The ratio between settlement of tunnel and that value of the adjacent earth’s surface, which corresponds to the maximum cumulative settlement, is largely located within the range from 0.50 to 0.60, and becomes stable at the level of 0.52±0.05.
Keywords:metro tunnel  excavation of foundation pit  time-space effect  time-history analysis  conjoint analysis  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号