首页 | 本学科首页   官方微博 | 高级检索  
     

盾构施工地表沉降自动化监测及数据移动发布系统
引用本文:谢雄耀,李 军,王 强. 盾构施工地表沉降自动化监测及数据移动发布系统[J]. 岩土力学, 2016, 37(Z2): 788-794. DOI: 10.16285/j.rsm.2016.S2.100
作者姓名:谢雄耀  李 军  王 强
作者单位:1. 同济大学 岩土及地下工程教育部重点实验室,上海 200092;2. 同济大学 地下建筑与工程系,上海 200092
基金项目:国家自然科学基金(No.41372273);上海市科学技术委员会重点项目(No.14231200602,No.15DZ1203800);广西科学研究与技术开发计划项目(No.2015BC17047)。
摘    要:地表沉降监测是盾构信息化施工的重要组成部分,对优化盾构施工参数,保证施工安全具有十分重要的意义。为了及时共享和反馈监测成果,提高监测信息管理与数据分析的效率,采用Microsoft Visual Studio .Net编程技术和MySQL数据库开发了沉降自动化监测及数据移动发布系统,实现了24 h监测数据的自动化采集、分析和移动端推送,并将该系统应用于南宁轨道交通1号线盾构隧道下穿南宁火车站铁路股道及站房工程,获得盾构推进过程中的地表沉降及火车轨道沉降的变化规律。通过监测数据和分析成果的及时反馈,优化了盾构机施工参数,有效保证了盾构掘进和周边环境的安全。

关 键 词:盾构施工  自动化监测  反馈控制  移动发布  
收稿时间:2016-04-02

Automatic monitoring and mobile data publishing system of ground settlement induced by shield tunneling
XIE Xiong-yao,LI Jun,WANG Qiang. Automatic monitoring and mobile data publishing system of ground settlement induced by shield tunneling[J]. Rock and Soil Mechanics, 2016, 37(Z2): 788-794. DOI: 10.16285/j.rsm.2016.S2.100
Authors:XIE Xiong-yao  LI Jun  WANG Qiang
Affiliation:1. Key Laboratory of Geotechnical and Underground of Ministry of Education, Tongji University, Shanghai 200092, China; 2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China
Abstract:Ground settlement monitoring is an important component of shield informatization construction, and it has a very important significance in optimization of shield tunneling parameters and safety of construction. In order to share and feedback monitoring results timely, improve efficiency of monitoring information management and data analysis, an automatic monitoring and mobile data publishing system of ground settlement is developed by using Microsoft Visual Studio. Net programming technology and MySQL database to realize 24 hour automatic acquiring, analysis and mobile publishing of monitoring data. And then the system is applied to the project of shield tunneling of Nanning Metro Line 1 traversing below tracks and buildings of Nanning Railway Station; the variation law of ground and track settlement caused by shield tunneling has been obtained. By the in-time feedback of monitoring data and analysis results, the construction parameters of shield machine is optimized so as to effectively ensure safety of shield tunneling and surrounding environment.
Keywords:shield construction  automatic monitoring  feedback control  mobile publishing  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号