首页 | 本学科首页   官方微博 | 高级检索  
     检索      

南水北调西线一期工程区断层活动性及工程地质评价
引用本文:柴建峰,伍法权,常中华,陶波.南水北调西线一期工程区断层活动性及工程地质评价[J].吉林大学学报(地球科学版),2005,35(1):64-69.
作者姓名:柴建峰  伍法权  常中华  陶波
作者单位:1. 中国科学院,地质与地球物理研究所,北京,100029
2. 石油大学,资源与信息学院,北京,102249
基金项目:国家自然科学基金 , 国家重点基础研究发展计划(973计划)
摘    要:南水北调西线一期工程位于青藏高原东部的边缘地带,海拔3 500 m以上,地质条件复杂,断层密集分布,褶皱强烈发育,构造活动频繁.通过ETM卫星影像和野外考察分析了工程引水隧洞线路区断层的空间分布及活动特征.工程区以桑日麻断裂、鲜水河断裂和甘德南断裂等对工程的影响最大,是潜在的发震断裂.深埋长引水隧洞在较高地应力作用下,软弱围岩及宽大断层带物质易产生大变形和长期流变.引水线路区褶皱、断层构造发育,有利于地下水富集、运移.在静、动水压力下,引水隧洞穿过断层及破碎带时易发生涌水、碎屑流和坍塌等地质灾害.

关 键 词:南水北调  西线工程  断层  深埋长隧洞  南水北调  西线一期工程  断层活动性  工程地质评价  Northern  China  Southern  Water  Line  Western  Project  Stage  Active  Faults  Problems  地质灾害  坍塌  碎屑流  涌水  发生  破碎带  过断层
文章编号:1671-5888(2005)01-0064-06
修稿时间:2004年2月16日

Main Engineering Geological Problems of Active Faults in the 1st Stage Project of Western Line for Transfering Water from Southern to Northern China
CHAI Jian-feng,WU Fa-quan,CHANG Zhong-hua,TAO Bo.Main Engineering Geological Problems of Active Faults in the 1st Stage Project of Western Line for Transfering Water from Southern to Northern China[J].Journal of Jilin Unviersity:Earth Science Edition,2005,35(1):64-69.
Authors:CHAI Jian-feng  WU Fa-quan  CHANG Zhong-hua  TAO Bo
Abstract:The first stage of the project, with an elevation of 3 500 m, which transfers water from the upper Yangtze River into the upper Yellow River, is located at the east edge of Qinghai-Tibet Plateau where the regional geological conditions are very complex, active faults are distributed over the project zone, strata are strongly folded and tectonic movements are frequently developed. Through ETM and exploring in site, analyze the distribution and the activity of active faults, evluate faults influences on the stability of deeply buried long tunnel. Sangrima Fault,Xianshuihe Fault and South Gande Fault have strong influence not only on the stability of tunnels but also on the regional tectonic stability of the project. Under high tectonic tress soft rock creep and big distortion are frequently developed. Water invasion, debris flow, collapse and paroxysmal dislocation of active faults are discussed in the paper.
Keywords:transfering water from southern to northern  western line project  fault  deeply buried long tunnel
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号