首页 | 本学科首页   官方微博 | 高级检索  
     

西部地区交通建设中的泥石流灾害与防治对策
引用本文:马东涛, 崔鹏, 祁龙, 杨坤, 王忠华. 2003: 西部地区交通建设中的泥石流灾害与防治对策. 工程地质学报, 11(2): 180-185.
作者姓名:马东涛  崔鹏  祁龙  杨坤  王忠华
作者单位:1.中国科学院、水利部成都山地灾害与环境研究所,成都610041;;2.中国科学院寒区旱区环境与工程研究所,兰州730000;;3.交通部第一公路勘察设计研究院,西安710068
基金项目:中国科学院知识创新工程项目 (批准号 :KZCX2 -3 0 6)资助 .
摘    要:我国西部地区铁路、公路交通干线共有泥石流灾害 4 70 0余处, 占全国道路泥石流灾害的 70 %以上。泥石流分布广泛, 成灾方式多样, 灾害严重, 制约了西部地区交通建设的发展。本文提出了做好路线方案比选, 防患于未然, 正确评判泥石流沟和发育现状, 工程设计要适合泥石流特点, 以及提高防灾减灾勘察设计水平, 开展泥石流防治试验示范工程研究等六条防治对策。

关 键 词:西部地区  铁路  公路  泥石流灾害  防治对策
文章编号:1004-9665/2003/11(02)-0180-06
收稿时间:2002-06-25
修稿时间:2002-06-25

DEBRIS FLOW HAZARDS ALONG THE MAIN TRAFFIC LINES IN WESTERN CHINA AND MEASURES FOR THEIR CONTROLLING
MA Dongtao, CUI Peng, QI Long, YANG Kun, WANG Zhonghua. 2003: DEBRIS FLOW HAZARDS ALONG THE MAIN TRAFFIC LINES IN WESTERN CHINA AND MEASURES FOR THEIR CONTROLLING. JOURNAL OF ENGINEERING GEOLOGY, 11(2): 180-185.
Authors:MA Dongtao  CUI Peng  QI Long  YANG Kun  WANG Zhonghua
Affiliation:1.Institute of Mountain Hazards and Environment, Chinese Academy of Sciences and Ministry of Water Conservancy, Chengdu 610041;;2.Cold and Arid Regions Environment and Engineering Research Institute, Chinese Academy of Sciences, Lanzhou 730000;;3.The First Highway Survey and Design Institute of Ministry of Communication, Xian 710068
Abstract:There are more than 4700 debris flow hazards along the main traffic lines of railway and highway in western China, which account for 70 percent of the debris flows along traffic lines in the whole country. Debris flows are distributed extensively, frequently cause serious damage and losses in traffic construction in western China region. A large number of studies and investigations, six measures for controlling debris flows in the paper, which are correctly distinguishing debris flow gullies and their development process strictly choosing suitable route, engineering design in donsideration of the characteristics of debris flow, rising survey and design level for mitigating and preventing disaster,and carrying out debris flow prevention testing and demonstrating works.
Keywords:Western China   Railway   Highway   Debris flow hazards   Controlling measures
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《工程地质学报》浏览原始摘要信息
点击此处可从《工程地质学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号