首页 | 本学科首页   官方微博 | 高级检索  
     

煤层气储层动态渗透率影响因素及排采管控措施
引用本文:王晴, 杨飞, 龚伟成, 徐天鑫, 李一超. 煤层气储层动态渗透率影响因素及排采管控措施[J]. 煤田地质与勘探, 2020, 48(2): 114-119. DOI: 10.3969/j.issn.1001-1986.2020.02.018
作者姓名:王晴  杨飞  龚伟成  徐天鑫  李一超
作者单位:1.长江大学 地球科学学院,湖北 武汉 430100
基金项目:国家自然科学基金;国家科技重大专项
摘    要:排采管控方法对煤层气储层动态渗透率具有显著影响。基于煤层气井不同排采阶段渗透率的主控因素,以提高和改善渗透率为目标,提出了针对性的排采对策。井底流压大于原始储层压力时,降压速度为0.03~0.05 MPa/d,可降低压裂液和速敏伤害;井底流压在原始地层压力和解吸压力之间时,以小于0.03 MPa/d的速度降压,避免加剧储层

关 键 词:煤层气井  动态渗透率  排采方法  降压速度  排采阶段
收稿时间:2019-10-07
修稿时间:2019-11-14

Influencing factors of the dynamic permeability of CBM reservoir and CBM well drainage control measures
WANG Qing, YANG Fei, GONG Weicheng, XU Tianxin, LI Yichao. Influencing factors of the dynamic permeability of CBM reservoir and CBM well drainage control measures[J]. COAL GEOLOGY & EXPLORATION, 2020, 48(2): 114-119. DOI: 10.3969/j.issn.1001-1986.2020.02.018
Authors:WANG Qing  YANG Fei  GONG Weicheng  XU Tianxin  LI Yichao
Affiliation:1.College of Geosciences, Yangtze University, Wuhan 430100, China
Abstract:The drainage and production control method has significant impact on the permeability of coalbed methane reservoir. Based on the main control factors of the permeability at different stages of drainage and production of coalbed methane wells, this paper puts forward targeted drainage and production countermeasures with the goal of improving the permeability. When the bottom-hole flow pressure was greater than the original reservoir pressure, the step-down velocity was between 0.08 and 0.1 MPa/d to reduce fracturing fluid and velocity-sensitive damage. When the bottom hole flow pressure was between reservoir pressure and desorption pressure, the pressure could be reduced at a rate less than 0.03 MPa/d to avoid aggravating the "permeability funnel" of the reservoir. When the desorption pressure was 0.2-0.3 MPa, the pressure decreased at the rate of 0.01 MPa/d. When the pressure was stabilized for 30 days near the desorption pressure, the casing pressure was controlled at about 0.2-0.3 MPa after desorption, so as to avoid the decrease of water-phase permeability caused by two-phase flow. The permeability of reservoir was improved by increasing matrix shrinkage with variable speed. In the stable production period, the reasonable stable production could be determined by increasing production per unit pressure drop to achieve long-term high and stable production of CBM wells. The field test shows that the method is effective. 
Keywords:CBM well  dynamic permeability  drainage and mining method  depressurization rate  stage of drainage
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《煤田地质与勘探》浏览原始摘要信息
点击此处可从《煤田地质与勘探》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号