Application of incremental displacement back analysis to underground power-house of Laxiwa Hydropower Station
Authors:JING Mao-gui  LI Ning  YAO Xian-chun  SUN Hong-chao
Institution:1. Institute of Geotechnical Engineering, Xi'an University of Technology, Xi'an 710048, China 2. State Key Lab. of Frozen Soil Eng., Cold and Arid Region Environmental and Engineering Research Institute, Chinese Academy of Sciences, Lanzhou 73000, China
Abstract:The displacement from back analysis has been extensively applied to underground projects because it can be measured conveniently, accurately and economically. A dynamic multi-step finite element model is established to simulate the excavation process of Laxiwa underground power-house using the large software FINAL which is introduced from Austria. The data of incremental displacement during the third layer’s excavation are applied to back analysis with the established finite element model to calculate parameters of initial geostress and elastic modulus. Finally, the results of back analysis are used to predict the stability of surrounding rocks during the later excavation. The comparison between computed and measured incremental displacements show a good coincidence, so as to prove the feasibility of the method.
Keywords:incremental displacement back analysis  initial stress fiold  elastic modulus  stability of surrounding rocks  
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号