Disposal construction and technology discussion of high pressure water
inflow in the extra long tunnel |
| |
Authors: | WEI Shu-min |
| |
Institution: | China TIESIJU Civil Engineering Group Co.Ltd, Jinan 200514, China |
| |
Abstract: | Combining with the engineering example, introduces the main constucion techniques, such as advance geologic forecast, precaution way of high pressure water blow-out and the curtain grouting blocking, which are adopted to deal with the high pressure water blow-out in the extra long tunnel. The paper also analyzes and discusses the construction process of the tunnel in the zones rich in karst and water. The available construction project is put forward. |
| |
Keywords: | tunnel engineering the advance geologic forecast the disposal of water blow-out |
|