首页 | 本学科首页   官方微博 | 高级检索  
     

沅古坪隧道选线的岩溶水文地质问题
引用本文:骆伟,吴华英,胡惠华,马德青,张鹏,李振兴. 沅古坪隧道选线的岩溶水文地质问题[J]. 中国岩溶, 2021, 40(2): 253-263. DOI: 10.11932/karst20210205
作者姓名:骆伟  吴华英  胡惠华  马德青  张鹏  李振兴
作者单位:1.湖南省交通规划勘察设计院有限公司/中南公路建设及养护技术湖南省重点实验室
基金项目:国家自然科学青年基金项目(41702281)
摘    要:避开突水突泥的高风险区是岩溶隧道选线的基本出发点.沅古坪隧道穿过岩溶强发育区,为典型的岩溶深长隧道.岩溶地下河、向斜蓄水构造、两侧水库以及地下水位与顶板的高差大等是影响其隧道安全建设的重要因素,也是选线要考虑的关键水文地质问题.为更好地进行隧道东、中、西三条设计线的比选,在隧道研究区开展了1:1万的岩溶水文地质专题调查...

关 键 词:岩溶隧道  选线  水动力分带  高水压  向斜储水构造

Karst hydrogeological problems in the route selection of Yuanguping tunnel
LUO Wei,WU Huaying,HU Huihu,MA Deqing,ZHANG Peng,LI Zhenxing. Karst hydrogeological problems in the route selection of Yuanguping tunnel[J]. Carsologica Sinica, 2021, 40(2): 253-263. DOI: 10.11932/karst20210205
Authors:LUO Wei  WU Huaying  HU Huihu  MA Deqing  ZHANG Peng  LI Zhenxing
Affiliation:1.Hunan Provincal Communication Planning Survey&Design Institute Co. Ltd./Hunan Provincial Key Laboratory of Highway Construction and Maintenance Technology of Southern China2.Institute of Karst Geology/Key Laboratory of Karst Dynamics, MNR&GZAR
Abstract:Avoiding high-risk areas of gushing water and mud is the basic principal for karst tunnel selection. The Yuanguping tunnel is a typical long and deep karst tunnel,which passes through the area with strong karst development. There are some important factors affecting the safty of tunnel construction,such as karst underground river, syncline water storage structure, reservoirs on both sides, and the large height difference between the groundwater level and the roof,,which are also key hydrological issues to be considered in route selection. To better compare and select the three design lines of the east, middle and west of the tunnel, a 1:10,000 special survey of karst hydrogeology was carried out in the tunnel working area.The karst development and hydrogeological characteristics of the working area were found out, and the karst groundwater system was divided, so as to compare the horizontal and vertical zoning of the three tunnel routes. The spatial relationship between tunnel and underground rivers and karst springs was analyzed, and the influence of syncline water storage structure was analyzed combined with geophysical data. The results show that: the east route tunnel passes through the surface watershed zone and is located in recharge area of the karst hydrodynamic system and the seasonal variation zone and shallow saturated zone of the vertical distribution zone. It basically does not intersect with underground river pipelines and is far away from karst springs with large flows, the rainfall replenishment area is the smallest, therefore, the overall risk of water gushing is the smallest, which is the best tunnel route. The west route runs through the middle of the groundwater system Ⅲ in the upper reaches of Chixi river passes through the runoff and drainage area,and is located in a shallow saturated zone with karst hydrodynamic vertical zoning. It intersects with multiple karst pipelines,and is close to the west side of Gaojiaxi reservior,with the greatest risk of water gushing. The northern section of the east route tunnel near Huangyuxi reservoir and the southern section passing through the Guojiajie syncline water storage structure are all high-risk areas for water gushing. Therefore,it is necessary to expand the supplementary survey of karst hydrogeology, and strengthen the research of advanced geological forecast during construction so as to avoid karst geological disasters to the most extent. 
Keywords:karst tunnel   route selection   hydrodynamic zoning   high water pressure   syncline water storage structure
本文献已被 CNKI 等数据库收录!
点击此处可从《中国岩溶》浏览原始摘要信息
点击此处可从《中国岩溶》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号