首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Recent sea-level changes and related engineering problems in the Lagoon of Venice (Italy)
Authors:Paolo Antonio Pirazzoli
Abstract:In the city of Venice, where the average altitude is only a few tens of centimetres, there has been a dangerous increase in the frequency of flooding during the past few decades.Since 1872, the average increase in flooding levels (“acqua alta”) has been about 40cm: 27cm of this is due to the local rise in mean sea-level (of which some 14cm are related to man-induced subsidence of land, and 3–7cm to geological factors), and at least 14cm are caused by hydrodynamical factors, of which about 10cm can be ascribed to man-induced tidal changes. These latter are due above all to the dredging of deep artificial channels, the reclamation of wide areas of tidal flats, and the diking of fish ponds (“valli”), which have changed the ratio between the surface of the lagoon and that of the inlets. Since the latest modification (1963–1969), the lagoon has been open to large oil tankers, thereby allowing an easier entry of storm surges arising out at sea.Indeed an incompatibility exists between the accessibility of very large boats to the lagoon and the safeguard of Venice. Several engineering projects have been proposed with a view to improving the present critical situation. These projects include underground injections to raise the islands, the construction of new embankments, a reduction in the size of the passes, new access to wide areas for the tide, and the construction of flood gates at the passes. The reliability and effects of these projects are analysed and discussed.In conclusion, the removal of the oil terminal from the lagoon and a stricter control of water pollution are considered the most urgent preliminary actions for a long term solution of the flooding problem. This would enable a decrease in the exchanges between the lagoon and the sea, without, however, reducing the depth of the navigation channels to levels inconsistent with most of the present non-oil traffic. A final measure would be the construction of mobile gates at the passes which would permanently protect the lagoon against flooding.The solution put forward here differs however from the project proposed by a group of experts appointed by the Italian government, which aims at keeping the oil terminal inside the lagoon, thus maintaining the navigation channels at depths which increase hydrodynamic effects and make any sedimetological equilibrium in the lagoon impossible.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号