Problems and countermeasures in construction of transmission line projects in permafrost regions
Authors:GuoShang Wang  QiHao Yu  YanHui You  Ze Zhang  Lei Guo  ShiJun Wang and Yong Yu
Institution:Gansu Electric Power Design Institute, Lanzhou, Gansu 730050, China;State Key Laboratory of Frozen Soil Engineering, Cold and Arid Regions Environmental and Engineering Research Institute, Chinese Academy of Sciences, Lanzhou, Gansu 730000, China;State Key Laboratory of Frozen Soil Engineering, Cold and Arid Regions Environmental and Engineering Research Institute, Chinese Academy of Sciences, Lanzhou, Gansu 730000, China;State Key Laboratory of Frozen Soil Engineering, Cold and Arid Regions Environmental and Engineering Research Institute, Chinese Academy of Sciences, Lanzhou, Gansu 730000, China;State Key Laboratory of Frozen Soil Engineering, Cold and Arid Regions Environmental and Engineering Research Institute, Chinese Academy of Sciences, Lanzhou, Gansu 730000, China;Gansu Power Transmission Transformation Company, Lanzhou, Gansu 730050, China;Gansu Electric Power Design Institute, Lanzhou, Gansu 730050, China
Abstract:Construction of power transmission lines is becoming an important part of permafrost engineering in China. This paper reviews the construction status and problems of transmission lines in different countries, as well as corresponding solutions that would be of practical significance for sustainable engineering practices. Russia has the longest history of transmission line construction in permafrost areas, with transmission lines (mainly 220 kV and 500 kV) spanning approximately 100,000 km. However, all countries suffer from permafrost-related tower foundation stability problems caused by freezing- thawing hazards such as frost heave and thaw settlement, frost lifting, and harmful cryogenic phenomena. As point-line transmission line constructions, the lines, poles and towers should be reasonably selected and installed with a comprehensive consideration of frozen soil characteristics to effectively reduce the occurrence of freezing-thawing disasters. Reinforced concrete pile foundations are widely used in the permafrost regions, and construction in winter is also a universal practice. Moreover, facilitating engineering measures like thermosyphons are an effective way to reduce freezing- thawing hazards and to maintain the stability of tower foundations.
Keywords:permafrost  transmission line  key issues  analysis
本文献已被 维普 等数据库收录!
点击此处可从《寒旱区科学》浏览原始摘要信息
点击此处可从《寒旱区科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号