Abstract: | Summary This study discusses the efficiency of some dispositions to be considered for a combined sewerage system. The annual amounts
of settleable solids and B.O.D. which may be eliminated have been calculated for various combinations of settings of storm-water
over-flow weirs and volumes of storage tanks, as well as for aariable performances of the sewage treatment plant. The storm-water
storage tanks were found to be an efficient help when high purification requirements must be met.
Relationships between rainfall and runoff, the duration of runoff and the quality of waste-water in the combined sewerage
system have been carefully considered.
A further chapter deals with the relationship between the required concentration of the final effluent and the dimension of
the aeration basin of an activated sludge plant.
Résumé Cette étude s’occupe de l’efficacité de quelques mesures qui devraient être prévues dans la construction d’un système d’égout
combiné. Les quantités annuelles en matières décantables et en D.B.O. qui peuvent être éliminées ont été calculées en combinant
des réglages variés des déversoirs d’orage, des rendements variés de la station d’épuration et des différentes dimensions
de décanteurs pour les eaux pluviales. Ces derniers se révélaient très utiles si l’on exige une épuration poussée.
On a considéré particulièrement la relation entre la chute et le ruissellement de la pluie, la durée des débits et le degré
de pollution dans les égouts du système unitaire.
Enfin, l’auteur s’est occupé de la relation entre la concentration prescrite de l’effluent final et le volume du bassin d’aération
d’une station à boue activée.
|