首页 | 本学科首页   官方微博 | 高级检索  
     检索      

ABRASION OF THE BOTTOM OUTLETS AND ITS REPAIR IN SANMENXIA PROJECT
作者单位:WEI Yonghui Senior engineer,The Three Gorges Project Development Incorporated
摘    要:


ABRASION OF THE BOTTOM OUTLETS AND ITS REPAIR IN SANMENXIA PROJECT
Authors:WEI Yonghui Senior engineer  The Three Gorges Project Development Incorporated
Abstract:The Sanmenxia Project completed in 1960 is a multi-purpose hydro project with emphasis on flood control. After the expounding, serious deposition occurs in the upstream part of the reservoir and the Weihe River. The project has to be rebuilt twice in the period from 1964 to 1978. Thus the discharge capacity is greatly enlarged by excavating two side tunnels on the left bank, converting three penstocks into sluice conduits and reopening & bottom outlets formerly used for di- version. By changing the operational mode from storing water year round to stor- ing clear water during the dry season and sluicing sediment during the flood season, the sediment problem of the reservoir is largely solved and multi-purpose benefits of the project are partially retained. But the heavy sediment load still caused serious abrasion on bottom outlets and turbines, particularly on the inlet gate slot, the service gate slot and the floor. Much effort has been made to clarify the mechanism of the damage and to choose abrasion-resistant material for repair. The repair of the bottom outlets has been going on since 1980. This paper describes the abrasion on the bottom outlets in details and the subsequent repair effected.
Keywords:Abrasion  Sediment concentration  Sediment-laden flow  Cavitation  Abrasion-resistant material    Bottom outlet  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号