Anchor deployment for deep water floating offshore equipments |
| |
Authors: | O. B. Augusto B. L. Andrade |
| |
Affiliation: | Naval Architecture and Ocean Engineering Department, Escola Politécnica da Universidade de, São Paulo, Brazil |
| |
Abstract: | In this work a planning methodology for deep water anchor deployment in offshore platforms and floating production systems aiming at operational resources optimization is explored, by minimizing a multi criteria objective function. As an additional advantage provided by the proposed methodology, planning automation is achieved. Planning automation overcomes the traditional way, using a trial error basis. With it, an engineer, using an anchoring software, decides how much work wire and anchoring line must be paid out from both the floating system and the tug boat. Additionally, he decides which horizontal force must be applied to the line, trying to settle the anchor on a previously defined target on the ocean floor. |
| |
Keywords: | Anchorage Oil platforms Optimization Multiple criteria |
本文献已被 ScienceDirect 等数据库收录! |
|