首页 | 本学科首页   官方微博 | 高级检索  
     

永定河官厅水库下游河道内生态需水量研究
引用本文:门宝辉,张士锋,夏军. 永定河官厅水库下游河道内生态需水量研究[J]. 资源与生态学报(英文版), 2010, 1(3): 215+211-214. DOI: 10.3969/j.issn.1674-764x.2010.03.003
作者姓名:门宝辉  张士锋  夏军
作者单位:1. 华北电力大学,可再生能源学院,生物质发电成套设备国家工程中心,北京,102206
2. 中国科学院地理科学与资源研究所,陆地水循环及地表过程重点实验室,北京,100101
基金项目:supported by the Item of Yongding River ecological architecture;the restoration of technology research and demonstration,Open Research Fund Program of State Key Laboratory of Water Resources and Hydropower Engineering Science(No.2009B050);the National Natural Science Foundation of China(No.50809027)
摘    要:作为北京市母亲河的永定河自上个世纪80年代以来三家店以下一直处于断流,河床裸露、河道两岸土地沙化严重,是北京春季沙尘天气的主要沙源之一,由于地下水超采严重,加之无水补给地下水,使得北京西部地区第四纪地下水已经基本枯竭,永定河的生态系统已经受到严重破坏。要想恢复或治理受损的河道生态环境,作为生态系统中最活跃最重要的水分多少要先算清楚。本文采用湿周法计算了永定河官厅水库下游三个控制断面(官厅水库(坝下)、雁翅、卢沟桥)的河道内生态需水流量,计算结果为:官厅水库(坝下)站的河道内流量为3.7m~3 s~(-1)。(平水年P=50%,1978年),占年平均流量的20.7%,雁翅站的河道内流量为4.1m~3 s~(-1)(平水年P=50%,1981年),占年平均流量的20.1%,卢沟桥站的河道内流量为1.3m~3 s~(-1)(平水年P=50%,1978年),占年平均流量的22.1%。若能按照计算的流量来补充河道水量,即可使永定河恢复其基本的生态功能,按照Tennant法的标准,基本能使当地的河道生态系统处于较为良好的状态。

关 键 词:湿周法  永定河  生态需水  Tennant法

The Instream Ecological Water Flow Research at the Lower Reach of Guanting Reservoir on Yongdinghe River,Beijing
MEN Baohui,ZHANG Shifeng,XIA Jun. The Instream Ecological Water Flow Research at the Lower Reach of Guanting Reservoir on Yongdinghe River,Beijing[J]. Journal of Resources and Ecology, 2010, 1(3): 215+211-214. DOI: 10.3969/j.issn.1674-764x.2010.03.003
Authors:MEN Baohui  ZHANG Shifeng  XIA Jun
Affiliation:1 National Engineering Laboratory for Biomass Power Generation Equipment,Renewable Energy Institute,North China Electric Power University, Beijing 102206,China; 2 Key Laboratory of Water Cycle & Related Land Surface Processes,Institute of Geographic Sciences and Natural Resources Research,CAS,Beijing 100101,China
Abstract:Yongding River, as the mother river of Beijing city, has been dried up from Sanjia Dian since 1980s. The naked riverbed and the desertification of its both sides play a main role of sandy weather in spring of Beijing. The Quaternary period underground water of the west Beijing has been drained off,because of the overload of the underground water plus with no supply pouring into. The ecological system of Yongding River has severely been devastated. If we want Yongding River to be recovered, we should clarify the quantity of the most active and the most important water. This paper calculated the instream ecological flow in three monitored sections of Yongding River Guanting Reservoir with wetted perimeter method. The three sections are Guanting Reservoir (under dam), Yanchi and Lugou Bridge. Respectively,the flows in the instream of each section are 3.7 m3s-1 (the normal flow year, P=50%, 1978) accounting for 20.7% of the average annual flow, 4.1 m3s-1(the normal flow year, P=50%, 1981)accounting for 20.1% of the average annual flow and 1.3 m3s-1(the normal flow year, P=50%,1978)accounting for 22.1% of the average annual flow. If the supplies are according to the calculated flows, Yongding River will return back from it. Still according to the Tennant method, the Yongding River will maintain a health situation.
Keywords:wetted perimeter method  Yongding River  ecological water flow  Tennant method
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号