地质灾害防治工程的投资控制
引用本文:吴宝和. 地质灾害防治工程的投资控制[J]. 探矿工程, 2008, 35(7): 44-45,63
作者姓名:吴宝和
作者单位:中国地质科学院探矿工艺研究所
摘    要:介绍了地质灾害防治工程的特点,并根据这些特点论述了如何在前期确定地质灾害防治工程的合理造价,工程施工过程中发生的设计变更或其他与合同和工程量清单不一致的地方进行记录并签证,为以后的索赔作准备。在结算阶段要做好索赔工作。

关 键 词:地质灾害防治工程;投资控制  工程造价  索赔
收稿时间:2008-05-31

Investment Control of Control Works for Geological Hazard
WU Bao-he. Investment Control of Control Works for Geological Hazard[J]. Exploration Engineering:Rock & Soil Drilling and Tunneling, 2008, 35(7): 44-45,63
Authors:WU Bao-he
Affiliation:The Institute of Exploration Technology, CAGS
Abstract:This paper introduced the characteristics of control works for geological hazard; and according to these characteristics, how to determine the cost in reason in the preceding construction was also presented. It should be recorded and vised if the original design was changed and the item was different to the contract or the bill quantity in order to get the possible claiming compensation later.
Keywords:control works for geological hazard   investment control   project construction cost   claim