首页 | 本学科首页   官方微博 | 高级检索  
     检索      


River channel adjustments downstream from channelization works in England and Wales
Authors:Andrew Brookes
Abstract:Relatively little attention has been given to river channel adjustments that occur downstream from channelization works. This study is concerned with the nature of channel adjustments downstream from a total of 46 channelization works located in low and high energy environments in England and Wales. Channel changes are identified principally by the method of field survey and by reconstructing the original positions of eroded beds and banks. Use is also made of maps, aerial photographs, and engineering drawings of different dates and the technique of space-for-time substitution is applied. Enlargement of channel cross-sections through erosion had occurred downstream from a variety of types, sizes, and dates of channelization works. The maximum increase of channel size was 153 per cent. Out of a total of 14 sites with enlarged channel cross-sections, seven had undergone a change of width only, at a further three width increased rather than depth, and at the remaining four sites depth increases were dominant. These sites all have relatively high stream powers. Factors causing spatial variation of erosion included tree roots locally binding bank sediments and the occurrence of bends. Planform change had taken place at only one site. A further three high stream power sites had downstream reaches incised into bedrock and therefore did not exhibit adjustment. Channel enlargement is explained in terms of increased flood flows downstream from channelization works causing higher stream velocities, which in turn cause erosion, thereby increasing channel width and/or depth. Examination of flow records for 35 stations revealed flood events which would formerly have spread overbank but are now confined by the channelization works and are therefore likely to alter downstream flows. At sites with downstream change it is proposed that the energy of increased flows was sufficient to exceed a threshold required for erosion of perimeter sediments. By contrast the absence of change at a majority of sites in low energy lowland areas could be a reflection of both the incompetence of increased flows to erode and resistance provided by perimeter sediments. Sites with erosion features appear not to have yet attained new equilibrium conditions.
Keywords:Human impact  River channelization  Engineering works  Morphological adjustments  Downstream effects
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号