首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Comparison and correlation between the laboratory,semi-theoretical and empirical methods in predicting the field excavation performance of tunnel boring machine (TBM)
Authors:Pan  Yucong  Liu  Quansheng  Liu  Qi  Bo  Yin  Liu  Jianping  Peng  Xingxin  Cai  Tao
Institution:1.Key Laboratory of Safety for Geotechnical and Structural Engineering of Hubei Province, School of Civil Engineering, Wuhan University, Wuhan, 430072, Hubei, People’s Republic of China
;2.Changjiang Institute of Survey, Planning, Design and Research , Wuhan, 430010, Hubei, People’s Republic of China
;3.College of Water Conservancy and Hydropower Engineering, Sichuan Agricultural University, Ya’an, 625014, Sichuan, People’s Republic of China
;4.China Railway 11th Bureau Group 4th Engineering Co., Ltd., Wuhan, 430074, Hubei, People’s Republic of China
;5.China Construction Third Engineering Bureau Co., Ltd., Wuhan, 430064, Hubei, People’s Republic of China
;
Abstract:Acta Geotechnica - Many methods have been proposed to predict the field excavation performance of tunnel boring machine (TBM). They can usually predict the general trends of the field rock cutting...
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号