首页 | 本学科首页   官方微博 | 高级检索  
     

基于ASTER的喀斯特流域地表水系自动提取研究——以贵州省为例
引用本文:贺中华,梁虹,黄法苏,赵芳,杨梅. 基于ASTER的喀斯特流域地表水系自动提取研究——以贵州省为例[J]. 中国岩溶, 2007, 26(4): 356-362
作者姓名:贺中华  梁虹  黄法苏  赵芳  杨梅
作者单位:1.贵州师范大学地理与生物科学学院 2.贵州省水文水资源局 3.白云区第三中学 4.贵州省贵阳市第九中学
基金项目:贵州省青年基金;贵州省科学技术基金
摘    要:根据喀斯特流域孤峰和峰林在ASTER影像上表现为色调深浅不一的“桔皮状”和“花生壳状”图形,河流和湖泊色调较深,湿地和干谷色调相对较浅等影像特征,对贵州省内32个典型的喀斯特流域进行数字高程和地表水系提取。结果表明,利用ASTER影像提取喀斯特地表水系简便快捷、准确率高。与从1: 25万水文地质图提取的水系进行对比, ASTER所提取的水系其流域面积最大的相对误差为4. 5892% ,主河道长度最大的相对误差为3. 5693% ,河网密度最大的相对误差也只有7. 2564% ; 从地图提取的水系最多只能达到二级支流,提取的河流相对较短,而从DEM 提取的水系可达三级,有些甚至达四级、五级以上,且提取的河流更长,提取的水系更完整。 

关 键 词:喀斯特流域   ASTER影像   DEM   地表水系
文章编号:1001-4810(2007)04-0356-07
收稿时间:2007-05-08
修稿时间:2007-05-08

ASTER supported research on automatic extraction of karst surface water-A case in Guizhou province
HE Zhong-hu,LIANG Hong,HUANG Fa-su,ZHAO Fang and Yang Mei. ASTER supported research on automatic extraction of karst surface water-A case in Guizhou province[J]. Carsologica Sinica, 2007, 26(4): 356-362
Authors:HE Zhong-hu  LIANG Hong  HUANG Fa-su  ZHAO Fang  Yang Mei
Affiliation:1.School of Geography and Biology, Guizhou Normal University 2.Department of Hydrology and Water-recource 3.The No.3 Middle school of Baiyun District 4.The No.9 Middle School of Guiyang City
Abstract:DEM and surface river system of 32 typical karst basins are extracted according to the ASTER image showed by the isolated peak and peak forest as well as other landforms in karst basin.The ASTER image assume to different features as following,the isolated peak and peak forest assume to tones and pattern of orange skin and peanut hull,the hue of river and lake are deeper and wet land and dry grain relatively lighter.The results show that to extract surface river system by means of ASTER is simple and fast and accurate.Contrasting to extract river system by hydrogeological map of 1:250 000 scale,maximal proportional error of drainage area extracting by ASTER is 4.589%,maximal proportional error of the main river length 3.569 3%,and river network density 7.256 4%.To extract river system by hydrogeologic map,it can only reach the 2nd grade branch and the river length relatively shorter;but can reach 3rd even 4th or 5th grade branch and the river length is much longer by DEM.
Keywords:DEM
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《中国岩溶》浏览原始摘要信息
点击此处可从《中国岩溶》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号