A Combined Dry Jet Mixing-Prefabricated Vertical Drain Method for Soft Ground Improvement: A Case Study
Authors:Zhang Dingwen  Liu Songyu  Han Wenjun  Du Guangyin
Affiliation:1. School of Transportation, Southeast University , Nanjing , China zhangdw@seu.edu.cn;3. School of Transportation, Southeast University , Nanjing , China
Abstract:A remarkable combined dry jet mixing (DJM) and prefabricated vertical drains (PVDs) method was used to enhance the performance for soft ground improvement. In the combined method, PVDs are first installed and then DJM columns are installed between the PVDs at larger spacing. This combined method improves the effectiveness of the ground improvement and creates a more economical solution. This paper presents a case study of the combined method for marine clay improvement in Lianyugang of China. The excess pore water pressure in soils created by the installation of DJM columns with and without PVDs was monitored and compared. In situ standard penetration tests were conducted in the DJM columns and before-and-after piezocone penetration tests were performed in soils surrounding the columns. Long-term settlement monitoring under embankment loading was carried out for the ground improved by combined method and DJM method alone. The field tests, settlement monitoring and economic benefit analysis results demonstrated that the DJM-PVD method is technologically sound and cost-effective as compared with the conventional DJM method.
Keywords:case study  combined DJM-PVD method  dry jet mixing  embankment  marine clay  prefabricated vertical drains
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号