首页 | 本学科首页   官方微博 | 高级检索  
     

水中超深大沉井施工期间侧压力现场监测研究
引用本文:蒋炳楠,马建林,褚晶磊,李孟豪,李军堂,徐力. 水中超深大沉井施工期间侧压力现场监测研究[J]. 岩土力学, 2019, 40(4): 1551-1560. DOI: 10.16285/j.rsm.2017.2170
作者姓名:蒋炳楠  马建林  褚晶磊  李孟豪  李军堂  徐力
作者单位:1. 西南交通大学 土木工程学院,四川 成都 610031;2. 中铁大桥局集团有限公司,湖北 武汉 430050;3. 中国中铁大桥勘测设计院集团有限公司,湖北 武汉 430056
基金项目:中国铁路总公司科技研究开发计划(No. 2013G001-A-2);国家重点研发计划专项课题、区域综合交通基础设施安全保障技术 (No.2016YFC2203)。
摘    要:以目前世界规模最大沉井基础——沪通大桥29#沉井的施工为背景,对沉井整个施工过程开展现场监测试验,分析监测数据,得出朗肯静止土压力理论和规范算法与实测数据相比存在较大误差。采用折线分布推算也因侧压力影响因素较多,分布规律复杂,所得结果较差。再分别对沉井下沉和接高施工期间侧压力的大小和分布特性的影响因素进行研究,得出了侧压力在沉井下沉阶段和接高阶段的主要影响因素为沉井倾斜、沉井埋深、外井壁台阶设置和压力松弛影响范围。通过对比分析,对各种因素的产生原因和影响机制进行了说明。在消除沉井倾斜对水中超深大沉井侧压力影响后,确定了侧压力在沉井侧壁上沿深度的分布形式,并建立侧摩阻力计算模型。

关 键 词:沉井基础  侧压力  下沉  
收稿时间:2017-10-29

On-site monitoring of lateral pressure of ultra-deep large and subaqueous open caisson during construction
JIANG Bing-nan,MA Jian-lin,CHU Jing-lei,LI Meng-hao,LI Jun-tang,XU Li. On-site monitoring of lateral pressure of ultra-deep large and subaqueous open caisson during construction[J]. Rock and Soil Mechanics, 2019, 40(4): 1551-1560. DOI: 10.16285/j.rsm.2017.2170
Authors:JIANG Bing-nan  MA Jian-lin  CHU Jing-lei  LI Meng-hao  LI Jun-tang  XU Li
Affiliation:1. School of Civil Engineering, Southwest Jiaotong University, Chengdu, Sichuan 610031, China; 2.China Railway Major Bridge Engineering Group Co., Ltd., Wuhan, Hubei 430050, China; 3. China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd., Wuhan, Hubei 430056, China
Abstract:On the basis of construction of the No.29 open caisson of Hutong Bridge, which is the largest open caisson in the world, in-site monitoring tests were carried out on the entire process of the open caisson construction. By analyzing the monitoring data, it is concluded that results predicted by Rankine's theory of stationary earth pressure and its normative algorithm are significantly different from the measured data. The result of polyline distribution projection is not satisfactory because there are many influencing factors of lateral pressure and its distribution is complicated. Then, the influencing factors on the size and distribution of lateral pressure during the sinking and subsequent construction of caisson are studied. It is concluded that the main influencing factors of the lateral pressure during the sinking stage and the heightening stage are the slant of caisson, the depth of caisson, the step setting of caisson sidewall and the range of pressure relaxation. The causes and mechanism of various factors are explained based on comparison and analysis. The distribution of lateral pressure along the vertical caisson sidewall and the side frictional resistance calculation model are determined after eliminating the effect of the caisson slant on the lateral pressure of the ultra-deep large and subaqueous open caisson.
Keywords:open caisson  lateral pressure  sinking  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号