基金项目:科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题资助 中国地质科学院探矿工艺研究所、汶川地震科学钻探工程中心钻井工程部的领导和专家在WFSD-2孔0-897.66m段施工过程中给予了全面指导、支持和帮助.特别是对施工中技术难题的解决提出了宝贵的意见和建议.在本文的编写、修改中,给予了悉心指导,提出了宝贵的意见,在此对他们表示衷心的感谢!
摘    要:汶川地震断裂带科学钻探工程WFSD-2孔钻探工程技术质量要求高,其中,孔斜及取心率尤为重要。但其上部(≤600m)花岗岩、花岗闪长岩、变质火山岩坚硬致密,局部裂隙发育,裂隙面、小断层多且断层倾角大,易造斜,造成岩心堵塞。钻孔结构较复杂,采用大口径牙轮钻进孔斜难以控制,纠斜钻进难度大。二开(47.8—638.01m)施工,从80—311.39m顶角/方位角由0.7°/202.9°到5.8°/222.7°。其后,采用5LZ120×7.0L-5(0.5°、0.75°弯外管)螺杆马达纠斜。从317.43—456.12m顶角/方位角由6.0°/228.3°纠正到0.9°/103.7°,取得了理想的效果。就孔斜及纠斜施工进行总结、分析和归纳。

关 键 词:大口径  科学钻探  孔斜  纠斜  汶川地震断裂带
收稿时间:2011-10-31
修稿时间:2011-10-31

Analysis on the Second Opening of WFSD-2 Hole and Deviation Correction Construction
LI Hai-ming. Analysis on the Second Opening of WFSD-2 Hole and Deviation Correction Construction[J]. Exploration Engineering:Rock & Soil Drilling and Tunneling, 2012, 39(1): 21-24
Authors:LI Hai-ming
Affiliation:LI Hai-ming ( Beijing Geological Engineering Design Institute, Miyun Beijing 101500, China)
Abstract:WFSD - 2 hole of scientific drilling engineering of Wenchuan earthquake fault zone has high quality requirement, and the hole deviation and coring rate are especially important. But the granite, granodionite and metavolcanic rocks in upper part (≤600m) are hard and compact with fracture development, many fracture surfaces and small faults; the big fault dip made deviation easily occur with core blockage. Because of complicated bore hole structure, the deviation was difficult to control by large diameter roller bit drilling. The satisfied effect was received by second opening(47. 8 -638.01m) construction:in 80 - 311.39m section, top angle/azimuth angle from 0. 7 °/202. 9° to 5. 8 °/222. 7 °; then 5 LZ120 × 7. 0L - 5 screw motor was used in 317.43 ° 456. 12m section, top angle/azimuth angle were corrected from 6. 0° /228.3° to 0.9 °/103.7° . The paper summed up and analyzed the construction of deviation correction.
Keywords:large diameter  scientific drilling  hole deviation  deviation correction  Wenchuan earthquake fault zone