首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   118篇
  免费   108篇
  国内免费   106篇
地球物理   10篇
地质学   299篇
海洋学   17篇
综合类   2篇
自然地理   4篇
  2023年   3篇
  2022年   8篇
  2021年   10篇
  2020年   19篇
  2019年   12篇
  2018年   23篇
  2017年   15篇
  2016年   19篇
  2015年   19篇
  2014年   14篇
  2013年   18篇
  2012年   22篇
  2011年   21篇
  2010年   19篇
  2009年   11篇
  2008年   14篇
  2007年   11篇
  2006年   18篇
  2005年   10篇
  2004年   10篇
  2003年   7篇
  2002年   3篇
  2001年   3篇
  2000年   4篇
  1999年   4篇
  1998年   3篇
  1997年   5篇
  1996年   3篇
  1995年   2篇
  1991年   1篇
  1990年   1篇
排序方式: 共有332条查询结果,搜索用时 156 毫秒
1.
This work deals with disposal of slurries generated during the cutting and polishing processes of slabs of decorative sedimentary carbonate rocks in the north western Sicily. At present, they are used as fillers of dismantled quarries near the sawmills and, as a final step of reclamation, are covered with earth layers. In spite of such inexpensive solution, there is lack of knowledge about the composition of the waste. In order to assess if there is any threat for the environment and to suggest indications for alternative solutions, such as recycling or inactivation processes, the slurries were analysed by XR diffraction, simultaneous thermal analysis, ICP/MS, ionic chromatography, FTIR, UV-Vis, COD and TOC measurements, grain size analysis. Results indicate that the slurries can threaten the groundwater, because of the high chemical oxygen demand; furthermore they can modify the mechanism of groundwater recharge, because of their grain size distribution. Some laboratory tests show that, even in very aggressive conditions, the solid pollutants persist in the waste and slowly release into water the products of their degradation. The slurry therefore should be subjected to inactivation treatment before disposal or, alternatively, recycled as secondary raw material for a suitable process.  相似文献   
2.
A numerical model for the self-burial of a pipeline trench is developed. Morphological evolutions of a pipeline trench under steady-current or oscillatory-flow conditions are simulated with/without a pipeline inside the trench. The oscillatory flow in this study represents the action of waves. The two-dimensional Reynolds-averaged continuity and Navier-Stokes equations with the standard k-e turbulence closure, as well as the sediment transport equations, are solved with the finite difference method in a eurvilirrear coordinate system. Both bed and suspended loads of sediment transport are included in the morphological model. Because of the lack of experimental data on the backfilling of pipeline trenches, the numericalmodel is firstly verified against three closely-relevant experiments available in literature. A detailed measurement of the channel migration phenomenon under steady currents is employed for the assessment of the integral performance of themodel. The two experimental results from U-tube tests are used to validate the model‘s ability in predicting oscillatory flows. Different time-marching schemes are employed for the morphological computation under unidirectional and oscillatory conditions. It is found that vortex motions within the trench play an important role in the trench development.  相似文献   
3.
Study on Key Technology of Using Shell Sand as Backfill for Sea Reclamation   总被引:1,自引:0,他引:1  
1 .IntroductionEpicontinental sea or land could formfromcontinental shelf because of the decreasing sea levelduring Quaternary.There is a large-area shell sand deposit more than ten meters thick in the neriticzone of China .To use the abundant marine shell sandresource as engineering material for ocean engi-neering and port engineeringis veryimportant .Sand (Gred and Bjorn,1999) ,fine sand (Zhangetal .,2002) , mediumand coarse sand (Qiuet al .,1995) ,highly weathered stone ballast (Zhanetal…  相似文献   
4.
场地回填土与搅拌桩施工顺序将直接影响软土地坪复合地基的处理效果,其中沉降控制是影响地坪安全运行的关键。以近海软土地区工业厂房水泥土搅拌桩复合地基工程为例,探讨了复合地基水泥土搅拌桩、回填土两种不同施工顺序的影响因素及相应处理效果;通过数值模拟试验,计算分析了不同填土厚度下两种工况的地基固结总沉降、施工沉降、工后沉降。结果表明,采用“先土后桩”的施工顺序的施工期沉降大于“先桩后土”,但工后沉降大大减小,提高了软土地坪地基处理效果,有利于处理后地坪的安全运行,验证了前述分析结论,为合理设计方案的确定提供了重要的参考依据。  相似文献   
5.
Small-diameter shallow tunnels are often being built by using the slurry pipe-jacking method. This system involves the pushing or thrusting of a drivage machine and concrete pipes into the ground. Chemical grout injection into the surrounding soil around the tunnel is carried out after the drivage and pushing processes are finished. The purpose of the chemical grout injection is to maintain permanent stability of the surrounding soil. However, the behavior of the chemical grouting material in the surrounding soil around the tunnel and the amount of optimum injection is not clearly understood. From these points of view, this paper discusses the performance of the chemical grouting material, when it is injected into the surrounding soil around the tunnel, by means of 2-D Eulerian–Lagrangian seepage analysis. Moreover, the effectiveness of the chemical grout injection was evaluated by using the non-linear finite element method. This investigation show when the range of the grouted zone is designed; it is necessary that the relationship between Young’s modulus of the soil/grouted zone and the confining stress be taken into consideration in order to establish effective, economical and safe chemical grout injection system. Understanding the performance of the seepage/dispersion behavior of the chemical grout and the characteristics of soil/ grouted zone is also important.  相似文献   
6.
Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of the underground pipelines of sewage systems. Pipe jacking, in its traditional form, has occasionally been used for short railways, roads, rivers, and other projects. Basically the system involves the pushing or thrusting of concrete pipes into the ground by a number of jacks. In slurry pipe jacking, during the pushing process, mud slurry and lubricant are injected into the face and the over cutting area that is between the concrete pipes and the surrounding soil. Next, the slurry fills voids and the soil stabilizes due to the created slurry cake around the pipes. Fillings also reduce the jacking force or thrust during operation. When the drivage and pushing processes are finished, a mortar injection into the over cutting area is carried out in order to maintain permanent stability of the surrounding soil and the over cutting area. Successful lubrication around the pipes is extremely important in a large diameter slurry pipe jacking operation. Control of lubrication and gaps between pipes and soil can prevent hazards such as surface settlement and increases in thrust. Also, to find voids around the pipes after the jacking process, in order to inject mortar for permanent stabilizing, an investigation around the pipes is necessary. To meet these aims, this paper is concerned with the utilization of known methods such as the GPR (Ground Penetrating Radar) system and borehole camera to maintain control of the over cutting area and lubricant distribution around the pipes during a site investigation. From this point of view, experiments were carried out during a tunnel construction using one of the largest cases of slurry pipe jacking in Fujisawa city, Japan. The advantages and disadvantages of each system were clarified during the tests.  相似文献   
7.
国道219线新-藏公路改建工程地质灾害评价   总被引:1,自引:0,他引:1  
国道219线新-藏区界至红土达坂路段全长109.55km。大部分路段穿越湖盆槽谷中央部位,部分线路沿湖盆边缘台地布设,海拔高度介于5000-5400m之间,地势平坦开阔,多年冻土发育,工程地质条件较差;现有公路路基高度低,几乎没有排水设施。冬季易产生路基冻胀和涎流冰危害,春、夏季因冻土融化,常引起路基沉陷和翻浆,严重危害公路运输安全甚至阻断交通。公路工程修建活动将极大地改变冻土环境,使天然状态下的水分循环发生改变,导致多年冻土退化,上限加深,进一步诱发冻胀、融沉、热融滑塌等冻土灾害,加剧风沙灾害、诱发公路边坡失稳破坏。在即将进行的公路改、扩建工程中,应采取保护冻土的设计原则,优选线路,加强侧向排水,合理设置取弃土场。  相似文献   
8.
In underground coal mining any increase in coal recovery rate is dependent on a decrease in pillar size. Backfilling is one way of reducing the required size of pillars and hence the volume of coal left underground. Therefore any comparisons made between a self-supported mine layout and backfill supported mine layout are based directly on pillar design. The most effective way to examine the effect of backfill on pillar support, and subsequently the rate of recovery, would be to incorporate the mechanisms of backfill support directly into the current design procedure for coal pillars. This paper presents a review of the mechanics of backfill support, a method of estimating the magnitude of that support based on earth pressure theory, and an example that incorporates backfill support into current coal pillar design.  相似文献   
9.
Co‐genetic debrite–turbidite beds occur in a variety of modern and ancient turbidite systems. Their basic character is distinctive. An ungraded muddy sandstone interval is encased within mud‐poor graded sandstone, siltstone and mudstone. The muddy sandstone interval preserves evidence of en masse deposition and is thus termed a debrite. The mud‐poor sandstone, siltstone and mudstone show features indicating progressive layer‐by‐layer deposition and are thus called a turbidite. Palaeocurrent indicators, ubiquitous stratigraphic association and the position of hemipelagic intervals demonstrate that debrite and enclosing turbidite originate in the same event. Detailed field observations are presented for co‐genetic debrite–turbidite beds in three widespread sequences of variable age: the Miocene Marnoso Arenacea Formation in the Italian Apennines; the Silurian Aberystwyth Grits in Wales; and Quaternary deposits of the Agadir Basin, offshore Morocco. Deposition of these sequences occurred in similar unchannellized basin‐plain settings. Co‐genetic debrite–turbidite beds were deposited from longitudinally segregated flow events, comprising both debris flow and forerunning turbidity current. It is most likely that the debris flow was generated by relatively shallow (few tens of centimetres) erosion of mud‐rich sea‐floor sediment. Changes in the settling behaviour of sand grains from a muddy fluid as flows decelerated may also have contributed to debrite deposition. The association with distal settings results from the ubiquitous presence of muddy deposits in such locations, which may be eroded and disaggregated to form a cohesive debris flow. Debrite intervals may be extensive (> 26 × 10 km in the Marnoso Arenacea Formation) and are not restricted to basin margins. Such long debris flow run‐out on low‐gradient sea floor (< 0·1°) may simply be due to low yield strength (? 50 Pa) of the debris–water mixture. This study emphasizes that multiple flow types, and transformations between flow types, can occur within the distal parts of submarine flow events.  相似文献   
10.
曾定帮  彭文祥 《岩土工程技术》2005,19(1):53-54,F003
介绍了东海大桥钻孔灌注桩基础的施工技术 ,对一些关键技术做了详细说明 ,还讨论了海上钻孔灌注桩施工成孔设备的选择及所用的淡水泥浆的配制  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号