首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   16篇
  免费   0篇
测绘学   10篇
地球物理   4篇
地质学   2篇
  2022年   3篇
  2018年   2篇
  2017年   1篇
  2015年   1篇
  2014年   1篇
  2013年   2篇
  2011年   1篇
  2010年   4篇
  2007年   1篇
排序方式: 共有16条查询结果,搜索用时 46 毫秒
1.
Multi-technique space geodetic analysis software has been developed which allows to combine data on the observation level. In addition to local tie information, site-wise common parameters, i.e., troposphere and clocks, can be estimated with this software. Thus, it will be discussed how common parameters have to be estimated and where biases/offsets need to be taken into account. To test such a novel concept, Global Positioning System (GPS) and Very Long Baseline Interferometry (VLBI) data from the CONT11 campaign are being utilized. Since the VLBI baselines of this campaign extend over several thousands of kilometers, GPS data are processed in precise-point positioning mode and satellite orbits and clocks are kept fixed to the IGS final products. From the obtained results, it can be shown that the combination of space geodetic data on the observation level leads to a consistent improvement of station position repeatability as well as nuisance parameters like troposphere estimates. Furthermore, estimation of common parameters (troposphere or clocks) at co-located sites helps to improve the solution further and derive an utmost physically consistent model of the concerned parameters.  相似文献   
2.
Interferometric synthetic aperture radar phase data include not only signals due to crustal movements, but also those associated with microwave propagation delay through the atmosphere. In particular, the effect of water vapor can generate apparent signals in the order of a few centimeters or more, and prevent us from detecting such geophysical signals as those due to secular crustal deformation. To examine if and to what extent numerical weather model (NWM) outputs are helpful to reduce the tropospheric delay signals at spatial scales of 5–50 km wavelengths, we compared three approaches of tropospheric signal reduction, using 54 interferograms in central Hokkaido, Japan. The first approach is the conventional topography-correlated delay correction that is based on the regional digital elevation model (DEM). The second approach is based on the Japan Meteorological Agency’s operational meso-scale analysis model (MSM) data, where we compute tropospheric delays and subtract them from the interferogram. However, the MSM data are available at predefined epochs and their spatial resolution is about 10 km; therefore, we need to interpolate both temporally and spatially to match with interferograms. Expecting to obtain a more physically plausible reduction of the tropospheric effects, we ran a 1-km mesh high-resolution numerical weather model WRF (Weather Research and Forecasting model) by ourselves, using the MSM data as the initial and boundary conditions. The third approach is similar to the second approach, except that we make use of the WRF-based tropospheric data. Results show that if the topography-correlated phases are significant, both the conventional DEM-based approach and the MSM-based approach reveal comparable performances. However, when the topography-correlated phases are insignificant, none of the approaches can efficiently reduce the tropospheric phases. Although it could reduce the tropospheric signals in a local area, in none of the case studies did the WRF model produce the “best” performance. Whereas the global atmospheric model outputs are shown to be effective in reducing long-wavelength tropospheric signals, we consider that further improvements are needed for the initial and boundary condition data for high-resolution NWM, so that the NWM-based approach will become more reliable even in the case of a non-stratified troposphere.  相似文献   
3.
Continuous, very long baseline interferometry (VLBI) campaigns over 2 weeks have been carried out repeatedly, i.e., CONT02 in October 2002, CONT05 in September 2005, CONT08 in August 2008, and CONT11 in September 2011, to demonstrate the highest accuracy the current VLBI was capable at that time. In this study, we have compared zenith total delays (ZTD) and troposphere gradients as consistently estimated from the observations of VLBI, Global Navigation Satellite Systems (GNSS), and Doppler Orbitography and Radiopositioning Integrated by Satellite (DORIS) at VLBI sites participating in the CONT campaigns. We analyzed the CONT campaigns using the state-of-the-art software following common processing strategies as closely as possible. In parallel, ZTD and gradients were derived from numerical weather models, i.e., from the global European Centre for Medium-Range Weather Forecasts (ECMWF) analysis fields, the High Resolution Limited Area Model (European sites), the Japan Meteorological Agency-Operational Meso-Analysis Field (MANAL, over Japan), and the Cloud Resolving Storm Simulator (Tsukuba, Japan). Finally, zenith wet delays were estimated from the observations of water vapor radiometers (WVR) at sites where the WVR observables are available during the CONT sessions. The best ZTD agreement, interpreted as the smallest standard deviation, was found between GNSS and VLBI techniques to be about 5–6 mm at most of the co-located sites and CONT campaigns. We did not detect any significant improvement in the ZTD agreement between various techniques over time, except for DORIS and MANAL. On the other hand, the agreement and thus the accuracy of the troposphere parameters mainly depend on the amount of humidity in the atmosphere.  相似文献   
4.
This report summarizes the seismicity in Switzerland and surrounding regions in the years 2015 and 2016. In 2015, the Swiss Seismological Service detected and located 735 earthquakes in the region under consideration. With a total of 20 earthquakes of magnitude ML ≥ 2.5, the seismic activity of potentially felt events in 2015 was close to the average of 23 earthquakes over the previous 40 years. Seismic activity was above average in 2016 with 872 located earthquakes of which 31 events had ML ≥ 2.5. The strongest event in the analyzed period was the ML 4.1 Salgesch earthquake, which occurred northeast of Sierre (VS) in October 2016. The event was felt in large parts of Switzerland and had a maximum intensity of V. Derived focal mechanisms and relative hypocenter relocations of aftershocks image a SSE dipping reverse fault, which likely also hosted an ML 3.9 earthquake in 2003. Another remarkable earthquake sequence in the Valais occurred close to Sion with four felt events (ML 2.7–3.2) in 2015/16. We associate this sequence with a system of WNW-ESE striking fault segments north of the Rhône valley. Similarities with a sequence in 2011, which was located about 10 km to the NE, suggest the existence of an en-echelon system of basement faults accommodating dextral slip along the Rhône-Simplon line in this area. Another exceptional earthquake sequence occurred close to Singen (Germany) in November 2016. Relocated hypocenters and focal mechanisms image a SW dipping transtensional fault segment, which is likely associated with a branch of the Hegau-Bodensee Graben. On the western boundary of this graben, micro-earthquakes close to Schlattingen (TG) in 2015/16 are possibly related to a NE dipping branch of the Neuhausen Fault. Other cases of earthquakes felt by the public during 2015/16 include earthquakes in the region of Biel, Vallorcine, Solothurn, and Savognin.  相似文献   
5.
We perform extensive simulations in order to assess the accuracy with which the position of a radio transmitter on the surface of the Moon can be determined by geodetic VLBI. We study how the quality and quantity of geodetic VLBI observations influence these position estimates and investigate how observations of such near-field objects affect classical geodetic parameters like VLBI station coordinates and Earth rotation parameters. Our studies are based on today’s global geodetic VLBI schedules as well as on those designed for the next-generation geodetic VLBI system. We use Monte Carlo simulations including realistic stochastic models of troposphere, station clocks, and observational noise. Our results indicate that it is possible to position a radio transmitter on the Moon using today’s geodetic VLBI with a two-dimensional horizontal accuracy of better than one meter. Moreover, we show that the next-generation geodetic VLBI has the potential to improve the two-dimensional accuracy to better than 5 cm. Thus, our results lay the base for novel observing concepts to improve both lunar research and geodetic VLBI.  相似文献   
6.
Journal of Seismology - Site response is a critical consideration when assessing earthquake hazards. Site characterization is key to understanding site effects as influenced by seismic site...  相似文献   
7.
Numerical weather models offer the possibility to compute corrections for a variety of space geodetic applications, including remote sensing techniques like interferometric SAR. Due to the computational complexity, exact ray-tracing is avoided in many cases and mapping approaches are applied to transform vertically integrated delay corrections into slant direction. Such an approach works well as long as lateral atmospheric gradients are small enough to be neglected. But since such an approximation holds only for very rare cases it is investigated how horizontal gradients of different atmospheric constituents can evoke errors caused by the mapping strategy. Moreover, it is discussed how sudden changes of wet refractivity can easily lead to millimeter order biases when simplified methods are applied instead of ray-tracing. By an example, based on real InSAR data, the differences of the various troposphere correction schemes are evaluated and it is shown how the interpretation of the geophysical signals can be affected. In addition, it is studied to which extend troposphere noise can be reduced by applying the exact ray-tracing solution.  相似文献   
8.
One-baseline 1-h Very Long Baseline Interferometry (VLBI) Intensive sessions are carried out every day to determine Universal Time (UT1). Azimuthal asymmetry of tropospheric delays around the stations is usually ignored and not estimated because of the small number of observations. In this study we use external information about the asymmetry for the Intensive sessions between Tsukuba (Japan) and Wettzell (Germany), which are carried out on Saturdays and Sundays (1) from direct ray-tracing for each observation at Tsukuba and (2) in the form of linear horizontal north and east gradients every 6 h at both stations. The change of the UT1 estimates is at the 10 μs level with maximum differences of up to 50 μs, which is clearly above the formal uncertainties of the UT1 estimates (between 5 and 20 μs). Spectral analysis reveals that delays from direct ray-tracing for the station Tsukuba add significant power at short periods (1–2 weeks) w.r.t. the state-of-the-art approach, and comparisons with length-of-day (LOD) estimates from Global Positioning System (GPS) indicate that these ray-traced delays slightly improve the UT1 estimates from Intensive sessions.  相似文献   
9.
CONT08 was a 15 days campaign of continuous Very Long Baseline Interferometry (VLBI) sessions during the second half of August 2008 carried out by the International VLBI Service for Geodesy and Astrometry (IVS). In this study, VLBI estimates of troposphere zenith total delays (ZTD) and gradients during CONT08 were compared with those derived from observations with the Global Positioning System (GPS), Doppler Orbitography and Radiopositioning Integrated by Satellite (DORIS), and water vapor radiometers (WVR) co-located with the VLBI radio telescopes. Similar geophysical models were used for the analysis of the space geodetic data, whereas the parameterization for the least-squares adjustment of the space geodetic techniques was optimized for each technique. In addition to space geodetic techniques and WVR, ZTD and gradients from numerical weather models (NWM) were used from the European Centre for Medium-Range Weather Forecasts (ECMWF) (all sites), the Japan Meteorological Agency (JMA) and Cloud Resolving Storm Simulator (CReSS) (Tsukuba), and the High Resolution Limited Area Model (HIRLAM) (European sites). Biases, standard deviations, and correlation coefficients were computed between the troposphere estimates of the various techniques for all eleven CONT08 co-located sites. ZTD from space geodetic techniques generally agree at the sub-centimetre level during CONT08, and??as expected??the best agreement is found for intra-technique comparisons: between the Vienna VLBI Software and the combined IVS solutions as well as between the Center for Orbit Determination (CODE) solution and an IGS PPP time series; both intra-technique comparisons are with standard deviations of about 3?C6?mm. The best inter space geodetic technique agreement of ZTD during CONT08 is found between the combined IVS and the IGS solutions with a mean standard deviation of about 6?mm over all sites, whereas the agreement with numerical weather models is between 6 and 20?mm. The standard deviations are generally larger at low latitude sites because of higher humidity, and the latter is also the reason why the standard deviations are larger at northern hemisphere stations during CONT08 in comparison to CONT02 which was observed in October 2002. The assessment of the troposphere gradients from the different techniques is not as clear because of different time intervals, different estimation properties, or different observables. However, the best inter-technique agreement is found between the IVS combined gradients and the GPS solutions with standard deviations between 0.2 and 0.7?mm.  相似文献   
10.
We present earth rotation results from the ultra-rapid operations during the continuous VLBI campaigns CONT11 and CONT14. The baseline Onsala–Tsukuba, i.e., using two out of the 13 and 17 stations contributing to CONT11 and CONT14, respectively, was used to derive UT1-UTC in ultra-rapid mode during the ongoing campaigns. The latency between a new observation and a new UT1-UTC result was less than 10 min for more than 95% of the observations. The accuracy of the derived ultra-rapid UT1-UTC results is approximately a factor of three worse than results from optimized one-baseline sessions and/or complete analysis of large VLBI networks. This is, however, due to that the one-baseline picked from the CONT campaigns is not optimized for earth rotation determination. Our results prove that the 24/7 operation mode planned for VGOS, the next-generation VLBI system, is possible already today. However, further improvements in data connectivity of stations and correlators as well in the automated analysis are necessary to realize the ambitious VGOS plans.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号