首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
海洋学   1篇
  2010年   1篇
排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
Surface elevation is the basic data for geo-science. It is difficult to retrieve tidal-flats’ elevation from single Remote Sensing (RS) image because of the complicated sediment dynamical environment and huge spatial difference in tidal-flats’ moisture content. A Digital Elevation Model (DEM) construction method for inconstant inter-tidal zone based on high tempo-resolution MODIS data set in a short period is proposed in a case study on the Dongsha Sandbank of the Jiangsu Radial Tidal Sand-ridges. In the present study, a batch-preprocessing method based on image partition to handle massive MODIS 1B images is developed and applied to 8163 scenes of MODIS images. The dataset of short-period and multi-temporal MODIS images for inter-tidal flats’ DEM inversion is selected and the usability of MODIS dataset is analyzed. Shorelines of the Dongsha Sandbank are extracted by use of batch supervised classification. In accord with tidal-level forecasted by the Chenjiawu Tidal Gauge Station at the overpass moment of each RS image, DEMs of inter-tidal flats in January and summer(Jul, Aug and Sept), 2003 were built under ArcGIS9.2. Studies show that: (1) The dataset of short-duration and multi-phase MODIS images can be used to retrieve the historical DEM of tidal-flats at changeful tidal flats. (2) Analysis on usability of MODIS images from Aqua and Terra indicates that there are more usable and high-quality MODIS images in spring, autumn and winter, but less in summer. Therefore, the period for building inter-tidal flats’ DEM is suggested to be one month in spring, autumn and winter and three months in summer.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号