首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   53篇
  免费   14篇
  国内免费   3篇
地球物理   28篇
地质学   13篇
海洋学   20篇
综合类   4篇
自然地理   5篇
  2024年   1篇
  2023年   1篇
  2022年   3篇
  2021年   4篇
  2020年   1篇
  2019年   4篇
  2018年   5篇
  2017年   7篇
  2016年   2篇
  2015年   4篇
  2014年   6篇
  2013年   5篇
  2012年   4篇
  2011年   5篇
  2010年   3篇
  2009年   3篇
  2008年   6篇
  2007年   1篇
  2006年   2篇
  2004年   1篇
  2003年   1篇
  1995年   1篇
排序方式: 共有70条查询结果,搜索用时 31 毫秒
11.
This paper describes delta development processes with particular reference to Cimanuk Delta in Indonesia. Cimanuk river delta, the most rapidly growing river delta in Indonesia, is located on the northern coast of Java Island. The delta is subject to ocean waves of less than 1 m height due to its position in the semi‐enclosed Java Sea in the Indonesian archipelago. The study has been carried out using a hydrodynamic model that accounts for sediment movement through the rivers and estuaries. As an advanced approach to management of river deltas, a numerical model, namely MIKE‐21, is used as a tool in the management of Cimanuk river delta. From calibration and verification of hydrodynamic model, it was found that the best value of bed roughness was 0·1 m. For the sediment‐transport model, the calibration parameters were adjusted to obtain the most satisfactory results of suspended sediment concentration and volume of deposition. By comparing the computed and observed data in the calibration, the best values of critical bed shear stress for deposition, critical bed shear stress for erosion and erosion coefficient were 0·05 N m?2, 0·15 N m?2, and 0·00001 kg m?2 s?1, respectively. The calibrated model was then used to analyse sensitivity of model parameters and to simulate delta development during the periods 1945–1963 and 1981–1997. It was found that the sensitive model parameters were bed shear stresses for deposition and erosion, while the important model inputs were river suspended sediment concentration, sediment characteristics and hydrodynamic. The model result showed reasonable agreement with the observed data. As evidenced by field data, the mathematical model proves that the Cimanuk river delta is a river‐dominated delta because of its protrusion pattern and very high sediment loads from the Cimanuk river. It was concluded that 86% of sediment load from the Cimanuk river was deposited in the Cimanuk delta. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   
12.
A spatially distributed, physically based, hydrologic modeling system (MIKE SHE) was applied to quantify intra‐ and inter‐annual discharge from the snow and glacierized Zackenberg River drainage basin (512 km2; 20% glacier cover) in northeast Greenland. Evolution of snow accumulation, distribution by wind‐blown snow, blowing‐snow sublimation, and snow and ice surface melt were simulated by a spatially distributed, physically based, snow‐evolution modelling system (SnowModel) and used as input to MIKE SHE. Discharge simulations were performed for three periods 1997–2001 (calibration period), 2001–2005 (validation period), and 2071–2100 (scenario period). The combination of SnowModel and MIKE SHE shows promising results; the timing and magnitude of simulated discharge were generally in accordance with observations (R2 = 0·58); however, discrepancies between simulated and observed discharge hydrographs do occur (maximum daily difference up to 44·6 m3 s?1 and up to 9% difference between observed and simulated cumulative discharge). The model does not perform well when a sudden outburst of glacial dammed water occurs, like the 2005 extreme flood event. The modelling study showed that soil processes related to yearly change in active layer depth and glacial processes (such as changes in yearly glacier area, seasonal changes in the internal glacier drainage system, and the sudden release of glacial bulk water storage) need to be determined, for example, from field studies and incorporated in the models before basin runoff can be quantified more precisely. The SnowModel and MIKE SHE model only include first‐order effects of climate change. For the period 2071–2100, future IPCC A2 and B2 climate scenarios based on the HIRHAM regional climate model and HadCM3 atmosphere–ocean general circulation model simulations indicated a mean annual Zackenberg runoff about 1·5 orders of magnitude greater (around 650 mmWE year?1) than from today 1997–2005 (around 430 mmWE year?1), mainly based on changes in negative glacier net mass balance. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   
13.
《国际泥沙研究》2021,36(6):756-769
Coastal lagoons are particularly vulnerable to climate change, in particular, Sea Level Rise (SLR) due to their shallowness. Lake Burullus provides a variety of socio-economic services as the second largest coastal lagoon in Egypt. Recently, it has experienced significant ecological deterioration. Thus, its ecosystem is fragile in the face of anthropogenic induced changes. The main objective of the current study is to investigate the climate change impacts on characteristics of Lake Burullus. A depth averaged hydro-ecological modeling system, MIKE21, was applied to develop an eco - hydrodynamic model for the lake. The developed model was calibrated and verified for two successive years: July 2011–June 2012 and July 2012–June 2013. The model simulations exhibited good agreement with the measurements during the calibration and verification processes. Six different Regional Climate Models (RCMs) were compared, using six different statistical metrics, to determine the most accurate one for the study area. The required meteorological input, including surface air temperature, precipitation, and evaporation were derived from the selected RCM. The meteorological input was extracted for two different years in the 21 st century considering one Representative Concentration Pathways (RCPs) scenario, based on the Intergovernmental Panel on Climate Change (IPCC) 5th Report. Regional SLR projections for the Mediterranean Sea for the selected RCP scenario and the two studied years were obtained. These future climate change estimates were used to modify the validated model of the lake. A sensitivity analysis was applied to assess effect of future climatic conditions and SLR, separately. The results revealed that the lake water depths will increase and it will be warmer and more saline. Significant spatial variability of the studied parameters under climate change forcing is expected. Consequently, climate change is going to restrict the lake's ability to preserve the present-day species. An urgent management plan involving adaptation works, should be implemented to reduce such potential species losses in Egyptian lagoons.  相似文献   
14.
黄粤  陈曦  马勇刚 《中国沙漠》2010,30(5):1234-1238
自然环境恶劣、站点稀少、观测困难是干旱区水文系统研究面临的基本问题。特殊的自然地理条件给水文过程带来了极大的复杂性和不确定性,也阻碍了干旱区水文过程和机理研究的发展。选取塔里木河源区开都河流域为研究区,采用分布式水文模型MIKE SHE模拟大尺度资料稀缺地区水文过程,将流域内气象、水文站点数据与遥感数据相结合,利用气象、土壤类型、土地利用和地表覆盖、数字高程(DEM)和降雨等资料,模拟流域水文过程;在出山口径流数据的基础上对模型进行率定和验证;分析了模型中的不确定性的来源,探讨模型优化方法。结果表明,MIKE SHE模型能在水文、气象站点稀少,土壤及水文地质数据缺乏的条件下,模拟开都河流域的日径流过程,但精度仍有待提高;通过分析识别出了隐含于模型结构、输入及参数等3个方面的8种不确定性来源。  相似文献   
15.
杭州湾外围海域岛礁众多,波浪传播机制复杂。为了了解该海域的波浪分布特征,采用MIKE 21 SW模块建立了杭州湾海域波浪数值模型,利用实测波浪资料对模型进行了验证,结果表明该模型适用于模拟杭州湾海域的波浪传播。利用1970—2002年嵊山海洋站实测极值波浪资料推算50年一遇波浪要素,将其作为模型边界条件,对杭州湾海域50年一遇的设计波浪进行了模拟,并对该海域的波浪传播特征进行了分析。结果表明,杭州湾内波高较之外海明显减小,外围众多岛礁起到了很好的遮挡保护作用。  相似文献   
16.
17.
大凌河流域MIKE BASIN水资源模型   总被引:5,自引:1,他引:4  
吴俊秀  郭清 《水文》2011,31(1):70-75
Mike Basin模型是一个集总式综合河网模拟系统,与GIS系统全面链接,具备清楚的数据与模型结构,支持水资源综合管理的参与式对话和矛盾解决方案。它由两个模型单元组成:水文模型(NAM)和水资源分配模型(MIKE BASIN)。它是认识和分析流域水资源状况,进行流域水资源综合管理规划十分重要的工具。本文从模型数据的需求、分析与应用以及参数的率定,较详细地阐述了大凌河流域MIKE BASIN水资源模型的建立过程,为其他用户进行模型的建立提供了借鉴。  相似文献   
18.
A modelling framework for the quick estimate of flood inundation and the resultant damages is developed in this paper. The model, called the flood economic impact analysis system (FEIAS), can be applied to a river reach of any hydrogeological river basin. For the development of the integrated modelling framework, three models were employed: (1) a modelling scheme based on the Hydrological Simulation Program FORTRAN model that was developed for any geomorphological river basin, (2) a river flow/floodplain model, and (3) a flood loss estimation model. The first sub‐model of the flood economic impact analysis system simulates the hydrological processes for extended periods of time, and its output is used as input to a second component, the river/floodplain model. The hydraulic model MIKE 11 (quasi‐2D) is the river/floodplain model employed in this study. The simulated flood parameters from the hydraulic model MIKE 11 (quasi‐2D) are passed, at the end of each time step, to a third component, the flood loss model for the estimation of flood damage. In the present work, emphasis was given to the seasonal variation of Manning's coefficient (n), which is an important parameter for the determination of the flood inundation in hydraulic modelling. High values of Manning's coefficient for a channel indicate high flow resistance. The riparian vegetation can have a large impact on channel resistance. The modelling framework developed in this paper was used to investigate the role of riparian vegetation in reducing flood damage. Moreover, it was used to investigate the influence of cutting riparian vegetation scenarios on the flow characteristics. The proposed framework was applied to the downstream part of the Koiliaris River basin in Crete, Greece, and was tested and validated with historical data. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   
19.
鄱阳湖是长江水系中的两大通江湖泊之一,在调节长江水位、涵养水源、改善当地气候和维护周围地区生态平衡等方面都起着巨大的作用。鄱阳湖水利枢纽的修建可能导致湖泊水文情势和水动力的变化。本文基于MIKE 21构建鄱阳湖二维水动力模型,选取1954年和1998年特大洪水年以及1991年长江倒灌年作为运行期的典型年,选取1995年作为施工期典型年,按照规划中的鄱阳湖水利枢纽工程施工及运行调度方案,计算水利枢纽修建前后鄱阳湖水位和流量的变化,定量分析枢纽工程对长江干流、鄱阳湖湖区及尾闾附近洪水动力的影响。结果表明:不同典型年鄱阳湖水利枢纽对长江干流、湖区及尾闾的洪水动力影响相似,其中洪水期、倒灌期及施工期一期对长江防洪、湖区及尾闾附近的影响较小,施工期二期湖区水位壅高幅度最高达0.237 m,对鄱阳湖湖区及尾闾附近防洪有一定影响;枢纽工程对星子、都昌、康山等湖区水文站水位影响幅度较为接近,且越靠近尾闾,影响越小。整体而言,鄱阳湖水利枢纽的修建会导致洪水年鄱阳湖湖区水位壅高,倒灌期湖区水位降低,湖区流速降低,但变化幅度均较小,故枢纽工程施工期和运行期对汛期行洪影响不大。  相似文献   
20.
山东省威海市滨海新城作为威海市的新行政中心,是威海市着力打造的宜居、宜业、宜游、宜学的现代化卓越新城。本文采用MIKE21FM平面二维数值模型研究威海市滨海新城北部海域的潮流场运动,并以分层流速流向实测资料对模型进行验证。结果表明,研究区潮流场流速和流向数值模拟结果与实测资料变化基本一致。  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号