Integrity monitoring for ambiguity resolution is of significance for utilizing the high-precision carrier phase differential positioning for safety–critical navigational applications. The integer bootstrap estimator can provide an analytical probability density function, which enables the precise evaluation of the integrity risk for ambiguity validation. In order to monitor the effect of unknown ambiguity bias on the integer bootstrap estimator, the position-domain integrity risk of the integer bootstrapped baseline is evaluated under the complete failure modes by using the worst-case protection principle. Furthermore, a partial ambiguity resolution method is developed in order to satisfy the predefined integrity risk requirement. Static and kinematic experiments are carried out to test the proposed method by comparing with the traditional ratio test method and the protection level-based method. The static experimental result has shown that the proposed method can achieve a significant global availability improvement by 51% at most. The kinematic result reveals that the proposed method obtains the best balance between the positioning accuracy and the continuity performance. 相似文献
GPS Solutions - Tropical cyclones are a serious natural disaster concern in Australia due to El Niño and La Niña phenomena. However, little attention has been paid to the ionospheric... 相似文献
Acta Geochimica - The Sandaowanzi gold deposit is an extremely Au-rich deposit in the Northern Great Hinggan Range in recent years. Zircon U–Pb geochronology, Hf isotope analysis, and the... 相似文献
Challenged by rapidly changing climate in combination with an increase in anthropogenic pressures, karst groundwater resources in the Old Town of Lijiang (OTLJ), SW China, are diminishing. Higher frequency and longer duration of dried-up periods have been observed at the Heilongtan Park (HP) Springs in recent years. Thus, there is an urgent need for an artificial recharge scheme, aimed at replenishing groundwater in the aquifer and increasing the outflow of the springs to ensure effective water resources management. Evaluation of the scheme feasibility, prior to its implementation, is important. In this study, tracer tests were conducted between the recharge area and receiving springs in order to gain insight into the transport mechanisms of karst groundwater and the structural characteristics of the aquifer. Multiple underground flow paths, exhibiting high conductivity between the recharge area and HP Springs, were revealed by the interpretation of tracer breakthrough curves. Three springs considered as the leakages of the scheme were identified. Moreover, the outflow of springs at HP and OTLJ were predicted to be increased by the artificially recharged water after 9.2 and 12.5 days, respectively. Quantitative analysis of tracer recoveries demonstrates that the springs to be recharged and the springs considered as leakages, respectively, share 45 and 55% of the increased outflow. The feasibility of the scheme has been confirmed by the tracer tests. This report provides references for the evaluation of artificial groundwater recharge and protection strategies, particularly in large and poorly investigated karst spring fields.