首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   34篇
  免费   1篇
测绘学   1篇
大气科学   1篇
地球物理   16篇
地质学   15篇
天文学   1篇
综合类   1篇
  2022年   1篇
  2020年   1篇
  2018年   4篇
  2017年   3篇
  2016年   2篇
  2015年   2篇
  2014年   2篇
  2013年   6篇
  2012年   2篇
  2011年   1篇
  2010年   2篇
  2009年   3篇
  2008年   4篇
  2003年   1篇
  2002年   1篇
排序方式: 共有35条查询结果,搜索用时 625 毫秒
21.
In this study, the environmental radioactivity measurements for Tokat and Sivas provinces in the northeast of Turkey were performed. Using gamma ray spectrometry, the activity concentrations of natural radionuclides in soil and travertine samples (232Th, 226Ra, and 40K) were determined. The annual effective dose equivalent, the absorbed doses rate in air, the radium equivalent, and the external hazard index were obtained from these activities. The activity concentrations vary from 9.09 to 17.04 Bq kg?1 for 232Th, from 36.53 to 76.95 Bq kg?1 for 226Ra, and from 216.56 to 576.59 Bq kg?1 for 40K in soil samples. The activity concentrations in travertines vary from 15.99 to 21.01 Bq kg?1 for 232Th, from 19.89 to 67.71 Bq kg?1 for 226Ra, and from 179.89 to 314.43 Bq kg?1 for 40K. The average dose rate in air for soil and travertine samples was 43.41 and 41.05 nGy h?1 respectively. The obtained results are presented and compared with other studies, and the results of this study are lower than the international recommended value (55 nGy h?1) given by UNSCEAR ( 2000). The results show that the region has a background radiation level within the natural limits.  相似文献   
22.
23.
Olive oil mill wastewater (OMW) is environmentally hazardous not only because it contains high recalcitrant and toxic compounds, but also due to its high organic load and turbidity. In this study, oxidation of OMW by microwave (MW)‐activated persulfate is investigated. Box–Behnken design is applied to investigate the effects of operating conditions on operating cost, organic matter, and color removal. Multi response optimization is performed according to minimum operating cost, maximum organic matter and color removal efficiencies. At optimum conditions (persulfate anion dose of 266 g L?1, oxidation duration of 23.58 min, MW power of 567 W, and initial pH 2), chemical oxygen demand (COD) removal of 63.38%, color removal of 94.85%, and operating cost of 0.0633 Euro/g total organic carbon (TOC) removal are found. The biochemical oxygen demand (BOD5)/COD ratio is increased from 0.144 to 0.285. Results of Pareto analysis show individual effect of MW power is 92.81% for TOC removal, 15.52% for color removal, 68.99% for operating cost, respectively. According to the results, it is not recommended to use this process as an ultimate treatment unit due to the high amount of oxidizing agent consumed. Instead, it is recommended to be used as a pre‐ or post‐treatment step.  相似文献   
24.
ABSTRACT

The index flood method of the regional L-moments approach is adapted to annual maximum rainfall (AMR) series of successively increasing durations from 5 minutes to 24 hours. In Turkey, there are 14 such AMRs having standard durations of 5, 10, 15, 30, 60, 120, 180, 240, 300, 360, 480, 720, 1080 and 1440 min. The parameters of the probability distributions found suitable for these AMR series in a homogeneous region need to be adjusted so that their quantile functions will not cross each other over the entire range of probabilities. This adjustment is done so as to make (1) the derivative of the quantile function with respect to the Gumbel reduced variate of a longer-duration AMR be greater than or equal to that of the shorter-duration AMR, and (2) the quantile of a longer-duration AMR be greater than that of the shorter-duration AMR, both to be satisfied for any specific probability. Accordingly, the parameters of a probability distribution fitted to some AMR series must either increase or decrease or be constant with respect to increasing rainstorm duration; and the parameters of different distributions fitted to two sequential AMR series must be interrelated. The index flood method by the L-moments approach modified in such manner for successive-duration AMR series is applied to the Inland Anatolia region of Turkey using data recorded at 31 rain-gauging stations with recording lengths from 31 to 66 years.
EDITOR Z.W. Kundzewicz; ASSOCIATE EDITOR A. Viglione  相似文献   
25.
This study was performed to propose a suitable treatment for waste foundry sand (WFS) before persistent disposal. It was observed that solidification/stabilization (S/S), which is the common pre‐treatment method because of its comparatively easy and inexpensive applicability, can treat WFS including dissolved organic carbon (DOC) above hazardous landfilling limits. Regular sand was partially replaced with WFS with a ratio of 0–90 wt% in order to prepare three different kinds of mortar samples, where Portland limestone cement (PLC) alone, calcium lime (CL) alone, and PLC together with CL were contained as binders. Leaching behaviors of all S/S products were analyzed according to the TS EN 12457‐4 leaching test. The treatment efficiency was assessed to reduce the DOC content to the levels under the European landfill acceptance criteria. Furthermore, heavy metals (Ni, Zn, Cr), fluoride (F?), total dissolved solids leachability, and total organic carbon content were analyzed in order to investigate the pre‐treatment ability and to determine whether S/S products can be disposed of in a landfill site with municipal wastes or in a separate landfill site. The results showed that S/S of WFS is an efficient pre‐treatment technique before its disposal in a landfill and provides economical advantages compared to hazardous waste landfilling.  相似文献   
26.
Abstract

A procedure to identify sets of operational rules for gated spillways for optimal flood routing management of artificial reservoirs is proposed. The flood retention storage of a dam having a gated flood spillway is divided into 15 sub-storages whose surface elevations are identified as critical levels. The most suitable operation set for the downstream conditions and for the dam can be chosen from many derived operation sets. The spillway gates are operated in an optimum way for any floods from very small magnitudes to the probable maximum flood (PMF), without having to forecast the actual magnitude of the incoming flood hydrograph. Decision floods are formed by dividing the PMF into 15 sub-hydrographs by 5 and 10% increments in the ranges 5–50% and 50–100% of the PMF, respectively. Many potential spillway gate openings from closed to fully open are chosen initially. As a result of a series of routing simulations of 15 decision floods, a set of 15 gate openings is determined such that all floods from very small magnitudes to the PMF may be routed without overtopping the dam crest. Next, a few more 15-stage operation rules are determined such that the gate openings of the initial stages are decreased as their critical levels are increased stepwise, with the objective of attenuating smaller floods more effectively and releasing higher outflows for larger floods close to and including the PMF. The developed model is applied to the Catalan and Aslantas dams in Turkey, both of which serve for flood mitigation as well as hydropower generation.

Citation Haktanir, T., Citakoglu, H., and Acanal, N., 2013. Fifteen-stage operation of gated spillways for flood routing management through artificial reservoirs. Hydrological Sciences Journal, 58 (5), 1013–1031.

Editor Z.W. Kundzewicz; Associate editor A. Montanari  相似文献   
27.
Natech risk and management: an assessment of the state of the art   总被引:1,自引:0,他引:1  
The present state-of-the-art for natech risk and management is discussed. Examples of recent natechs include catastrophic oil spills associated with Hurricane Katrina and hazardous chemical releases in Europe during the heavy floods of 2002. Natechs create difficult challenges for emergency responders due to the geographical extent of the natural disaster, the likelihood of simultaneous releases, emergency personnel being preoccupied with response to the natural disaster, mitigation measures failing due to the effects of the natural disaster, and others. Recovery from natechs may be much more difficult than for “normal” chemical accidents, as the economic and social conditions of the industrial facility and the surrounding community may have been drastically altered by the natural disaster. Potential safeguards against natechs include adoption of stricter design criteria, chemical process safeguards, community land use planning, disaster mitigation and response planning, and sustainable industrial processes, but these safeguards are only sporadically applied. Ultimately, the public must engage in a comprehensive discussion of acceptable risks for natechs.
Ana Maria CruzEmail:
  相似文献   
28.
Little Andaman, the fourth largest island in the Andaman group of islands of India, was severely affected by the December 26, 2004, Indian Ocean tsunami generated by massive earthquake of moment magnitude 9.3 Mw which devastated the Andaman and Nicobar group of islands causing heavy damage to life and property. Due to hostile terrain conditions not much information was available on the extent of inundation and run-up along the island except for Hut Bay region. In order to study the vulnerability of the island to tsunami hazard, the inundation in the island due to the 2004 tsunami was studied using TUNAMI N2 numerical model and ENVISAT ASAR datasets. The extent of inundation derived from the SAR imagery was compared using the RTK-GPS field survey points collected in the Hut Bay regions immediately after the 2004 tsunami. The extent of inundation obtained from SAR images for the entire island was compared with inundation obtained from model. It was observed that the inundation obtained from the model matched well with inundation extent from SAR imagery for nearshore regions, while for low-lying areas and creeks large deviations were observed. In the absence of field datasets, the inundation derived from SAR imagery would be effective in providing ground data to validate the numerical models which can then be run for multiple scenarios for disaster mitigation and planning operation in areas that have hostile terrain conditions.  相似文献   
29.
The paper describes the earthquake performance assessment of two historical buildings located in Istanbul exposed to a Mw = 7+ earthquake expected to hit the city and proposes solutions for their structural rehabilitation and/or strengthening. Both buildings are unreinforced clay brick masonry (URM) structures built in 1869 and 1885, respectively. The first building is a rectangular-shaped structure rising on four floors. The second one is L-shaped with one basement and three normal floors above ground. They survived the 1894, Ms = 7.0 Istanbul Earthquake, during which widespread damage to URM buildings took place in the city. Earthquake ground motion to be used in performance assessment and retrofit design is determined through probabilistic and deterministic seismic hazard assessment. Strength characteristics of the brick walls are assessed on the basis of Schmidt hammer test results and information reported in the literature. Dynamic properties of the buildings (fundamental vibration periods) are measured via ambient vibration tests. The buildings are modelled and analyzed as three-dimensional assembly of finite elements. Following the preliminary assessment based on the equivalent earthquake loads method, the dynamic analysis procedure of FEMA 356 (Pre-standard and commentary for the seismic rehabilitation of buildings, American Society of Civil Engineers, Reston, 2000) and ASCE/SEI 41-06 (Seismic rehabilitation of existing buildings, American Society of Civil Engineers, Reston, 2007) is followed to obtain dynamic structural response of the buildings and to evaluate their earthquake performance. In order to improve earthquake resistance of the buildings, reinforced cement jacketing of the main load carrying walls and application of fiber reinforced polymer bands to the secondary walls are proposed.  相似文献   
30.
This study presents an extended shoreline detection approach from pansharpened images of Turkish RASAT satellite which covers red, green and blue bands of the optical spectrum with 15 m ground resolution and panchromatic band with 7.5 m spatial resolution. The Lake Ercek of Turkey has been selected as the study area, which is a tectonic lake and home to a variety of water birds. The satellite images of the lake taken in 2013 and 2014 were considered for analysis. The proposed shoreline extraction system consists of a sequence of image processing steps in which simple linear clustering (SLIC) and particle swarm optimization (PSO) are the main components. SLIC was used to create superpixels that form basis for object-based image analysis while PSO was employed for classifying objects into corresponding classes. The resulting images still contained unwanted artefacts; therefore, a post-processing step was performed to improve the accuracy of segmentation by applying thresholding, morphological processing, and manual editing for noise removal. The proposed framework was applied on two temporal RASAT images to test the variations of defined parameter settings. The success of the proposed system was to obtain shorelines with satisfying accuracy without using NIR band. Finally, the extracted shorelines were vectorised and compared with manually digitized shorelines from pansharpened satellite images for accuracy assessment.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号