排序方式: 共有31条查询结果,搜索用时 0 毫秒
1.
破坏性地震应急预案管理子系统的开发构想 总被引:1,自引:0,他引:1
本文阐述了以地震应急指挥流程为框架并基于WEB的管理系统的实现方案 ,对管理系统的使用和维护提出了相关建议。 相似文献
2.
3.
4.
5.
This paper reports that vibrational spectroscopic analysis on hydrogen-bonding between acetone and water comprises both experimental Raman spectra and ab initio calculations on structures of various acetone/water complexes with changing water concentrations. The optimised geometries and wavenumbers of the neat acetone molecule and its complexes are calculated by using ab initio method at the MP2 level with 6-311+G(d,p) basis set. Changes in wavenumber position and linewidth (fullwidth at half maximum) have been explained for neat as well as binary mixtures with different mole fractions of the reference system, acetone, in terms of intermolecular hydrogen bonding. The combination of experimental Raman data with ab initio calculation leads to a better knowledge of the concentration dependent changes in the spectral features in terms of hydrogen bonding. 相似文献
6.
不同型号仪器水位记震能力对比分析 总被引:6,自引:0,他引:6
通过对地震时不同型号仪器及不同采样率获取的水位观测曲线进行对比分析,结果显示:目前我国数字化水位观测的两种主要观测仪器ADP系统与LN-3(A)在记震能力上的差别主要是由采样率不同引起的,与仪器性能及水井的深度关系不大.由于水震波的持续时间一般只有几分钟,因此只有加大采样率,才能记录到波型更为完整的水震波和更为丰富的水震波震例.分析认为,数字化水位观测必须最终向实时记录的方向发展,才能更真实准确地反映地球内部应力的瞬时变化的真实信息,不至因采样率不足而使短周期信息遗漏,同时也更有机会捕捉到前驱波及区域应力场的变化. 相似文献
7.
地震现场的通讯环境极为复杂,公共的网络接入模式在地震时往往很难保证现场与后方指挥中心之间的实时文件传输和视频通信。本文根据地震带来的破坏程度的不同,针对地震现场的具体通信情况,以及地震应急工作中现场网络通信的需求,提出多项确保地震现场局域网络和后方指挥中心之间通信畅通的解决方案。 相似文献
8.
9.
PHSJ-4型PH计是我局第一台高精确度的PH计,应用到实际观测过程中,遇到许多影响观测质量的具体问题。本文针对PHSJ-4型PH计使用过程中遇到的乱码、测值突跳、电极老化快、合理分辨率的确定、温度干扰因素的控制等问题展开分析,做了大量的条件实验,结合该仪器的工作原理以及PH值所遵循的化学原理,指出要提高和保障观测质量,观测时必须做到如下几点:调节观测参数时用指腹轻按,出现局部黑屏、乱码现象可采用关机后重新开机解决;电极一定要浸泡在KCL保护液中,观测完毕清洗电极后一定要用滤纸把残余的蒸馏水擦干后再授泡在KCL保护液中以免降低电极保护液的保护功效,延长电极的寿命;水样要达到室温时才能进行观测;合理分辨率应设置在0.01PH档。 相似文献
10.