首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 78 毫秒
1.
《水文科学杂志》2013,58(1):66-82
Abstract

An adaptive model for on-line stage forecasting is proposed for river reaches where significant lateral inflow contributions occur. The model is based on the Muskingum method and requires the estimation of four parameters if the downstream rating curve is unknown; otherwise only two parameters have to be determined. As the choice of the forecast lead time is linked to wave travel time along the reach, to increase the lead time, a schematization of two connected river reaches is also investigated. The variability of lateral inflow is accounted for through an on-line adaptive procedure. Calibration and validation of the model were carried out by applying it to different flood events observed in two equipped river reaches of the upper-middle Tiber basin in central Italy, characterized by a significant contributing drainage area. Even if the rating curve is unknown at the downstream section, the forecast stage hydrographs were found in good agreement with those observed. Errors in peak stage and time to peak along with the persistence coefficient values show that the model has potential as a practical tool for on-line flood risk management.  相似文献   

2.
This study proposes a statistically based procedure to quantify the confidence interval (CI) to be associated to the stages forecast by a simple model called STAge FOrecasting Model‐Rating Curve Model (STAFOM‐RCM). This model can be used for single river reaches characterized by different intermediate drainage areas and mean wave travel times when real‐time stage records, cross section surveys and rating curves are available at both ends. The model requires, at each time of forecast, an estimate of the lateral contribution qfor between the two sections delimiting the reach. The CI of the stage is provided by analyzing the statistical properties of model output in terms of lateral flow, and it is derived from the CI of the lateral contribution qfor which, in turn, is set up by associating to each qfor the qopt which allows STAFOM‐RCM to reproduce the exact observed stage. From an operative point of view, the qfor values are ranked in order of magnitude and subdivided in classes where the qopt values can be represented through normal distributions of proper mean and variance from which an interval of selected confidence level for qfor is computed and transferred to the stage. Three river reaches of the Tiber river, in central Italy, are used as case study. A sensitivity analysis is also performed in order to identify the minimum calibration set of flood events. The CIs obtained are consistent with the level of confidence selected and have practical utility. An interesting aspect is that different CI widths can be produced for the same forecast stage since they depend on the estimate of qfor made at the time of forecast. Overall, the proposed procedure for CI estimate is simple and can be conveniently adapted for other forecasting models provided that they have physically based parameters which need to be updated during the forecast. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

3.
Rainfall threshold (RT) method is one of the evolving flood forecasting approaches. When the cumulative rainfall depth for a given initial soil moisture condition intersects the threshold rainfall curve, the peak discharge is expected to be equal or greater than the threshold discharge for flooding at the target site. Besides the total rainfall depth, spatial and temporal distribution of rainfall impacts the flood peak discharge and the time to peak. To revisit a previous study conducted by the authors, in which spatially independent rainfall pattern was assumed, the spatial distribution of rainfall was simulated following a Monte Carlo approach. The structure of the spatial dependence among sub‐watersheds' rainfalls was taken into account under three different scenarios, namely independent, bivariate copula (2copula) and multivariate Gaussian copula (MGC). For each set of generated random dimensionless rainfalls, the probabilistic RT curves were derived for dry moisture condition. Results were evaluated with both historical and simulated events. For the simulated events, threshold curves were assessed by means of categorical statistics, such as hit rate, false rate and critical success index (CSI). Results revealed that the best performance based on the CSI criterion corresponded to 50% curve in 2copula and MGC scenarios as well as 90% curve in the independent scenario. The recognition of 50% curve in 2copula and MGC scenarios is in agreement with our expectations that the mean probable curve should have the best performance. Moreover, the proposed inclusion of spatially dependent rainfall scenario improved the performance of RT curves by about 25% in comparison with the presumed spatially uniform rainfall scenario. Copyright © 2011 John Wiley & Sons, Ltd.  相似文献   

4.
L. Brocca  F. Melone  T. Moramarco 《水文研究》2011,25(18):2801-2813
Nowadays, in the scientific literature many rainfall‐runoff (RR) models are available ranging from simpler ones, with a limited number of parameters, to highly complex ones, with many parameters. Therefore, the selection of the best structure and parameterisation for a model is not straightforward as it is dependent on a number of factors: climatic conditions, catchment characteristics, temporal and spatial resolution, model objectives, etc. In this study, the structure of a continuous semi‐distributed RR model, named MISDc (‘Modello Idrologico Semi‐Distribuito in continuo’) developed for flood simulation in the Upper Tiber River (central Italy) is presented. Most notably, the methodology employed to detect the more relevant processes involved in the modelling of high floods, and hence, to build the model structure and its parameters, is developed. For this purpose, an intense activity of monitoring soil moisture and runoff in experimental catchments was carried out allowing to derive a parsimonious and reliable continuous RR model operating at an hourly (or smaller) time scale. Specifically, in order to determine the catchment hydrological response, the important role of the antecedent wetness conditions is emphasized. The application of MISDc both for design flood estimation and for flood forecasting is reported here demonstrating its reliability and also its computational efficiency, another important factor in hydrological practice. As far as the flood forecasting applications are concerned, only the accuracy of the model in reproducing discharge hydrographs by assuming rainfall correctly known throughout the event is investigated indepth. In particular, the MISDc has been implemented in the framework of Civil Protection activities for the Upper Tiber River basin. Copyright © 2011 John Wiley & Sons, Ltd.  相似文献   

5.
在分析现有洪水概率预报评价指标的基础上,建立了洪水概率预报的"精度-可靠度"联合评价指标体系"精度"指标用于评价倾向值预报的准确性,包括确定性系数、相对误差等指标;"可靠度"指标用于评价区间预报的合理性,包括覆盖率、区间离散度等指标其中,在"可靠度"评价指标中,提出了一个新的评价指标,即覆盖率判定系数,用以评价多个区间预报结果的整体合理性以淮河王家坝区间流域为例进行应用研究,结果表明:"精度-可靠度"联合评价指标体系可以对洪水概率预报结果的合理性做出更全面的评价.  相似文献   

6.
常露  刘开磊  姚成  李致家 《湖泊科学》2013,25(3):422-427
随着社会经济的快速发展,洪水灾害造成的损失日益严重.洪水预报作为一项重要的防洪非工程措施,对防洪、抗洪工作起着至关重要的作用.淮河洪水危害的严重性和洪水演进过程的复杂性使得淮河洪水预报系统的研究长期以来受到高度重视.本文以王家坝至小柳巷区间流域为例,以河道洪水演算为主线,采用新安江三水源模型进行子流域降雨径流预报,概化具有行蓄洪区的干流河道,进行支流与干流、行蓄洪区与干流的洪水汇流耦合计算,采用实时更新的基于多元回归的方法确定水位流量关系,并以上游站点降雨径流预报模型提供的流量作为上边界条件、以下游站点的水位流量关系作为下边界条件,结合行蓄洪调度模型,建立具有行蓄洪区的河道洪水预报系统,再与基于K-最近邻(KNN)的非参数实时校正模型耦合,建立淮河中游河道洪水预报系统.采用多年资料模拟取得了较好的预报效果,并以2003和2007年大洪水为例进行检验,模拟结果精度较高,也证明了所建预报系统的合理性和适用性.  相似文献   

7.
This paper presented a new classified real-time flood forecasting framework by integrating a fuzzy clustering model and neural network with a conceptual hydrological model. A fuzzy clustering model was used to classify historical floods in terms of flood peak and runoff depth, and the conceptual hydrological model was calibrated for each class of floods. A back-propagation (BP) neural network was trained by using real-time rainfall data and outputs from the fuzzy clustering model. BP neural network provided a rapid on-line classification for real-time flood events. Based on the on-line classification, an appropriate parameter set of hydrological model was automatically chosen to produce real-time flood forecasting. Different parameter sets was continuously used in the flood forecasting process because of the changes of real-time rainfall data and on-line classification results. The proposed methodology was applied to a large catchment in Liaoning province, China. Results show that the classified framework provided a more accurate prediction than the traditional non-classified method. Furthermore, the effects of different index weights in fuzzy clustering were also discussed.  相似文献   

8.
Two models, one linear and one non‐linear, were employed for the prediction of flow discharge hydrographs at sites receiving significant lateral inflow. The linear model is based on a rating curve and permits a quick estimation of flow at a downstream site. The non‐linear model is based on a multilayer feed‐forward back propagation (FFBP) artificial neural network (ANN) and uses flow‐stage data measured at the upstream and downstream stations. ANN predicted the real‐time storm hydrographs satisfactorily and better than did the linear model. The results of sensitivity analysis indicated that when the lateral inflow contribution to the channel reach was insignificant, ANN, using only the flow‐stage data at the upstream station, satisfactorily predicted the hydrograph at the downstream station. The prediction error of ANN increases exponentially with the difference between the peak discharge used in training and that used in testing. ANN was also employed for flood forecasting and was compared with the modified Muskingum model (MMM). For a 4‐h lead time, MMM forecasts the floods reliably but could not be applied to reaches for lead times greater than the wave travel time. Although ANN and MMM had comparable performances for an 8‐h lead time, ANN is capable of forecasting floods with lead times longer than the wave travel time. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

9.
Abstract

Flood frequency analysis (FFA) is essential for water resources management. Long flow records improve the precision of estimated quantiles; however, in some cases, sample size in one location is not sufficient to achieve a reliable estimate of the statistical parameters and thus, regional FFA is commonly used to decrease the uncertainty in the prediction. In this paper, the bias of several commonly used parameter estimators, including L-moment, probability weighted moment and maximum likelihood estimation, applied to the general extreme value (GEV) distribution is evaluated using a Monte Carlo simulation. Two bias compensation approaches: compensation based on the shape parameter, and compensation using three GEV parameters, are proposed based on the analysis and the models are then applied to streamflow records in southern Alberta. Compensation efficiency varies among estimators and between compensation approaches. The results overall suggest that compensation of the bias due to the estimator and short sample size would significantly improve the accuracy of the quantile estimation. In addition, at-site FFA is able to provide reliable estimation based on short data, when accounting for the bias in the estimator appropriately.
Editor D. Koutsoyiannis; Associate editor Sheng Yue  相似文献   

10.
As part II of a sequence of two papers, previously developed L-moments by Hosking (1990), and the LH-moments by Wang (1997) are further investigated. The LH-moments (L to L4) are used to develop the regional parameters of the generalized extreme value distribution, generalized Pareto (GPA) distribution and the generalized logistic (GLO) distributions. These respective probability distribution functions (PDFs) are evaluated in terms of their performances. Flood peaks by the corresponding PDFs are compared with those generated by Monte Carlo simulation of randomized data, considering the respective LH-moments. The influence of the LH-moments on estimated PDFs are studied by evaluating the relative bias (RBIAS) in quantile estimation due to variability of the k parameter. Karkhe watershed located in western Iran was used as a case study area. Part I of this study identified the study area as regions A and B. The minimum calculated relative root mean square error (RRMSE) and RBIAS between simulated flood peaks and flood peaks by the corresponding PDFs were used in PDF selection, considering the respective LH-moments. The boxplots of the RRMSE tests identified the L3 level of the GPA distribution as the suitable PDF for sample sizes 20 and 80; for region A. Similar results were found for the RBIAS test. As for region B, the boxplots of the RRMSE tests indicated similar results for the three PDFs. However, the boxplots of the RBIAS tests identified the L4 level of the GLO most suitable for sample sizes 20 and 80. Relative efficiencies of the LH-moments were investigated, measured as RRMSE ratios of L-moments over the respective LH-moments. For the most parts the findings of this part of the study were similar to those of part I.  相似文献   

11.
The models of physiographic inundation and flood routing for channel network were used in this study to analyse the influence of the Tainan Scientific Base Industrial Park (TSBIP) and Feng-Hua detention ponds on the inundated potential, inundated volume, flood damage, and flood stage of peak flow along the Yen-Shui creek in 2-day flood for the 2-, 10- and 50-year return periods, respectively. The computed results show that the TSBIP detention ponds are able to reduce the inundated area and flood damage. However, the decrease in inundated area is not obvious for the 50-year return-period flood. Construction of the Feng-Hua detention pond resulted in a significant decrease in the flood stage along the Yen-Shui creek in the downstream reach. Moreover, the decrease in peak flow and lag of time-to-peak become increasingly evident in the downstream direction for the 2- and 10-year return-period events. For the 50-year return period, the lag of time-to-peak is not apparent, but the decrease in peak flow is still noticeable. In respect to the performance of detention ponds, the slopes of hydrographs in the rising and recession segments are smoother than those without detention ponds. Meanwhile, the shapes of peak become flatter if the detention ponds are installed. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

12.
Similarity and differences between linear flood routing modelling (LFRM) and flood frequency analysis (FFA) techniques are presented. The moment matching used in LFRM to approximate the impulse response function (IRF) was applied in FFA to derive the asymptotic bias caused by the false distribution assumption. Proceeding in this way, other estimation methods were used as approximation methods in FFA to derive the asymptotic bias. Using simulation experiments, the above investigation was extended to evaluate the sampling bias. As a feedback, the maximum likelihood method (MLM) can be used for approximating linear channel response (LCR) by the IRFs of conceptual models. Impulse responses of the convective diffusion and kinematic diffusion models were applied and developed as FFA models. Based on kinematic diffusion LFRM, the equivalence of estimation problems of discrete‐continuous distribution and single‐censored sample are shown both for the method of moments (MOM) and the MLM. Hence, the applicability of MOM is extended for the case of censored samples. Owing to the complexity and non‐linearity of hydrological systems and resulting processes, the use of simple models is often questionable. The rationale of simple models is discussed. The problems of model choice and overparameterization are common in mathematical modelling and FF modelling. Some results for the use of simple models in the stationary FFA are presented. The problems of model discrimination are then discussed. Finally, a conjunction of linear stochastic processes and LFRM is presented. The influence of river courses on stochastic properties of the runoff process is shown by combining Gaussian input with the LCR of the simplified Saint Venant model. It is shown that, from the classification of the ways of their development, both LFRM and FFA can benefit. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

13.
Much of the nonlinearity and uncertainty regarding the flood process is because hydrologic data required for estimation are often tremendously difficult to obtain. This study employed a back‐propagation network (BPN) as the main structure in flood forecasting to learn and to demonstrate the sophisticated nonlinear mapping relationship. However, a deterministic BPN model implies high uncertainty and poor consistency for verification work even when the learning performance is satisfactory for flood forecasting. Therefore, a novel procedure was proposed in this investigation which integrates linear transfer function (LTF) and self‐organizing map (SOM) to efficiently determine the intervals of weights and biases of a flood forecasting neural network to avoid the above problems. A SOM network with classification ability was applied to the solutions and parameters of the BPN model in the learning stage, to classify the network parameter rules and to obtain the winning parameters. The outcomes from the previous stage were then used as the ranges of the parameters in the recall stage. Finally, a case study was carried out in Wu‐Shi basin to demonstrate the effectiveness of the proposal. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

14.
Many civil infrastructures are located near the confluence of two streams, where they may be subject to inundation by high flows from either stream or both. These infrastructures, such as highway bridges, are designed to meet specified performance objectives for floods of a specified return period (e.g. the 100 year flood). Because the flooding of structures on one stream can be affected by high flows on the other stream, it is important to know the relationship between the coincident exceedence probabilities on the confluent stream pair in many hydrological engineering practices. Currently, the National Flood Frequency Program (NFF), which was developed by the US Geological Survey (USGS) and based on regional analysis, is probably the most popular model for ungauged site flood estimation and could be employed to estimate flood probabilities at the confluence points. The need for improved infrastructure design at such sites has motivated a renewed interest in the development of more rigorous joint probability distributions of the coincident flows. To accomplish this, a practical procedure is needed to determine the crucial bivariate distributions of design flows at stream confluences. In the past, the copula method provided a way to construct multivariate distribution functions. This paper aims to develop the Copula‐based Flood Frequency (COFF) method at the confluence points with any type of marginal distributions via the use of Archimedean copulas and dependent parameters. The practical implementation was assessed and tested against the standard NFF approach by a case study in Iowa's Des Moines River. Monte Carlo simulations proved the success of the generalized copula‐based joint distribution algorithm. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

15.
There are two basic approaches for estimating flood quantiles: a parametric and a nonparametric method. In this study, the comparisons of parametric and nonparametric models for annual maximum flood data of Goan gauging station in Korea were performed based on Monte Carlo simulation. In order to consider uncertainties that can arise from model and data errors, kernel density estimation for fitting the sampling distributions was chosen to determine safety factors (SFs) that depend on the probability model used to fit the real data. The relative biases of Sheater and Jones plug-in (SJ) are the smallest in most cases among seven bandwidth selectors applied. The relative root mean square errors (RRMSEs) of the Gumbel (GUM) are smaller than those of any other models regardless of parent models considered. When the Weibull-2 is assumed as a parent model, the RRMSEs of kernel density estimation are relatively small, while those of kernel density estimation are much bigger than those of parametric methods for other parent models. However, the RRMSEs of kernel density estimation within interpolation range are much smaller than those for extrapolation range in comparison with those of parametric methods. Among the applied distributions, the GUM model has the smallest SFs for all parent models, and the general extreme value model has the largest values for all parent models considered.  相似文献   

16.
Two lumped conceptual hydrological models, namely tank and NAM and a neural network model are applied to flood forecasting in two river basins in Thailand, the Wichianburi on the Pasak River and the Tha Wang Pha on the Nan River using the flood forecasting procedure developed in this study. The tank and NAM models were calibrated and verified and found to give similar results. The results were found to improve significantly by coupling stochastic and deterministic models (tank and NAM) for updating forecast output. The neural network (NN) model was compared with the tank and NAM models. The NN model does not require knowledge of catchment characteristics and internal hydrological processes. The training process or calibration is relatively simple and less time consuming compared with the extensive calibration effort required by the tank and NAM models. The NN model gives good forecasts based on available rainfall, evaporation and runoff data. The black‐box nature of the NN model and the need for selecting parameters based on trial and error or rule‐of‐thumb, however, characterizes its inherent weakness. The performance of the three models was evaluated statistically. Copyright © 2000 John Wiley & Sons, Ltd.  相似文献   

17.
Prediction intervals (PIs) are commonly used to quantify the accuracy and precision of a forecast. However, traditional ways to construct PIs typically require strong assumptions about data distribution and involve a large computational burden. Here, we improve upon the recent proposed Lower Upper Bound Estimation method and extend it to a multi‐objective framework. The proposed methods are demonstrated using a real‐world flood forecasting case study for the upper Yangtze River Watershed. Results indicate that the proposed methods are able to efficiently construct appropriate PIs, while outperforming other methods including the widely used Generalized Likelihood Uncertainty Estimation approach. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

18.
The process of aquifer recharge by flood events in an arid region was investigated as applied to the Hazeva Formation (the Karkom graben, the Wadi Paran watershed, Israel). The hydrological model was established as a complex system, with due regard for groundwater and transmission losses of surface runoff. It was based on a previously outlined hydrogeological model of the Karkom graben and a model of transmission losses in arid watercourses under conditions of data deficiency. Proceeding from calculation of groundwater balances, the contribution of surface runoff as a decisive balance component was confirmed. The main characteristics of aquifer regimes, such as changes in storage volume and groundwater level, as well as lateral flow, were all found to be dependent upon the net extraction rate, i.e. pumpage discounting replenishment by flood events. Analysis and physical interpretation of model parameters enabled assessment of the influence of groundwater extraction on aquifer recharge. This became apparent as increasing absorption capacity and recharge availability of the aquifer as a result of the groundwater abstraction. Copyright © 2002 John Wiley & Sons, Ltd.  相似文献   

19.
修建在河流支流入汇口处的水利工程,同时受干、支流洪水共同作用,其防洪水位不但与洪水组合特性有关,还与洪水、水利工程行洪的耦合关系有关.已有采用设计洪水重现期对应的特征洪水组合,或者直接采用经验洪水组合进行调洪计算得到防洪设计水位的方法无法有效反映洪水与水利工程的相互作用.本文结合防洪标准的本质,利用Copula-蒙特卡罗模拟方法对修建在支流入汇口处的水利工程的防洪设计水位进行计算,并以珠江流域西江支流郁江广西桂平航运枢纽水闸为例展开研究.结果表明:Copula-蒙特卡罗模拟方法可以有效考虑干、支流洪水组合特性及其与水利工程行洪的耦合关系,以其计算得到的防洪设计水位唯一且可保证达到防洪标准的要求,可有效克服利用洪水重现期确定防洪设计水位存在的不确定性;在干、支流洪水共同作用下,以设计洪水重现期的不同特征组合计算得到的防洪设计水位相差非常大,且与达到防洪标准要求的防洪设计水位相比完全偏离了合理的误差范围,不宜以设计洪水重现期确定防洪设计水位;利用经验洪水组合计算难以合理反映不同工程的洪水及工程特性.研究成果可为修建在支流入汇口处受干、支流洪水共同影响的水利工程防洪设计提供更合理的理论依据和...  相似文献   

20.
An increasing impervious area is quickly extending over the Wu‐Tu watershed due to the endless demands of the people. Generally, impervious paving is a major result of urbanization and more recently has had the potential to produce more enormous flood disasters than those of the past. In this study, 40 available rainfall–runoff events were chosen to calibrate the applicable parameters of the models and to determine the relationships between the impervious surfaces and the calibrated parameters. Model inputs came from the outcomes of the block kriging method and the non‐linear programming method. In the optimal process, the shuffled complex evolution method and three criteria were applied to compare the observed and simulated hydrographs. The tendencies of the variations of the parameters with their corresponding imperviousness were established through regression analysis. Ten cases were used to examine the established equations of the parameters and impervious covers. Finally, the design flood routines of various return periods were furnished through use of approaches containing a design storm, block kriging, the SCS model, and a rainfall‐runoff model with established functional relationships. These simulated flood hydrographs were used to compare and understand the past, present, and future hydrological conditions of the watershed studied. In the research results, the time to peak of flood hydrographs for various storms was diminished approximately from 11 h to 6 h in different decrements, whereas peak flow increased respectively from 127 m3 s?1 to 629 m3 s?1 for different storm intensities. In addition, this study provides a design diagram for the peak flow ratio to help engineers and designers to construct hydraulic structures efficiently and prevent possible damage to human life and property. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号