首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
金沙江下游4个梯级水电站总装机容量相当于两座三峡水库,是“西电东送”中部地区的源头工程,工程效益发挥对经济社会发展意义重大。2012年以来,向家坝、溪洛渡、乌东德和白鹤滩电站等陆续蓄水运行,层层拦截金沙江的泥沙,2013—2020年向家坝出库年输沙量均值下降至152万t,减幅超过99%。大量泥沙淤积在梯级水库内,同时向家坝以下河道发生长距离冲刷。本文以自金沙江下游工程筹建以来的观测资料为基础,针对梯级水库的泥沙淤积和坝下游河道冲刷规律开展研究,结果表明:金沙江下游四个梯级电站自建成运行至2020年底,累计淤积泥沙约5.98亿m3,其中溪洛渡库区淤积量占比达92.5%,2013-2020年溪洛渡和向家坝水库排沙比分别为2.64%和22.2%,其水库泥沙主要淤积在常年回水区的干流河道内,以死库容内淤积为主,侵占有效库容的比例小于1.3%。金沙江下游库区干流河道的峡谷特征明显,淤积多表现为主河槽的平铺式淤高。溪洛渡和向家坝库区淤积的泥沙沿程分选特征明显,越靠近坝前,中数粒径减小、细颗粒泥沙沙量百分数增加,极细颗粒泥沙会在库区一定范围内大量沉积。向家坝下游河床普遍冲刷,但...  相似文献   

2.
Abstract

Sediment transport capacity is a key concept in determining rates of detachment and deposition in process-based erosion models, yet limited studies have been conducted on steep slopes. We investigated the effects of sediment size on transport capacity of overland flow in a flume. Unit flow discharge ranged from 0.66 to 5.26?×?10-3 m2 s-1, and slope gradient varied from 8.7 to 42.3%. Five sediment size classes (median diameter, d 50, of 0.10, 0.22, 0.41, 0.69 and 1.16 mm) were used. Sediment size was inversely related to transport capacity. The ratios of average transport capacity of the finest class to those of the 0.22, 0.41, 0.69 and 1.16 mm classes were 1.09, 1.30, 1.55 and 1.92, respectively. Sediment transport capacity increased as a power function of flow discharge and slope gradient (R2?=?0.98), shear stress (R2?=?0.95), stream power (R2?=?0.94), or unit stream power (R2?=?0.76). Transport capacity generally decreased as a power function of sediment size (exponent?=??0.35). Shear stress and stream power predicted transport capacity better than unit stream power on steep slopes when transport capacity was <7 kg m-1 s-1. Sediment transport capacity increased linearly with mean flow velocity. Critical or threshold velocity increased as a power function of sediment size (R2?=?0.93). Further studies with fine soil particles are needed to quantify the effects of sediment size on transport capacity of overland flow on steep slopes.

Citation Zhang, G.-H., Wang, L.-L., Tang, K.-M., Luo, R.-T. & Zhang, X.C. (2011) Effects of sediment size on transport capacity of overland flow on steep slopes. Hydrol. Sci. J. 56(7), 1289–1299.  相似文献   

3.
Vito Ferro 《水文研究》1998,12(12):1895-1910
An equation for evaluating the sediment transport capacity of overland flow is a necessary part of a physically based soil erosion model describing sediment detachment and transport as distributed processes. At first, for the hydraulic conditions of small-scale and large-scale roughness, the sediment transport capacity relationship used in the WEPP model is calibrated by Yalin and Govers' equation. The analysis shows that the transport coefficient Kt depends on the Shields parameter, Y, according to a semi-logarithmic (Yalin) or a linear (Govers) equation. The reliability of the semi-logarithmic equation is verified by Smart's, and Aziz and Scott's experimental data. Then the Low's formula, whose applicability is also proved by Smart's, and Aziz and Scott's data, is transformed as a stream power equation in which a stream power coefficient, KSP, depending on Shields parameter, slope, sediment and water-specific weight, appears. A relationship between transport capacity and effective stream power is also proposed. Finally, the influence of rainfall on sediment transport capacity and the prediction of critical shear stress corresponding to overland flow are examined. © 1998 John Wiley & Sons, Ltd.  相似文献   

4.
2018年金沙江上游白格滑坡造成了近百年来最为严重的干流堵江事件,堰塞湖的形成和溃决给下游金沙江干流河道的水沙条件及梯级水电站运行造成影响.本文依据堰塞湖附近临时观测和金沙江干流河道控制性水文站的相关资料,研究堰塞体泄流对下游河道水沙输移的影响,同时结合梯级水库调度情况,计算了梯级水库的拦沙量.结果表明,堰塞湖溃决在金沙江中游形成了超历史的水沙过程,金沙江中游梯级电站开展应急调度后,堰塞湖溃决造成的特大洪水被削减为一般洪水.金沙江中游梯级梨园、阿海和金安桥电站累积拦截泥沙约1400万t,龙开口、鲁地拉和观音岩电站共计拦截泥沙约43万t,滑坡体产生的泥沙仍有约74%滞留在堰塞体附近.若滑坡体泥沙全部输移至金沙江中游梯级水库内,梨园电站的有效库容极有可能不满足水库所需调节库容的要求.  相似文献   

5.
Casey Lee  Guy Foster 《水文研究》2013,27(10):1426-1439
In‐stream sensors are increasingly deployed as part of ambient water quality‐monitoring networks. Temporally dense data from these networks can be used to better understand the transport of constituents through streams, lakes or reservoirs. Data from existing, continuously recording in‐stream flow and water quality monitoring stations were coupled with the two‐dimensional hydrodynamic CE‐QUAL‐W2 model to assess the potential of altered reservoir outflow management to reduce sediment trapping in John Redmond Reservoir, located in east‐central Kansas. Monitoring stations upstream and downstream from the reservoir were used to estimate 5.6 million metric tons of sediment transported to John Redmond Reservoir from 2007 through 2010, 88% of which was trapped within the reservoir. The two‐dimensional model was used to estimate the residence time of 55 equal‐volume releases from the reservoir; sediment trapping for these releases varied from 48% to 97%. Smaller trapping efficiencies were observed when the reservoir was maintained near the normal operating capacity (relative to higher flood pool levels) and when average residence times were relatively short. An idealized, alternative outflow management scenario was constructed, which minimized reservoir elevations and the length of time water was in the reservoir, while continuing to meet downstream flood control end points identified in the reservoir water control manual. The alternative scenario is projected to reduce sediment trapping in the reservoir by approximately 3%, preventing approximately 45 000 metric tons of sediment from being deposited within the reservoir annually. This article presents an approach to quantify the potential of reservoir management using existing in‐stream data; actual management decisions need to consider the effects on other reservoir benefits, such as downstream flood control and aquatic life. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

6.
中国的水库泥沙淤积问题   总被引:18,自引:2,他引:16  
由于我国有许多河流是含沙最高、输沙量大的多泥沙河流,水库泥沙淤积问题异常严重.主要表现在:淤积数量大,淤积速率快.据统计,截止到1981年底全国水库总淤积量达115×10~8m~3.占统计水库总库容的14.2%.年平均库容损失率达2.3%,高于世界各国.水库的严重淤积,不仅影响水库兴利效益的发挥,严重威胁水库的使用寿命,而且还造成一系列在进行水库规划时未曾充分估计到的环境问题.本文重点从河流水文泥沙特性、我国水库淤积问题的严重性、水库淤积引起的问题及水库防淤减淤措施等4个方面作一较全面的分析和探讨.  相似文献   

7.
Transporting capacity of overland flow on plane and on irregular beds   总被引:2,自引:0,他引:2  
In this paper the transporting capacity of thin flows, in the laminar and transitional flow regime, is studied. Experiments were carried out on irregular as well as on plane beds, using two totally different set-ups. The results of these two types of experiment were convergent. In both cases, sediment concentration was clearly related to grain shear velocity and unit stream power, expressed as the product of mean velocity and slope (Yang, 1973). The data agreed with those of Kramer and Meyer (1969). For a sandy bed, the unit stream power relationship was able to predict reasonably well the sediment concentrations measured on a mulched surface. For laminar and transitional flows, both the unit stream power and the shear velocity are related in the same way to slope and unit discharge. The unit stream power is a parameter which in particular can be very easily measured and might therefore become useful in obtaining a quick estimate of the transporting capacity of a thin flow. However, before a sediment transport equation for thin flows can be developed, more information is needed about the influence of the flow regime and grain size and density.  相似文献   

8.
Retrogressive erosion is a high-speed erosion process that usually occurs during the rapid release of stored water in reservoirs built on sandy rivers.Retrogressive erosion has been utilized in the practice of reservoir sedimentation control,but accurate prediction of the bed deformation process by numerical models has rarely been reported.The current study presents a one-dimensional morphodynamic model for simulating the evolution process of retrogressive erosion induced by high-velocity flows on steep slopes.The governing equations apply a Cartesian coordinate system with a vertically oriented z axis.The bed surface gradient and friction terms in the flow equations include correction factors to take account of the effects of high slope on flow movement.The net vertical sediment flux term in the sediment transport and bed deformation equations is calculated using an equation of erosion velocity.Particularly,this equation is based on an empirical relation between the sediment entrainment rate and the Shields parameter in contrast to the traditional sediment transport capacity,and the critical Shields parameter is modified by taking into account the permeability of the sediment layer and the stability of particles on a slope.The feedback of scoured sediment on the flow movement is considered by additional terms in the governing equations.Flume experiments of retrogressive erosion in literature were simulated to validate the model.The temporal variations of the longitudinal profiles of the free surface and channel bed and the sediment transport rate were well predicted.The algorithm calculating sediment entrainment in the proposed model also was validated for an experiment measuring entrainment rate from the literature.More importantly,it was found that the morphodynamic model using the sediment transport capacity equation predicts the trend of cumulative erosion contrary to the measurements,while results of the proposed model can follow a similar trend with the observed data in the retrogressive erosion process.  相似文献   

9.
Abstract

Sheet sediment transport was modelled by artificial neural networks (ANNs). A three-layer feed-forward artificial neural network structure was constructed and a back-propagation algorithm was used for the training of ANNs. Event-based, runoff-driven experimental sediment data were used for the training and testing of the ANNs. In training, data on slope and rainfall intensity were fed into the network as inputs and data on sediment discharge were used as target outputs. The performance of the ANNs was tested against that of the most commonly used physically-based models, whose transport capacity was based on one of the dominant variables—flow velocity (V), shear stress (SS), stream power (SP), and unit stream power (USP). The comparison results revealed that the ANNs performed as well as the physically-based models for simulating nonsteady-state sediment loads from different slopes. The performances of the ANNs and the physically-based models were also quantitatively investigated to estimate mean sediment discharges from experimental runs. The investigation results indicated that better estimations were obtained for V over mild and steep slopes, under low rainfall intensity; for USP over mild and steep slopes, under high rainfall intensity; for SP and SS over very steep slopes, under high rainfall intensity; and for ANNs over steep and very steep slopes, under very high rainfall intensities.  相似文献   

10.
Flume studies were conducted in order to evaluate the influence of slope, sediment size, discharge and inflow sediment concentration on sediment deposition by overland flow. Additionally, experiments were carried out to measure transport capacity of overland flow at low slopes, using a wide range of discharges. The experimental data show that the hydraulic conditions where net deposition occurs can be divided into two domains. The first domain is characterized by hydraulic conditions where transport capacity is not significant. In the second domain net deposition still occurs but transport capacity is significant. The size of the latter domain is dependent on the sediment size distribution, on the hydraulic roughness and on the inflow sediment concentration. The experiments clearly indicate the necessity of incorporating a threshold value in any deposition equation. These experiments demonstrate that shear stress is a valuable threshold for deposition modelling. Copyright © 1999 John Wiley & Sons, Ltd.  相似文献   

11.
The slope effects on sediment trapping process in vegetative filter strips (VFS) are usually neglected in current modelling practices for VFS operation, which hamper the VFS design and performance evaluation, especially on steep slopes. To fill the knowledge gap, 12 laboratory experiments of sediment trapping in VFS were conducted with three different inflow discharge (80, 100, and 120 ml s−1) and four slope angles (5,10, 15, and 20°). The experimental results show that, on steep slopes (10, 15, and 20°), a part of trapped sediment particles in VFS can be eroded again and then dragged to the downstream as bed load, whilst they do not move on gentle slope (5°). To describe the complex processes, a simple and effective modelling framework was developed for sloped VFS by coupling the slope infiltration, runoff, and modified sediment transport model. The model was tested against the experimental results and good agreements between the modelled and observed results were found in both runoff and sediment transport processes for all cases. On steep slopes, the sediment trapping performance of VFS decreases significantly because the erosion of deposited sediment particles can account for more than 60% of the sediment load in the outflow. The slope effect on sediment trapping efficiency of VFS varies greatly with soil, VFS, and slope properties. The model was compared with previous sediment transport equation and found that both methods can satisfactorily predict the sediment trapping of VFS on gentle slopes, but previous sediment transport equation is likely to overestimate the sediment trapping efficiency in VFS on steep slopes. This model is expected to provide a more realistic and accurate method for predicting runoff and sediment reduction in VFS on sloping surfaces.  相似文献   

12.
Large dam construction for irrigation, hydropower, water supply, and flood control in tropical to sub-tropical areas increased markedly after 1950. Many of the dams built during this period have filled with sediment and no longer perform to their original design specifications; in many cases, forecast dam life was greatly overestimated. This study investigates the useful life of Burdekin Falls Dam (BFD), northeastern Australia and compares the findings with other tropical reservoirs. Using two independent methods it is estimated that between 61 and 65 million m3 of sediment has been deposited in the reservoir over the 24 years of operation through 2011. This sediment volume equates to an average of 0.15% of capacity lost per year since construction was completed. If current sediment loads/climate regimes persist, reservoir capacity will be reduced by 50% after 345 years. However, the useful life of the BFD reduces to just 276 years when drawdown data are considered; these data show reservoir use would be affected once 40% of storage was filled with sediment, with a 60% drawdown return period of 1 in 15 years. When compared to similar large tropical to sub-tropical reservoirs, the BFD has a slightly longer reservoir useful life than dams in India and a much longer half-life than for both similar-sized and larger dams in China, Brazil, and Iran. Properties of the BFD that promote a longer useful life include a lower trap efficiency, relatively low annual sediment load delivered to the reservoir, limited sediment deposition behind the dam wall (and uniform distribution of deposited sediment), and the export of highly turbid annual floodwaters before settling and deposition of any remaining sediment within the reservoir.  相似文献   

13.
泥沙问题是三峡工程建设与运行中的关键技术问题之一,只有妥善处理好泥沙问题,才能保证三峡工程长期有效使用,维持水库功能的全面发挥。本文首先结合实测水文、河道地形观测资料,对三峡水库运行近20年来的泥沙淤积特性及水库排沙比进行了较为全面的分析研究,并与已有研究成果进行了对比;其次,围绕防洪、航运以及坝前段的泥沙淤积等方面,进一步分析了水库淤积产生的影响。结果表明:三峡水库蓄水以来,在不考虑区间来沙的情况下,三峡水库共淤积泥沙20.484亿t,近似年均淤积1.102亿t,水库排沙比为23.6%,水库年均淤积量为原论证预测值的33%。其中,库区干流段累计淤积泥沙17.835亿m3(变动回水区冲刷0.694亿m3;常年回水区淤积18.529亿m3),淤积在水库防洪库容内的泥沙为1.648亿m3(干、支流分别淤积1.517亿m3和0.131亿m3),占水库防洪库容的0.74%,“十一五”攻关阶段研究得出的多年平均淤积量及排沙比较实测值均偏大,变动回水区冲淤则出现反向的...  相似文献   

14.
Soil erosion is a major contributor to land degradation in the Loess Plateau in China. To clarify the sediment transport capacity of overland flow influenced by hydraulic parameters, such as shear stress, sand shear stress (hydraulic gradient partition method and hydraulic radius partition method), mean flow velocity, Froude number, stream power, and unit stream power, indoor experiments with eight-unit-width flow discharges from 0.0667 × 10−3 to 0.3333 × 10−3 m2·s−1, six slope gradients from 3.49 to 20.79%, and two kinds of sand soils (d50 = 0.17 and 0.53 mm) were systematically investigated. A nondimensional method was adopted in data processing. Results showed that there was a partition phenomenon of relation curves because of the different median grain diameters. The correlation between the nondimensional stream power and nondimensional sediment transport capacity was the highest, followed by the correlation between the nondimensional unit stream power and nondimensional sediment transport capacity. However, there was a poor correlation between the flow intensity indices of velocity category and nondimensional sediment transport capacity. Nondimensional stream power, nondimensional unit stream power, and nondimensional shear stress could predict sediment transport capacity well. Ignoring the partition phenomenon of the relation curves, stream power could be used to predict sediment transport capacity, with a coefficient of determination of .85. Furthermore, a general flow intensity index was obtained to predict sediment transport capacity of overland flow. Finally, an empirical formula for predicting sediment transport capacity with a coefficient of determination of .90 was established by multiple regression analyses based on the general flow intensity index. During the analysis between measured sediment transport capacities in present study and predicted values based on Zhang model, Mahmoodabadi model, and Wu model, it was found that these three models could not accurately predict sediment transport capacities of this study because different models are estimated on the basis of different experimental conditions.  相似文献   

15.
In this paper, a recently theoretically deduced rill flow resistance equation, based on a power‐velocity profile, is tested experimentally on plots of varying slopes in which mobile bed rills are incised. Initially, measurements of flow velocity, water depth, cross‐sectional area, wetted perimeter and bed slope conducted in 106 reaches of rills incised on an experimental plot having a slope of 14% were used to calibrate the flow resistance equation. Then, the relationship between the velocity profile parameter Γ, the channel slope, and the flow Froude number, which was calibrated using the 106 rill reach data, was tested using measurements carried out in plots having slopes of 22% and 9%. The measurements carried out in the latter slope conditions confirmed that (a) the Darcy–Weisbach friction factor can be accurately estimated using the proposed theoretical approach, and (b) the data were supportive of the slope independence hypothesis of rill velocity stated by Govers.  相似文献   

16.
Abstract

Analyses of data from reservoir surveys and sediment rating curves are compared to predict sediment yield in three large reservoir watershed areas in Turkey. Sediment yield data were derived from reservoir sedimentation rates and suspended sediment measurements at gauging stations. The survey data were analysed to provide the volume estimates of sediment, the time-averaged sediment deposition rates, the long-term average annual loss rates in the reservoir storage capacity, and the long-term sediment yield of the corresponding watershed areas. Four regression methods, including linear and nonlinear cases, were applied to rating curves obtained from gauging stations. Application of the efficiency test to a power function form of a rating curve with nonlinear regression yielded the highest efficiency values. Based on the analysis of the sediment rating curves, sediment load fluxes were calculated by using average daily discharge data at each gauging station. Comparison of these two sediment yield values for each reservoir showed that the sediment yields from the suspended sediment measurements, SYGS, are 0.99 to 3.54 times less than those obtained from the reservoir surveys, SYRS. The results from the reservoir surveys indicate that all three reservoirs investigated have lost significant storage capacity due to high sedimentation rates.  相似文献   

17.
Using hydraulic parameters is essential for describing soil detachment and developing physically based erosion prediction models. Many hydraulic parameters have been used, but the one that performs the best for describing soil detachment on steep slopes when the lateral expansion (widening) of rills is not limited has not been identified. An indoor concentrated flow scouring experiment was performed on steep loessial slopes to investigate soil detachment rates for different flow rates and slope gradients. The experiments were conducted on a slope‐adjustable plot (5 m length, 1 m width, 0.5 m depth). Sixteen combinations of 4 flow rates (10, 15, 20, and 25 L/min) and 4 slope gradients (17.6%, 26.8%, 36.4%, and 46.6%) were investigated. The individual and combined effects of slope gradient and flow hydraulic parameters on soil detachment rate were analysed. The results indicated that soil detachment rate increased with flow rate and slope gradient. Soil detachment rate varied linearly and exponentially with flow rate and slope gradient, respectively. Multivariate, nonlinear regression analysis indicated that flow depth exerted the greatest influence on the soil detachment rate, followed by unit discharge per unit width, slope gradient, and flow rate in this study. Shear stress and stream power could efficiently describe the soil detachment rate using a power equation. However, the unit stream power and unit energy of the water‐carrying section changed linearly with soil detachment rate. Stream power was an optimal hydraulic parameter for describing soil detachment. These findings improve our understanding of concentrated flow erosion on steep loessial slopes.  相似文献   

18.
A comprehensive understanding of the dynamics of erosion and sedimentation in reservoirs under different management conditions is required to anticipate sedimentation issues and implement effective sediment management strategies. This paper describes a unique approach combining fluvial geomorphology tools and morphodynamic modeling for analyzing the sediment dynamics of an elongated hydropower reservoir subjected to management operations: the Génissiat Reservoir on the Rhône River. Functional sub‐reaches representative of the reservoir morphodynamics were delineated by adapting natural river segmentation methods to elongated reservoirs. The segmentation revealed the link between the spatial and temporal reservoir changes and the variability of longitudinal flow conditions during reservoir management operations. An innovative modeling strategy, incorporating the reservoir segmentation into two sediment transport codes, was implemented to simulate the dynamics of erosion and sedimentation at the reach scale during historic events. One code used a bedload approach, based on the Exner equation with a transport capacity formula, and the other used a suspended load approach based on the advection–dispersion equation. This strategy provided a fair quantification of the dynamics of erosion and sedimentation at the reach scale during different management operations. This study showed that the reservoir morphodynamics is controlled by bedload transport in upper reaches, graded suspended load transport of sand in middle reaches and suspended load transport of fine sediments in lower reaches. Eventually, it allowed a better understanding of the impact of dam management on sediment dynamics. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

19.
Sediment yield is a complex function of many environmental factors including climate,hydrology,vegetation,basin topography,soil types,and land cover.We present a new semi-physical watershed sediment yield model for the estimation of suspended sediment in loess region.This model is composed by three modules in slope,gully,and stream phases.For slope sediment yield,a balance equation is established based on the concept of hydraulic erosion capacity and soil erosion resistance capacity.According to the statistical analysis of watershed characteristics,we use an exponential curve to approximately describe the spatial variability of watershed soil erosion resistance capacity.In gully phase,the relationship between gully sediment concentration and flow velocity is established based on the Bagnold'stream power function.In the stream phase,we assume a linear dependence of the sediment volume in the reach on the weighted sediment input and output.The proposed sediment yield model is operated in conjunction with a conceptual hydrologic model,and is tested over 16 regions including testing grounds,and small,medium and large watersheds in the loess plateau region in the mid-reach of Yellow River.Our results indicate that the model is reasonable in structure and is able to provide a good simulation of sediment generation and transportation processes at both flood event scale and inter-annual time scale.The proposed model is generally applicable to the watersheds with soil texture similar to that of the loess plateau region in the Yellow River basin in China.  相似文献   

20.
Changes in river regime after the construction of upstream reservoirs   总被引:1,自引:0,他引:1  
This article presents and analyses many years of investigations in China on the fluvial processes downstream of impounding and detention reservoirs. The study covers the change in hydrograph, the recovering of sediment concentration along the river course, the degradation of stream bed, the adjustment of longitudinal profile, the coarsening of bed material, the change in channel width, and the trend of channel pattern variation for alluvial streams downstream of impounding reservoirs. Without confluence of major tributaries, the degradation may extend to a great distance below the dam. In the process of reducing the sediment carrying capacity of the flow to match the diminished sediment supply, the coarsening of bed material is a factor of equal, if not greater, importance as compared with the flattening of channel gradient. In places where the flow has not been sufficiently cut down and the bank is erosive non-resistant, a receding of banklines may take place in concurrence with the deepening of the river bed. Below detention reservoirs, even if the total runoff and sediment supply remain essentially unchanged, the modification of the hydrograph is sufficient to enhance the deterioration of the downstream channel.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏