1.
The stability analysis is one of the chief problems at hydropower stations. The Tengzigou Hydropower Station is a significant project in Southwest China. The authors analyzed the engineering geological features and evaluated the stability of rock mass on left bank. For determining the parameters of rock mass stability on left bank, we adopted the method of numerical value calculation according to the theory of rigidity limited equilibrium, which will provide the theoretical evidences for this project.  相似文献   

2.
After water is impounded in a reservoir, rock mass in the hydro-fluctuation belt of the reservoir bank slope is subject to water saturationdehydration circulation (WSDC). To quantify the rate of change of rock mechanical properties, samples from the Longtan dam area were measured with uniaxial compression tests after different numbers (1, 5, 10, 15, and 20) of simulated WSDC cycles. Based on the curves derived from these tests, a modified Hoek- Brown failure criterion was proposed, in which a new parameter was introduced to model the cumulative damage to rocks after WSDC. A case of an engineering application was analyzed, and the results showed that the modified Hoek-Brown failure criterion is useful. Under similar WSDC-influenced engineering and geological conditions, rock mass strength parameters required for analysis and evaluation of rock slope stability can be estimated according to this modified Hoek-Brown failure criterion.  相似文献   

3.
The natural balance conditions will be disturbed and produce a series of problems when mineral deposit has mined. This paper has researched the engineering rock masses have been researched in this study, structural planes, the distribution characteristics of tectonic geological factors and the stability of engineering structures according to the theory and research methods of rock mechanics, it will provide the engineering geological evidence for mining area exploited, meanwhile pledge the safety production. Shanmen silver deposit is a large epithermal deposit,it is controlled by NE to NNE strike faults. The stability of rock mass is acted on the tectonic movement and hot metalliferous brine in long-term. Especially,strength of rock mass becomes softened, muddy and loosed under the action of water,so the lower stability of rock mass is,the easier it can take place for harm of disaster threatening production safe of mining. For this reason,it is very important that drawing up a plan to lower harm for mine and protect.  相似文献   

4.
夏日哈木镍钴矿为大型镍钴硫化物矿床,现拟建大型露天采场,边坡采用分台阶式高边坡,最高边坡高度超过600m。该工程具有开挖成本高,边坡一但失稳后果严重的特点。为此需要选择一个即节约经济成本又保障整体边坡稳定的最佳边坡角。本文采取Geostudio软件中的Slope模块极限平衡方法对拟建露天采场假设开挖边坡角的整体边坡稳定性进行分析,提出最佳设计边坡角。 本次边坡角优化的思路:首先根据场地工程地质条件和拟建边坡的高度等因素将拟建边坡划分为5个区,选择典型边坡工程地质剖面并进行工程地质岩体分段,然后通过岩石强度指标折减计算(本文采用费辛柯法、M.Georgi法和经验法)给各分段的岩体赋予凝聚力、内摩擦角等计算参数,采用极限平衡方法(Geostudio软件中的Slope模块法)对不同角度下对各分区边坡的破坏形式及安全系数进行计算,最后提出了各分区边坡的最佳设计边坡角。  相似文献   

5.
The natural balance conditions will be disturbed and produce a series of problems when mineral deposit has mined.This paper has researched the engineering rock masses have been researched in this study,structural planes,the distribution characteristics of tectonic geological factors and the stability of engineering structures according to the theory and research methods of rock mechanics,it will provide the engineering geological evidence for mining area exploited,meanwhile pledge the safety production.Shanmen silver deposit is a large epithermal deposit,it is controlled by NE to NNE strike faults.The stability of rock mass is acted on the tectonic movement and hot metalliferous brine in long-term.Especially,strength of rock mass becomes softened,muddy and loosed under the action of water,so the lower stability of rock mass is,the easier it can take place for harm of disaster threatening production safe of mining.For this reason,it is very important that drawing up a plan to lower harm for mine and protect.  相似文献   

6.
The excavated height of the left bank slope of the diversion power system intake in Jinchuan hydropower station is about 16o m. The stability and safety of the slope during construction and its operation/utilization become one of the most important geological engineering problems. At the same time, it is also crucial to select a safe and economic excavation gradient for the construction. We studied the problem of how to select a safe and economic slope ratio by analyzing the geological condition of the high slope, including the lithology, slope structure, structural surface and their combinations, rock weathering and unloading, hydrology, and the natural gradient. The study results showed that the use of an excavation gradient larger than the gradient observed during site investigation and the gradient recommended in standards and field practice manuals is feasible. Then, we used the finite element method and rigid limit equilibrium method to evaluate the stability of the excavation slope under natural, rainstorm and earthquake conditions. The calculated results showed that the excavated slope only has limited failure, but its stability is greatly satisfactory. The research findings can be useful in excavation and slope stabilization projects.  相似文献   

7.
三峡库区广泛分布侏罗系红砂岩,在水库运行期间红砂岩的渗流-应力耦合特性关乎库区内多数滑坡和岩质边坡的稳定性。借助岩石多场耦合三轴试验系统,对三峡库区侏罗系红砂岩开展了不同围压、不同渗透压下的三轴压缩试验,系统研究了红砂岩的三轴压缩力学特性和渗透率演化特征。研究结果表明:(1)红砂岩的峰前应力-应变曲线可分为孔隙压密阶段、弹性变形阶段、微裂隙稳定发展阶段和非稳定发展阶段。红砂岩的力学参数与渗透压的关系呈负相关,与围压呈正相关。(2)随着围压升高,红砂岩的破坏模式由张拉破坏过渡到剪切破坏。(3)不同渗透压下,渗透率曲线呈平稳发展→缓慢上升→快速上升3阶段演化规律;不同围压下,渗透率曲线先降低后升高。(4)从能量角度分析了渗透压和围压对岩石的作用,验证了渗流对岩石的劣化效应以及围压对裂纹发展的抑制作用。本试验对鲜有报道的侏罗系红砂岩的强度、变形和渗透特性做了系统的研究,对渗流-应力耦合课题有补充意义。其工况根据三峡库区边坡岩体的应力水平来确定,试验结果对分析库区边坡稳定性具有指导意义。  相似文献   

8.
When transparent soil technology is used to study the displacement of a slope, the internal deformation of the slope can be visualized. We studied the sliding mechanism of the soil-rock slope by using transparent soil technology and considering the influence of the rock mass Barton joint roughness coefficient, angle of the soil mass, angle of the rock mass and soil thickness factors on slope stability. We obtained the deformation characteristics of the soil and rock slope with particle image velocimetry and the laser speckle technique. The test analysis shows that the slope sliding can be divided into three parts: displacements at the top, the middle, and the bottom of the slope; the decrease in the rock mass Barton joint roughness coefficient, and the increase in soil thickness, angles of the rock mass and soil mass lead to larger sliding displacements. Furthermore, we analyzed the different angles between the rock mass and soil thickness. The test result shows that the displacement of slope increases with larger angle of the rock mass. Conclusively, all these results can help to explain the soil-rock interfacial sliding mechanism.  相似文献   

9.
Rock slope stability is of great concern along highway routes as stability problems on cut slopes may cause fatal events as well as loss of property. In rock slope engineering, stability evaluations are commonly performed by means of analytical or numerical analyses, principally considering the factor of safety concept. As a matter of fact, the probabilistic assessment of slope stability is progressively getting popularity due to difficulties in assigning the most appropriate values to design parameters in analytical or numerical methods. Additionally, the effect of heterogeneities in rock masses and discontinuities on the analysis results is minimized through the probabilistic concept. In this study, slope stability of high and steep sedimentary rock cut slopes along a state highway in Adilcevaz-Bitlis (Turkey) was evaluated on the basis of probabilistic approach using the Slope Stability Probability Classification (SSPC) system. The probabilistic assessment indicates major slope stability problems because of discontinuity controlled and discontinuity orientation independent mass movements. Almost all studied cut slopes suffer from orientation-independent stability problems with very low stability probabilities. Additionally, the probability of planar and toppling failures is significantly high with respect to the SSPC system. The stability problems along the investigated rock slopes were also verified by field reconnaissance. Remedial measures such as slope re-design and reinforcement at the studied locations should be taken to prevent hazardous events along the highway. On the other hand, the probabilistic approach may be a useful tool during rock slope engineering to overcome numerous uncertainties when probabilistic and analytic results are compared.  相似文献   

10.
The buckling failure of stratified rock slopes intersected by a set of steep discontinuities that are approximately parallel to the slope surface is frequently encountered while constructing railways and roadways in mountainous areas. In this study, an analytical approach based on the energy equilibrium principle is presented to solve the flexural buckling stability of stratified rock slopes within the framework of multilayer beam theory. The generalized HoekBrown failure criterion is introduced to reflect the influences of slope size(scale effects) on the buckling stability. Subsequently, numerical and physical modellings from previous literatures are employed to validate the proposed approach. Furthermore, a practical case of Bawang Mountain landslide is also used for the comparative analysis. The study shows that the present analytical approach is capable to provide a more reasonable assessment for the buckling failure of stratified rock slopes, compared with several existing analytical approaches. Finally, a detailed parametric study is implemented, and the results indicate that the effects of rock strength, rock deformation modulus, geological strength index, layer thickness and disturbance degree of rock mass on the buckling failure of stratified rock slopes are more significant than that of rock type and slope angle.  相似文献   

11.
本文介绍新滩滑坡后两岸边坡监测的工作,对边坡变形提出了趋势意见。认为新滩斜坡目前正处于整体稳定下的局部调整阶段,变形缓慢平稳,但要注视广家崖的危岩动态;链子崖仍有趋势性的倾江形变。5—6号缝围成的7万方危岩及江段的5万方危岩体尚有一触即崩之势,须加强监视。  相似文献   

12.
以国家石油战略储备地下水封洞库备选基地——烟台福山区九目山岩体完整性勘探评价项目为例,阐述了层析静校正技术的原理,比较了层析静校正和折射静校正的应用效果,认为复杂地表区折射波静校正方法效果一般,而走时层析静校正方法则能准确地反演地表速度模型,较好地解决复杂地表的静校正问题。利用层析反演建立的地表速度模型剖面,计算出岩体完整性分级剖面,结合层析静校正反射波剖面进行综合解释,有效地解决了工程勘探中的地质问题。  相似文献   

13.
基于GEOSTUDIO软件,运用统计岩体力学理论,对新疆CHE水利枢纽不同工况下的边坡稳定性进行分析。结果表明:研究区工程地质条件复杂,断层、挤压破碎带及岩脉广泛发育,左右岸均存在5组优势结构面;对左右岸参数敏感性分析,两岸强卸荷岩体的粘聚力c对应的稳定性系数的曲线斜率远大于摩擦角φ对应的稳定性系数的曲线斜率,因此在一定范围内,坡体稳定性对粘聚力c值的变化更为敏感;研究区边坡在自然条件、蓄水条件及库水快速降升条件稳定系数K>1,即边坡处于稳定状态。  相似文献   

14.
Large-scale rock landslides have huge impacts on various large-scale rock engineering and project operations. They are also important aspects evaluating geological disasters. In the initial evaluations on the stability of large-scale rock landslides, in most cases, it is difficult to conduct evaluation or to have accurate evaluations because most of large-scale rock landslides are huge in size, high in slopes, and located in the canyon of mountains, which makes the exploration very difficult and thus hard to get credible data on slip surface form, location, depth and strength. This paper describes the Badi landslide happened along the Lancang River, and systematically introduces methods to analyze and verify large-scale slip surface form using terrain conditions surrounding the large-scale landslide, shape of the slide walls, and development patterns of streams and gully. This paper also introduces ways to obtain strength parameters of slip surface with the soil in the slide zone by using the principles of stress state, principles of gravity compaction, structure regeneration and strength regeneration. It is confirmed that analyzed results to the slip surface are basically consistent with the exploration results. The methods introduced here have been successfully applied to evaluate the stability of Badi large-scale rock landslide and have been applied in engineering practices.  相似文献   

15.
危岩体崩塌是地质灾害的常见形式,对人口密集区域和工程施工威胁很大,因此需要对其进行加固或者清除。此类地质灾害多分布在山区,由于地形复杂、植被茂密,传统的测量方法耗时、耗力且数据误差大。三维激光扫描技术具有快速和非接触的特点,它能辅助内业设计人员分析识别危岩体存在,为危岩体稳定性分析提供精确、多元化的基础数据,为设计方案工程量计算和投资预算提供精确数值。文中结合工程实例介绍了三维激光扫描的作业方法,以及辅助危岩体清除治理设计的全过程,为以后类似项目提供一定参考。  相似文献   

16.
滑坡是水库库区主要地质灾害类型之一,开展水库滑坡成因机制研究具有重要理论意义和工程应用价值.利用WebofScience(WoS)数据库和VOSviewer文献计量工具对1999-2018年已发表的969篇以水库滑坡为主题的相关论文进行研究趋势分析.文献计量分析表明三峡库区滑坡稳定性和变形研究是未来水库滑坡成因机制研究主要趋势.从库水对滑坡的宏观力学作用方式、库水作用下岩土体渗流应力耦合机理和库水对岩土体劣化作用过程等方面,对国内外水库滑坡成因机制研究的主要成果与进展进行了综述.综合现有的研究成果指出水库滑坡在精细化地质建模、岩土体多场耦合特征参数获取和岸坡长期演化评价等方面尚存在不足.基于上述问题,提出水库滑坡成因机制研究应以多场信息监测为重要手段,立足多学科交叉,采用大数据融合与挖掘和人工智能技术等解决水库滑坡长期演化趋势难题.考虑水库滑坡所处地质环境的复杂性,建议未来应在水库滑坡立体精细地质建模、多场关联监测、地质结构多场多尺度演变过程、基于监测数据大数据分析的滑坡预警阈值确定和原位试验综合平台构建等方面进一步深入研究.  相似文献   

17.
Slope reinforcement for housing in Three Gorges reservoir area   总被引:1,自引:1,他引:0  
The Three Gorges Project of the Yangtze River is the largest hydropower-complex project under construction in the world. Under the largescale relocation projects, 2874 engineered slopes are formed along with the construction of new towns. In this paper, the cutting slopes are mainly soil slopes and rock slopes. Soil slopes include residual soil slopes, colluvial accumulation slopes, swelling soil slopes, and artificial earth fill slopes, etc. Rock slopes include blocky structure rock slopes, layer structure rock slopes, and clastic structure rock slopes, etc. Varied protection measures have been used for slope protection in the reservoir area including shotcrete concrete-anchor bars, frame beams, retaining walls, slope stabilizing piles, sheet-pile walls, anchorage anti-shear tunnels, flexible protection grids, and drainage, etc. Besides, slope deformation monitoring systems have been set up to monitor deformation failure and the stability state of slopes. The protection measures have guaranteed slope safety and maintained a harmony with the urban environment and surrounding landscape.  相似文献   

18.
砂石骨料在混凝土中起着极其重要的作用,其质量关系工程寿命的大计。该文选择山东省荣成市宁津甲子山地区正长岩体作为研究对象,对该地区正长岩体作为混凝土骨料的适宜性进行了评价研究。通过野外实地调查及大量的分析测试数据对该地区三叠纪宁津所序列甲子山单元、东山单元、朝阳洞单元岩石进行了分析研究,确定其用作粗细骨料的适宜性,并提出了开采的建议。  相似文献   

19.
Rock mass unloading is an important rock engineering problem because unloading may impact the stability of a rock mass slope. Based on hydroelectric engineering principles, this study focuses on the classification of unloading zones to reflect the rock mass structure characteristics. Geological background and slope structure of the study region were considered to investigate the distribution and deformation of the unloading process. Quantitative indices were classified according to the formation mechanisms and the geological exhibition of unloading zones. The P-wave velocity (V P ), the ratio of the wave velocity (K V , the ratio of the test P-wave velocity along the adit depth to the P-wave velocity of intact rock), the sum of joint openings every 2 meters (S t ), and the density of open joints (D t ) were calculated as quantitative indices for the rock mass unloading zone. The characteristics of the unloading zone of rock mass slopes at the dam site were successfully determined. The method of combining qualitative data with quantitative indices was found to be effective for the classification of slope unloading zones.  相似文献   

20.
通过现场调查和理论分析,研究了拟建的怒江左岸马跨地—俄夺罗水电站工程建设区地质环境条件及地质灾害类型、分布、规模,分析了地质环境条件对水电工程的影响及水电站建设和运营过程中对地质环境条件的影响,探讨了怒江左岸小型水电工程地质环境适宜性,提出了地质灾害防治措施建议。认为从地质环境条件看,怒江左岸建设小型水电工程是基本适宜的。  相似文献   