首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Sediments produced from eroding cultivated land can cause on‐site and off‐site effects that cause considerable economic and social impacts. Despite the importance of soil conservation practices (SCP) for the control of soil erosion and improvements in soil hydrological functions, limited information is available regarding the effects of SCP on sediment yield (SY) at the catchment scale. This study aimed to investigate the long‐term relationships between SY and land use, soil management, and rainfall in a small catchment. To determine the effects of anthropogenic and climatic factors on SY, rainfall, streamflow, and suspended sediment concentration were monitored at 10‐min intervals for 14 years (2002–2016), and the land use and soil management changes were surveyed annually. Using a statistical procedure to separate the SY effects of climate, land use, and soil management, we observed pronounced temporal effects of land use and soil management changes on SY. During the first 2 years (2002–2004), the land was predominantly cultivated with tobacco under a traditional tillage system (no cover crops and ploughed soil) using animal traction. In that period, the SY reached approximately 400 t·km?2·year?1. From 2005 to 2009, a soil conservation programme introduced conservation tillage and winter cover crops in the catchment area, which lowered the SY to 50 t·km?2·year?1. In the final period (2010–2016), the SCP were partially abandoned by farmers, and reforested areas increased, resulting in an SY of 150 t·km?2·year?1. This study also discusses the factors associated with the failure to continue using SCP, including structural support and farmer attitudes.  相似文献   

2.
IINTRODUCTIONTheannualaverageruff-offinthewatershedoftheGongzuiReservoiris50billioncubicmeterswithanaveragesedimentloadof34.7milliontonsperyear.Finesedimentwithd,,=0'055mmcompose97%oftheiota]sedimentload.Theannualcoarsegravelpericleswithd,,=58.5mmisaboutonemilliontons.TheendofbackWateris38kmawayfromthedam.Thereservoirwasoriginallydesignedtoatotalstoragecapacityof374millioncubicmeters,inwhich102millioncubicmetersisregulationstoragecapacityand243millioncubicmetersis'dead'storagecapacityfo…  相似文献   

3.
Sediment rating curves are commonly used to estimate the suspended sediment load in rivers and streams under the assumption of a constant relation between discharge (Q) and suspended sediment concentrations (SSC) over time. However, temporal variation in the sediment supply of a watershed results in shifts in this relation by increasing variability and by introducing nonlinearities in the form of hysteresis or a path‐dependent relation. In this study, we used a mixed‐effects linear model to estimate an average SSC–Q relation for different periods of time within the hydrologic cycle while accounting for seasonality and hysteresis. We tested the performance of the mixed‐effects model against the standard rating curve, represented by a generalized least squares regression, by comparing observed and predicted sediment loads for a test case on the Chilliwack River, British Columbia, Canada. In our analyses, the mixed‐effects model reflected more accurate patterns of interpolated SSC from Q data than the rating curve, especially for the low‐flow summer months when the SSC–Q relation is less clear. Akaike information criterion scores were lower for the mixed‐effects model than for the standard model, and the mixed‐effects model explained nearly twice as much variance as the standard model (52% vs 27%). The improved performance was achieved by accounting for variability in the SSC–Q relation within each month and across years for the same month using fixed and random effects, respectively, a characteristic disregarded in the sediment rating curve. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

4.
The utilization of sediment in reservoirs as resources is an efficient way to reduce reservoir sedi-mentation and turn disadvantage into benefit. Based on economic, social and ecological functions of sediment resources, this paper puts forward a two-layer, three-dimensional evaluation index system. It also establishes six direct and indirect indicators with their formulas to calculate the comprehensive benefits of sediment utilization in the Xixiayuan reservoir of the Yellow River with a volume of 2000 m3. The results show that social benefits would be more prominent, with the ecological benefits coming second. This demonstrates that the indirect public value of utilizing the sediment resources in the Yellow River Basin can be far greater than its direct economic value.  相似文献   

5.
Wetlands are known for their water filtration (or purification) function. Although different wetland types differ in their filtration capacity, they are usually aggregated together in economic valuation studies. Here, we explicitly separate the valuation of the suspended sediment and phosphorus (P) filtration services of the four major wetland types—bogs, fens, marshes and swamps—found in southern Ontario, Canada. The areal extents of the four wetland types are derived from the Canadian Wetland Inventory (CWI) progress map, while the sediment accretion rate is used as the key variable regulating the suspended sediment and P filtration functions. Based on available literature data, we assess the relationship of the sediment accretion rate to wetland size. Because only weak positive correlations are found, we assign a mean (average) sediment accretion rate to each wetland type. The sediment accretion rates are combined with mean soil P concentrations to estimate Pretention rates by the wetlands. The replacement cost method is then applied to valuate the sediment and P filtration services. The unit values for both sediment and P retention decrease in the order: marshes > bogs ≈ swamps > fens. The total value of sediment plus phosphorus removal by all wetlands in southern Ontario amounts to $4.2 ± 2.9 billion per year, of which about 80% is accounted for by swamps. We further assess the costs of different options to offset the additional P loading generated in a hypothetical scenario whereby all wetlands are converted to agriculture. The results demonstrate that replacing the P filtration function of existing wetlands with conventional land management and water treatment solutions is not cost-effective, hence reinforcing the importance of protecting existing wetlands.  相似文献   

6.
In Mediterranean semi‐arid conditions, the availability of studies monitoring channel adjustments as a response to reforestation and check dams over representative observation periods, could help develop new management strategies. This investigation is an integrated approach assessing the adjustments of channel morphology in a typical torrent of southern Italy after land‐use changes and check dam construction across a period of about 60 years. A statistical analysis of historical rainfall records, an analysis of land‐use changes in the catchment area and a geomorphological mapping of channel adjustments were carried out and combined with field surveys of bed surface grain‐size over a 5‐km reach including 14 check dams. The analysis of the historical rainfall records showed a slight decrease in the amount and erosivity of precipitation. Mapping of land‐use changes highlighted a general increase of vegetal coverage on the slopes adjacent to the monitored reaches. Together with the check dam network installation, this increase could have induced a reduction in water and sediment supply. The different erosional and depositional forms and adjustments showed a general narrowing between consecutive check dams together with local modifications detected upstream (bed aggradation and cross‐section expansion together with low‐flow realignments) and downstream (local incision) of the installed check dams. Changes in the torrent bends were also detected as a response to erosional and depositional processes with different intensities. The study highlighted: the efficiency of check dams against the disrupting power of intense floods by stabilizing the active channel and the influence of reforestation in increasing hillslope protection from erosion and disconnectivity of water and sediment flows towards the active channel. Only slight management interventions (for instance, the conversion of the existing check dams into open structures) are suggested, in order to mobilize the residual sediment avoiding further generalized incision of the active channel and coast line erosion. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

7.
《国际泥沙研究》2023,38(5):653-661
Studying the characteristics of runoff and sediment processes and revealing the sources of sediment provide key guidance for the scientific formulation of relevant soil erosion protection measures and water conservancy development plans. In the current study, the flow and sediment data of five hydrological stations on the main stream of the Fu River Basin (FRB) from 2007 to 2018 were selected to identify flood events, explore the variation of sediment transport along the FRB, and clarify the sediment sources. The results found that the Jiangyou–Fujiangqiao section is the main source of sediment in the FRB during the flood season. The runoff volume and sediment load during flood events in the Jiangyou–Fujiangqiao section accounted for 35% and 145% respectively of that of Xiaoheba station. These results combined with the change of the sediment load before and after the 2008 Wenchuan Earthquake (May 12) show that the sediment in this section mainly comes from the Fu River tributary–the Tongkou River watershed. The calculation results for the sediment carrying capacity of the Fu River show that the main stream was in a state of erosion in theory. However, according to the calculation results for the interval sediment yield during flood events, the sediment load at the Xiaoheba station was smaller than that at the Shehong station upstream. The analysis indicates that this was not because of sediment deposition in the river channel, but because of sand mining in the river channel and sediment interception by water conservancy projects. If heavy rainfall occurs in the FRB, the sediment accumulated upstream will move downstream with the resulting flood, and the sediment yield in the FRB may further increase. These research conclusions can provide reference information for improving the prediction and management ability of soil and water loss in the FRB and scientific regulation of the Three Gorges Reservoir.  相似文献   

8.
In this paper we quantitatively test the hypothesis that soil freeze–thaw (FT) processes significantly increase the potential for upland hillslope erosion during run‐off events that follow thaw. We selected a highly frost‐susceptible silt to obtain an upper bound on FT effects, and completed three series of six experiments each to quantify differences in soil erosion and rill development in a bare soil following a single FT cycle. Each series represented a specific soil moisture range: 16–18 per cent, 27–30 per cent and 37–40 per cent by volume, with nominal flow rates of 0·4, 1·2 and 2·4 L/min and slopes of 8° and 15°. Each experiment used two identical soil bins: one a control (C) that remained unfrozen, and another that was frozen and thawed once. Standard soil characterization tests did not detect significant differences between the FT and C bins. We measured cross‐sectional geometry of an imposed straight rectangular rill before each experiment, sediment load during and rill cross‐sections after. Changes in cross section provided detailed measures of erosion at specific locations, while sediment load from time series run‐off samples integrated the rill erosion. Several parameters, including average maximum rill width, average maximum rill depth, rill cross‐section depth measures and sediment load, all followed similar trends. Each was greater in the FT than in the C, with values that generally increased with slope and flow. However, soil moisture was the only parameter that affected the FT/C ratios. Average sediment load grouped by soil moisture provided FT/C ratios of 2·4, 3·0 and 5·0 for low, mid and high moisture, respectively. In contrast, a ‘dry’ experiment at 4–5 per cent soil moisture had FT/C of 1·02 for sediment load. These results show a dramatic increase with soil moisture in the rate and quantity of bare soil eroded due to the FT cycle. As both FT and C results were highly sensitive to initial conditions, minimum differences in soil weight, bulk density and soil moisture through each series of experiments were required to achieve consistent results, indicating that rill erosion may be chaotic. Published in 2005 by John Wiley & Sons, Ltd.  相似文献   

9.
以三峡工程为核心的梯级水库群联合调度运用显著改变水沙条件,坝下游河段出现长时间、长距离的冲淤调整,长江中下游沙量平衡分析是合理评估水库群修建对河道影响的重要依据,是河湖管理与保护的关键支撑.本文基于长时间序列原型观测资料,采用沙量平衡法分析长江中下游不同时空尺度泥沙沿程恢复特征,对比断面地形法计算结果,结合河道空间区域性特征,从临底悬沙测验误差、断面代表性及断面间距、河道采砂等多角度深入揭示两种方法计算冲淤量产生差异的主要原因.结果表明:(1)2003-2018年宜昌至大通河段冲刷泥沙10.76亿t,其中粒径d<0.125 mm的泥沙冲刷量占比达90.9%.以螺山为界,宜昌至螺山段"粗细均冲",螺山至大通河段则"细冲粗淤";(2)宜昌至大通河段2003-2018年沙量平衡法与断面地形法计算冲淤量相对偏差为71%,从沿程差异分布来看,距离三峡大坝坝址较近的宜昌至沙市河段两方法计算绝对差值较小,而沙市至大通河段差值较大,占宜昌至大通全河段绝对偏差的近86%;(3)宜昌至沙市河段河道采砂量占实测河床冲刷量的比例约为20%,临底悬沙对输沙量的改正比例为13.2%~26.7%(平均约为20%),修正后,沙量平衡法、断面地形法计算结果吻合相对较好;沙市至大通河段泥沙测验、固定断面布设、河道采砂等是导致沙量平衡法与断面地形法出现差异的主要原因.  相似文献   

10.
This paper discusses aspects of grass vegetation in relation to soil erosion control. By means of a literature research, four options for using grass vegetation were recognized, each having its own requirements concerning maintenance, vegetation characteristics and field layout. The main filter mechanisms, application in the field and effects on runoff and soil loss are discussed. Field experiments on filter strips were carried out to determine whether literature data for water and sediment retention by vegetation can be applied to sloping loess soils in South Limburg (The Netherlands). The field experiments simulated a situation in which surface runoff carrying loess sediment from an upslope field enters a grass strip. The retention of water and sediment by grass strips was determined by measuring runoff discharge and the sediment concentration at the inflow and outflow points from bordered plots. Two locations with different grass age and agricultural management were studied. Results show that grass strips are effective in filtering sediment from surface runoff as long as concentrated flow is absent. Outflow sediment concentrations could be described as a function of inflow concentrations and strip width. Reductions of sediment discharge varied between 50–60, 60–90 and 90–99% for strips of 1, 4–5 and 10 m width, respectively. Old grass, extensively used as pasture, is more effective in reducing erosion than the younger grass which was often accessed by tractors for mowing. Differences in water retention between both grass locations appear to be caused mainly by differences in grass density.  相似文献   

11.
In this paper sediment yield data, measured from 1978 to 1994 in two small Calabrian basins (W2 and W3) reafforested with eucalyptus trees (Eucalyptus occidentalis Engl.), and the Modified Universal Soil Loss Equation (MUSLE) applied in a distributed form are used to evaluate the anti-erosive effects of eucalyptus cover. At first step the sediment yield measurements observed in W2 basin are used to estimate a single cover management factor representative of the eucalyptus coppice and equal to the median value (0·164) of the cover management factor values calculated for each runoff event. Then, the reliability of the selected representative cover management factor is verified on W3 by comparing the cumulative distribution function (CDF) of the measured sediment yield with the CDF of the calculated one. Finally, the temporal analysis of the crop and management factor is developed searching, at monthly and annual scale, the correlation between crop anti-erosive effectiveness and rainfall erosivity index. © 1998 John Wiley & Sons, Ltd.  相似文献   

12.
底泥疏浚效果及环境效应研究进展   总被引:35,自引:5,他引:35  
底泥疏浚的效果至今仍存在很大争议,其中之一是疏浚后所产生的环境效果有可能偏离人们的期望.疏浚能够有效的削减沉积物中营养物、重金属和持久性有机物等污染物含量,但疏浚过程中会引起污染物向水体释放,疏浚后的界面过程有可能对疏浚效果产生较大影响.底泥疏浚对水体富营养化的控制有成功的经验也有失败的教训,不同的湖泊疏浚后对营养盐释放的控制效果不同.底泥疏浚往往对底栖生物产生危害,具体表现为种类、丰富度与生物量的减少,群落结构发生变化,多样性降低;疏浚后微生物胞外酶活性降低,底泥疏浚对沉积物代谢功能存在显著影响,底栖生物和酶活性的恢复需要长期的过程.底泥疏浚对湖泊水污染控制具有时效性,疏浚方式、疏浚深度与疏浚时令是疏浚工程应关注的问题.  相似文献   

13.
Many reservoirs around the world are being operated based on rule curves developed without considering the evacuation of deposited sediment. Current reservoir simulation and optimization models fall short of incorporating the concept of sustainability because the reservoir storage losses due to sedimentation are not considered. This study develops a new model called Reservoir Optimization‐Simulation with Sediment Evacuation (ROSSE) model. The model utilizes genetic algorithm based optimization capabilities and embeds the sediment evacuation module into the simulation module. The sediment evacuation module is implemented using the Tsinghua university flushing equation. The ROSSE model is applied to optimize the rule curves of Tarbela Reservoir, the largest reservoir in Pakistan with chronic sedimentation problems. In the present study, rule curves are optimized for maximization of net economic benefits from water released. The water released can be used for irrigation, power production, sediment evacuation, and for flood control purposes. Relative weights are used to combine the benefits from these conflicting water uses. Nine sets of rule curves are compared, namely existing rule curves and proposed rule curves for eight scenarios developed for various policy options. These optimized rule curves show an increase of net individual economic benefits ranging from 9 to 248% over the existing rule curves. The shortage of irrigation supply during the simulation period is reduced by 38% and reservoir sustainability is enhanced by 28% through increased sediment evacuation. The study concludes that by modifying the operating policy and rule curves, it is possible to enhance the reservoir's sustainability and maximize the net economic benefits. The developed methodology and the model can be used for optimization of rule curves of other reservoirs with sedimentation problems. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

14.
Unsuccessful attempts to use process‐scale models to predict long‐term aeolian sediment transport patterns have long been a feature of aeolian research. It has been proposed that one approach to overcome these problems is to identify micro‐scale variables that are important at longer timescales. This paper assesses the contribution of two system variables (secondary airflow patterns and fetch distance) to medium‐term (months to years) dune development. The micro‐scale importance of these variables had been established during previous work at the site (Magilligan Strand, Northern Ireland). Three methods were employed. First, sand drift potentials were calculated using 2 years of regional wind data and a sediment transport model. Second, wind data and large trench traps (2 m length × 1 m width × 1·5 m depth) were used to assess the actual sediment transport patterns over a 2‐month period. Third, a remote‐sensing technique for the identification of fetch distance, a saltation impact sensor (Safire) and wind data were utilized to gauge, qualitatively, sediment transport patterns over a 1‐month period. Secondary airflow effects were found to play a major role in the sediment flux patterns at these timescales, with measured and predicted rates matching closely during the trench trap study. The results suggest that fetch distance is an unimportant variable at this site. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

15.
运河(杭州段)沉积物磷释放的模拟试验   总被引:18,自引:1,他引:18  
采用室内模拟的方法研究了扰动情况下运河(杭州段)表层沉积物磷的释放对上覆水的影响以及投加石灰、投加三气氛发化铁、连续曝气、换水清洗等措施对沉积物磷释放的控制效果,研究表明,在扰动、开放体系条件下,运河(杭州段)沉积物磷释放导致的上覆水总磷浓度在释放初期最高,随时间逐渐下降,表现出净吸附,采集于有机污染较重河段的沉积物磷释放能力显著高于总磷含量较高但以重金属污染为主的河段的沉积物,上覆水投加石灰最终导致沉积物磷释放量的增加,投加三氯化铁显著降低了上覆水总磷浓度,上覆水连续曝气降低了上覆水的平衡磷浓度、换水清洗对上覆水磷浓度的降低效果是有限的,然而上述措施均未能将上覆水总磷浓度控制在V类水的浓度限定值以下,因此,就上覆水TP的浓度指标而言,运河(杭州段)沉积物的内源释放对其影响很大。  相似文献   

16.
The management of tidal inlets requires the accurate prediction of equilibrium morphologies. In areas where the flow from rivers is highly regulated, it is important to give decision makers the ability to determine optimal flow management schemes, in order to allow tidal inlets to function as naturally as possible, and minimise the risk of inlet closure. The River Murray Mouth in South Australia is one such problem area. Drought and the retention of water for irrigation and urban water consumption have limited the amount of water entering the estuary. As a result, sediment from the coastal environment is being deposited in the mouth of the estuary, reducing the effect of further coastal interactions. Currently, situations such as this are modelled using traditional process-based methods, where wave, current, sediment transport and sediment balance modules are linked together in a time-stepping process. The modules are reapplied and assessed until a stable morphology is formed. In this paper, new options for modelling equilibrium morphologies of tidal inlets are detailed, which alleviate some of the shortfalls of traditional process-based models, such as the amplification of small errors and reliance on initial conditions. The modelling problem is approached in this paper from a different angle and involves the use of entropy based objective functions, which are optimised in order to find equilibrium morphologies. In this way, characteristics of a system at equilibrium can be recognised and a stable system predicted without having to step through time. This paper also details the use of self-organisation based modelling methods, another non-traditional model application, where local laws and feedback result in the formation of a global stable equilibrium morphology. These methods represent a different approach to traditional models, without some of the characteristics that may add to their limitations. Responsible Editor: Alejandro Souza  相似文献   

17.
《国际泥沙研究》2022,37(5):639-652
The Jinsha River comprises the upper reaches of the Yangtze River, which is the river section with the highest sediment content. Monitoring of sediment transport in the Jinsha River is done to the guarantee for the normal operation of the Three Gorges Reservoir. In the current study, a copula function was used to do a joint probability analysis of the water and sediment in the Jinsha River Basin (JRB), further a sediment load prediction model based on the copula function also was constructed. The results show that the average annual flow from 2001 to 2018 at the outlet of the Jinsha River (Yibin station) is about 60.43 billion m3, and the average annual sediment load is about 58.82 million t. The linear correlation coefficient between annual flow and annual sediment load is 0.28. The best marginal distribution for annual flow and sediment load is Pearson Type Three (PE3) and Generalized Normal (GNO), respectively, and the best fit for the combined distribution of the two variables is the Frank copula function. The synchronous probability of water and sediment occurrence is 0.459, and the asynchronous probability is 0.541. Based on the copula prediction model, the sediment load can be effectively simulated, and the correlation coefficient between the simulated sequence and the measured sequence reached 0.93. The current study provides important significance for the analysis of water and sediment in the JRB, which is beneficial to the management of Three Gorges Reservoir sediment discharge in the upstream and downstream.  相似文献   

18.
Hydro-economic models: Concepts, design, applications, and future prospects   总被引:6,自引:0,他引:6  
Future water management will shift from building new water supply systems to better operating existing ones. The variation of water values in time and space will increasingly motivate efforts to address water scarcity and reduce water conflicts. Hydro-economic models represent spatially distributed water resource systems, infrastructure, management options and economic values in an integrated manner. In these tools water allocations and management are either driven by the economic value of water or economically evaluated to provide policy insights and reveal opportunities for better management. A central concept is that water demands are not fixed requirements but rather functions where quantities of water use at different times have varying total and marginal economic values. This paper reviews techniques to characterize the economic value of water use and include such values in mathematical models. We identify the key steps in model design and diverse problems, formulations, levels of integration, spatial and temporal scales, and solution techniques addressed and used by over 80 hydro-economic modeling efforts dating back 45-years from 23 countries. We list current limitations of the approach, suggest directions for future work, and recommend ways to improve policy relevance.  相似文献   

19.
1 INTRODUCTIONIn Anstria reservoirs are frequentiy multi-purpose schemes, being used for power generation, floodprotechon and for wate suPPly downstream. These reservoirs have some adVerse imPaCts on theenvironment around the reservoir and also on the dOwnstream pat:. in rivers with mean annual discharge above 30 m3ls about 36 % of the total length of l884 lQn isimpounded, and only 35% remains as free flowing sections (Muhar, l992),. flooding has been, and continues to be, a serious pr…  相似文献   

20.
《国际泥沙研究》2019,34(6):537-549
Dam removal can generate geomorphic disturbances, including channel bed and bank erosion and associated abrupt/pulsed release and downstream transfer of reservoir sediment, but the type and rate of geomorphic response often are hard to predict. The situation gets even more complex in systems which have been impacted by multiple dams and a long and complex engineering history. In previous studies one-dimensional (1-D) models were used to predict aspects of post-removal channel change. However, these models do not consider two-dimensional (2-D) effects of dam removal such as bank erosion processes and lateral migration. In the current study the impacts of multiple dams and their removal on channel evolution and sediment delivery were modeled by using a 2-D landscape evolution model (CAESAR-Lisflood) focusing on the following aspects: patterns, rates, and processes of geomorphic change and associated sediment delivery on annual to decadal timescales. The current modeling study revealed that geomorphic response to dam removal (i.e., channel evolution and associated rates of sediment delivery) in multiple dam settings is variable and complex in space and time. Complexity in geomorphic system response is related to differences in dam size, the proximity of upstream dams, related buffering effects and associated rates of upstream sediment supply, and emerging feedback processes as well as to the presence of channel stabilization measures. Modeled types and rates of geomorphic adjustment, using the 2-D landscape evolution model CAESAR-Lisflood, are similar to those reported in previous studies. Moreover, the use of a 2-D method showed some advantages compared to 1-D models, generating spatially varying patterns of erosion and deposition before and after dam removal that provide morphologies that are more readily comparable to field data as well as features like the lateral re-working of past reservoir deposits which further enables the maintenance of sediment delivery downstream.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号