1.
金沙江下游4个梯级水电站总装机容量相当于两座三峡水库,是“西电东送”中部地区的源头工程,工程效益发挥对经济社会发展意义重大。2012年以来,向家坝、溪洛渡、乌东德和白鹤滩电站等陆续蓄水运行,层层拦截金沙江的泥沙,2013—2020年向家坝出库年输沙量均值下降至152万t,减幅超过99%。大量泥沙淤积在梯级水库内,同时向家坝以下河道发生长距离冲刷。本文以自金沙江下游工程筹建以来的观测资料为基础,针对梯级水库的泥沙淤积和坝下游河道冲刷规律开展研究,结果表明:金沙江下游四个梯级电站自建成运行至2020年底,累计淤积泥沙约5.98亿m3,其中溪洛渡库区淤积量占比达92.5%,2013-2020年溪洛渡和向家坝水库排沙比分别为2.64%和22.2%,其水库泥沙主要淤积在常年回水区的干流河道内,以死库容内淤积为主,侵占有效库容的比例小于1.3%。金沙江下游库区干流河道的峡谷特征明显,淤积多表现为主河槽的平铺式淤高。溪洛渡和向家坝库区淤积的泥沙沿程分选特征明显,越靠近坝前,中数粒径减小、细颗粒泥沙沙量百分数增加,极细颗粒泥沙会在库区一定范围内大量沉积。向家坝下游河床普遍冲刷,但...  相似文献   

2.
中国的水库泥沙淤积问题   总被引:18,自引:2,他引:16  
由于我国有许多河流是含沙最高、输沙量大的多泥沙河流,水库泥沙淤积问题异常严重.主要表现在:淤积数量大,淤积速率快.据统计,截止到1981年底全国水库总淤积量达115×10~8m~3.占统计水库总库容的14.2%.年平均库容损失率达2.3%,高于世界各国.水库的严重淤积,不仅影响水库兴利效益的发挥,严重威胁水库的使用寿命,而且还造成一系列在进行水库规划时未曾充分估计到的环境问题.本文重点从河流水文泥沙特性、我国水库淤积问题的严重性、水库淤积引起的问题及水库防淤减淤措施等4个方面作一较全面的分析和探讨.  相似文献   

3.
Lewis and Clark Lake is located on the main stream of the Missouri River. The reservoir is formed behind Gavins Point dam near Yankton, South Dakota, U.S.A. The Lewis and Clark Lake reach extends about 40 km from the Gavins Point dam. The reservoir delta has been growing since the closure of Gavins Point dam in 1955 and has resulted in a 21% reduction of storage within the maximum pool of the reservoir. Among several sediment management methods, drawdown flushing has been recommended as a possible management technique. The engineering viability of removing sediments deposited in the lake should be examined by numerical modeling before implementing a drawdown flushing. GSTARS4 was used for this study and calibrated by using measured data from 1975 to 1995. Channel cross-section changes and amount of flushed sediment were predicted with four hypothetical flow scenarios. The flushing efficiencies of all scenarios were estimated by comparing the ratios between water consumption and flushed sediment during flushing.  相似文献   

4.
Among the different controls of erosion budget at basin level, the relative impact of dams and land management is yet to be investigated. In this paper, the impact of dams on sediment yield has been assessed by using a conceptual modelling framework which considers the gross erosion and the cascade of dams constructed on a river network. The sediment budget has been estimated based on the gross erosion, deposition of sediment in reservoirs, and sediment yields of 23 mainland river basins of India. The gross erosion of the country is estimated as 5.11 ± 0.4 Gt yr?1 or 1559 t km?2 yr?1, out of which 34.1 ± 12% of the total eroded soil is deposited in the reservoirs, 22.9 ± 29% is discharged outside the country (mainly to oceans), and the remaining 43.0 ± 41% is displaced within the river basins. The river basins of northern India contribute about 81% of the total sediment yield from landmass while the share of southern river basins is 19%. The components of revised sediment budget for India are prominently influenced by the sediment trapped in reservoirs and the treatment of catchment areas by soil and water conservation measures. Analysis of sediment deposition in 4937 reservoirs indicated the average annual percentage capacity loss as 1.04% though it varies from 0.8% to >2% per year in smaller dams (1–50 Mm3 capacity) and from <0.5% to 0.8% per year in larger dams (51 to >1000 Mm3 capacity). Siltation of smaller dams poses a serious threat to their ecosystem services as they cater to a wider population for domestic, agricultural, and industrial purposes. Amongst the environment controls, land use significantly impacts the gross erosion rate and specific sediment yield as compared to climatic and topographic parameters. However, to analyse their integrated effect on the complex processes of sediment fluxes in a basin, further research efforts are needed. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

5.
《Water Policy》2002,3(6):491-505
It is often assumed that the main cause of contemporary erosion and dam sedimentation in tropical watersheds is the cultivation of steep slopes. This study, using fallout 137Cs to estimate net sediment loss since 1963 found erosion in the Nizao watershed of the Dominican Republic to be much lower than often reported for steep tropical hillsides. Because only 17% of the sediment moving into the reservoirs can be attributed to surface agricultural erosion, policies to eliminate upland agriculture will have limited benefits if the principal sources are of natural origin or associated with construction of the dams, and rural roads and trails.  相似文献   

6.
《国际泥沙研究》2019,34(6):537-549
Dam removal can generate geomorphic disturbances, including channel bed and bank erosion and associated abrupt/pulsed release and downstream transfer of reservoir sediment, but the type and rate of geomorphic response often are hard to predict. The situation gets even more complex in systems which have been impacted by multiple dams and a long and complex engineering history. In previous studies one-dimensional (1-D) models were used to predict aspects of post-removal channel change. However, these models do not consider two-dimensional (2-D) effects of dam removal such as bank erosion processes and lateral migration. In the current study the impacts of multiple dams and their removal on channel evolution and sediment delivery were modeled by using a 2-D landscape evolution model (CAESAR-Lisflood) focusing on the following aspects: patterns, rates, and processes of geomorphic change and associated sediment delivery on annual to decadal timescales. The current modeling study revealed that geomorphic response to dam removal (i.e., channel evolution and associated rates of sediment delivery) in multiple dam settings is variable and complex in space and time. Complexity in geomorphic system response is related to differences in dam size, the proximity of upstream dams, related buffering effects and associated rates of upstream sediment supply, and emerging feedback processes as well as to the presence of channel stabilization measures. Modeled types and rates of geomorphic adjustment, using the 2-D landscape evolution model CAESAR-Lisflood, are similar to those reported in previous studies. Moreover, the use of a 2-D method showed some advantages compared to 1-D models, generating spatially varying patterns of erosion and deposition before and after dam removal that provide morphologies that are more readily comparable to field data as well as features like the lateral re-working of past reservoir deposits which further enables the maintenance of sediment delivery downstream.  相似文献   

7.
泥沙问题是三峡工程建设与运行中的关键技术问题之一,只有妥善处理好泥沙问题,才能保证三峡工程长期有效使用,维持水库功能的全面发挥。本文首先结合实测水文、河道地形观测资料,对三峡水库运行近20年来的泥沙淤积特性及水库排沙比进行了较为全面的分析研究,并与已有研究成果进行了对比;其次,围绕防洪、航运以及坝前段的泥沙淤积等方面,进一步分析了水库淤积产生的影响。结果表明:三峡水库蓄水以来,在不考虑区间来沙的情况下,三峡水库共淤积泥沙20.484亿t,近似年均淤积1.102亿t,水库排沙比为23.6%,水库年均淤积量为原论证预测值的33%。其中,库区干流段累计淤积泥沙17.835亿m3(变动回水区冲刷0.694亿m3;常年回水区淤积18.529亿m3),淤积在水库防洪库容内的泥沙为1.648亿m3(干、支流分别淤积1.517亿m3和0.131亿m3),占水库防洪库容的0.74%,“十一五”攻关阶段研究得出的多年平均淤积量及排沙比较实测值均偏大,变动回水区冲淤则出现反向的...  相似文献   

8.
Reservoir siltation is one of the most important off‐site effects of soil erosion. In Burkina Faso a large number of small dams have been built to store rainfall and runoff water in the rainy season, which is much needed for domestic use, irrigation and stock watering in the dry season. This study quantifies the siltation rates of two small reservoirs in southwestern Burkina Faso by comparing the initial and current reservoir bed morphology and by analyzing variations in accumulated sediment in terms of stratigraphical changes and 137Cs concentrations. Results of a bathymetric survey show that both reservoirs have already lost approximately 10% to 15% of their original storage capacity at normal pool level and more than 60% of their initial inactive storage volume at spillway level in the last 15 to 20 years. During this period, inflow sediment had accumulated on the bottom of the reservoir to a thickness of 0.3 m to 0.5 m. Sediment core measurements confirmed this thickness by showing a clear stratigraphical change in core properties with significant variations in the 137Cs concentrations at these specific depths. The thickness of accumulated sediment on top of the relict soil indicates that the reservoirs have a ‘half‐life’ of about 40 to 45 years before siltation might affect its water supply and flood control. Compared with other reservoir studies in West Africa these siltation rates can be seen as reasonable but not alarmingly high. Nevertheless, many of the small dams built during the 1980s are likely to reach their ‘half‐life’ in about 10 to 20 years causing hydrological and geomorphological changes upstream and downstream of the dams. Therefore, further research studies should focus on prevention measures to reduce the off‐site effects of erosion and thus to slow down the process of siltation. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

9.
To maintain a reasonable sediment regulation system in the middle reaches of the Yellow River, it is critical to determine the variation in sediment deposition behind check‐dams for different soil erosion conditions. Sediment samples were collected by using a drilling machine in the Fangta watershed of the loess hilly–gully region and the Manhonggou watershed of the weathered sandstone hilly–gully (pisha) region. On the basis of the check‐dam capacity curves, the soil bulk densities and the couplet thickness in these two small watersheds, the sediment yields were deduced at the watershed scale. The annual average sediment deposition rate in the Manhonggou watershed (702.0 mm/(km2·a)) from 1976 to 2009 was much higher than that in the Fangta watershed (171.6 mm/(km2·a)) from 1975 to 2013. The soil particle size distributions in these two small watersheds were generally centred on the silt and sand fractions, which were 42.4% and 50.7% in the Fangta watershed and 60.6% and 32.9% in the Manhonggou watershed, respectively. The annual sediment deposition yield exhibited a decreasing trend; the transition years were 1991 in the Fangta watershed and 1996 in the Manhonggou watershed (P < 0.05). In contrast, the annual average sediment deposition yield was much higher in the Manhonggou watershed (14011.1 t/(km2·a)) than in the Fangta watershed (3149.6 t/(km2·a)). In addition, the rainfalls that induced sediment deposition at the check‐dams were greater than 30 mm in the Fangta watershed and 20 mm in the Manhonggou watershed. The rainfall was not the main reason for the difference in the sediment yield between the two small watersheds. The conversion of farmland to forestland or grassland was the main reason for the decrease in the soil erosion in the Fangta watershed, while the weathered sandstone and bare land were the main factors driving the high sediment yield in the Manhonggou watershed. Knowledge of the sediment deposition process of check‐dams and the variation in the catchment sediment yield under different soil erosion conditions can serve as a basis for the implementation of improved soil erosion and sediment control strategies, particularly in semi‐arid hilly–gully regions. Copyright © 2018 John Wiley & Sons, Ltd.  相似文献   

10.
Among the difficulties that influence future dam operations,reservoir sedimentation is the most problematic for engineers.This study predicted the amount and pattern of sedimentation for use in estimation of the useful lifespan of reservoirs and identification of optimal locations for outlets and intakes at the initial stages of dam design.Hydrographic surveys of different dams can provide better insight into this phenomenon.Latian Dam in Iran has conducted hydrographic surveys during 7 time periods.The amount and process of sedimentation in this reservoir were determined,and predictions of distribution of sediments were validated by well-known,common methods.The formation of a delta in the reservoir was investigated for different time periods after operation.Future problems due to the impacts of sedimentation on dam operation and the useful lifespan of the reservoir were predicted.In addition,the study results may be used for developing empirical methods to predict sedimentation patterns in other reservoirs.  相似文献   

11.
Construction of large dams is attractive because of their great benefits in flood control,hydropower generation,water resources utilization,navigation improvement,etc.However,dam construction may bring some negative impacts on sediment transport and channel dynamics adjustments.Due to the effects of recent water and soil conservation projects,sediment retention in the newly constructed large upstream reservoirs,and other factors,the sedimentation in the Three Gorges Reservoir(TGR)is quite different from the amount previously predicted in the demonstration stage.Consequently,based on the measured data,characteristics of sedimentation and the related channel deformation in the TGR were analyzed.The results imply that sediment transport tended to be reduced after the Three Gorges Project(TGP).Sedimentation slowed dramatically after 2013 and indicated obvious seasonal characteristics.Due to the rising water level in the TGR in the flood season,the yearly sediment export ratio(Eratio)was prone to decrease.The water level near the dam site should be reasonably regulated according to the flow discharge to improve the sediment delivery capacity and reduce sedimentation in the TGR,and to try to avoid situations where the flood retention time is close to 444 h.The depositional belt was discontinuous in the TGR and was mainly distributed in the broad reaches,and only slight erosion or deposition occurred in the gorge reaches.Sedimentation in the broad and gorge reaches accounted for 93.8% and 6.2% of the total sedimentation,respectively.The estuarine reach located in the fluctuating backwater area experienced alternate erosion-deposition,with a slight accumulative deposition in the curved reach.Sedimentation mainly occurred in the perennial backwater area.The insight gained in this study can be conducive to directly understanding of large reservoir sedimentation and mechanism of channel adjustment in the reservoir region in the main channel of large river.  相似文献   

12.
A method for rapid estimation of slopes of deposited sediment in reservoirs during unstable conditions is presented. As the limiting factor determining sediment load in a reservoir is the sediment carrying capacity of a current flowing through a reservoir, it is arqued that the slope of deposited sediment must be a function of the latter. After deriving an equation relating sediment slope to stream power, the latter being regarded as representative of sediment carrying capacity, a comparison between calculated and observed sediment slopes for average annual conditions in two South African reservoirs are presented. Using this equation as basic guideline, a semi-empirical graph is then presented which relates sediment slope to a factor representing average stream power in reservoirs.  相似文献   

13.
Dam construction greatly alters the channel boundary of rivers, making the dammed river system a human‐controlled system. Based on hydrometric data in the upper Changjiang River basin, the change in behaviour of sediment transport of some dammed rivers was studied. As a result, some phenomena of threshold and complex response were found. When the coefficient (Cr,a) of actual runoff regulation by reservoirs, defined as the ratio of total capacity of reservoirs to annual runoff input, is smaller than 10%, suspended sediment load at Yichang station, the control station of the Changjiang River, shows a mild decreasing trend. When this coefficient becomes larger than 10%, suspended sediment load decreases sharply. The coefficient of 10% can be regarded as a threshold. The Cr,a of 10% is also a threshold, when the variation of suspended sediment concentration (SSC) with Cr,a at Yichang station is considered. The impacts of reservoir construction can be divided into several stages, including road construction, dam building and closure, water storage and sediment trapping. During these stages, some complex response was identified. At the station below the dam, SSC increases and reaches a maximum, and then declines sharply. This phenomenon was found on the main‐stem and several major tributaries of the upper Changjiang River. In the Minjiang River, where a series of dams were built successively, the response of SSC is more complicated. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

14.
Restoration projects in the United States typically have among the stated goals those of increasing channel stability and sediment storage within the reach. Increased interest in ecologically based restoration techniques has led to the consideration of introducing beavers to degraded channels with the hope that the construction of beaver dams will aggrade the channel. Most research on beaver dam modification to channels has focused on the long‐term effects of beavers on the landscape with data primarily from rivers in the western United States. This study illustrated that a role exists for beavers in the restoration of fine‐grained, low gradient channels. A channel on the Atlantic Coastal Plain was analyzed before, during, and after beaver dams were constructed to evaluate the lasting impact of the beaver on channel morphology. The channel was actively evolving in a former reservoir area upstream of a dam break. Colonization by the beaver focused the flow into the channel, allowed for deposition along the channel banks, and reduced the channel width such that when the beaver dams were destroyed in a flood, there was no channel migration and net sediment storage in the reach had increased. However, the majority of the deposition occurred at the channel banks, narrowing the channel width, while the channel incised between sequential beaver dams. The study indicated that where channels are unstable laterally and bank erosion is a concern, the introduction of beavers can be a useful restoration tool. However, because of the likelihood of increased channel bed erosion in a reach with multiple beaver dams, they may not be the best solution where aggradation of an incised channel bed is the desired result. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

15.
Severe soil erosion occurs on the Loess Plateau in China, which makes the Yellow River the most sediment-laden river in the world. Construction of about 60,000 sediment check dams has remarkably controlled soil erosion on the Loess Plateau and reduced the sediment load of the middle and lower Yellow River. Nonetheless, little is known about the mechanism of erosion control and vegetation development of sediment check dams. The function of a single check dam mainly is trapping sediment, while the function of a train of check dams comprising dozens of or over hundreds of check dams in a gully encompasses controlling bed incision and reducing erosion energy. A formula was proposed to calculate the potential energy of bank failure and slope failure in a gully, which essentially constitutes the erosion energy. The erosion energy increases when gully incision occurs, which is induced by the incision of the Yellow River and its tributaries on the Loess Plateau. Sediment deposition in many gullies due to construction of check dams reduces the erosion energy to almost zero, which in turn greatly reduces soil erosion and sediment yield. Construction of check dams promotes vegetation development. The vegetation-erosion dynamics model was used to study the effect of check dams on vegetation development. Simulation results show that reforestation without check dam construction might result in an increase of vegetation cover in the first ten years and then a drop of vegetation cover to less than 10% in the later years. The check dams provide a foundation for vegetation development.  相似文献   

16.
All reservoirs are subjected to sediment inflow and deposition up to a certain extent leading to reduction in their capacity. Thus, the important practical problem related to the life of reservoir is the estimation of sedimentation quantity in the reservoirs. Large number of methods and models are available for estimation of reservoir sedimentation process. However, each model differs greatly in terms of their complexity, inputs and other requirements. In the simplest way, the fraction of sediment deposit in the reservoir can be determined through the knowledge of its trap efficiency. Trap efficiency (Te) is the proportion of the incoming sediment that is deposited or trapped in a reservoir. Most of the Te estimation methods define a relationship of the T, of the reservoir to their capacity and annual inflow, generally through curves. In this study, the empirical relationships given by Brune and Brown were used and compared for estimating the trap efficiency of Gobindsagar Reservoir (Bhakra Dam) on Satluj River in Bilaspur district of Himachal Pradesh, in the Himalayan region of India. A new set of regression equations has been developed for Brune's method and compared with Brown and other available Brune's equations. It has been found that Brune's equations developed in the present study estimated better than the other Brune's equations reported in literature. Later, in the present study it was found that Brown's approach was over estimating the T,. Hence it was again modified for Gobindsagar reservoir. It was also identified that sediments coming to this particular reservoir were mainly of coarse nature.  相似文献   

17.
Scouring and deposition processes resulting from variable rainfall and typhoon occurrence in tropical climatic conditions induce significant changes in the riverbeds of Taiwan. Along the Pachang River of western Taiwan, severe damage occurs during typhoons due to large and sudden variations in discharge, erosion, sediment transport and deposition. In order to simulate this process, the NETSTARS numerical modeling tool was used in the present paper. The influence of existing and planned check dam structures on flow control was also analyzed to determine their capacity to resist river erosion or to not be buried beneath sediments. Not only does the modeling tool allow calculation of the erosion-deposition behavior at the scale of the whole river, but it also provides local determination of the optimum location and characteristics such as foundation depth and lateral encroachment of future check dams. The results of a 10-year, long-term modeling simulation in terms of riverbed stability and scouring potential thus provide insights about unsafe future behavior at 4 sites. This numerical model provides a better general understanding and useful information for the optimal prevention of both the scouring damage and the burial related to sediment deposition with large changes in discharge and sediment transport.  相似文献   

18.
ON SOME KEY SEDIMENTATION PROBLEMS OF THREE GORGES PROJECT (TGP)   总被引:1,自引:0,他引:1  
I. INTRODUCTIONThe Three Gorges Project (TGP) being planned is to be located on the Yangtze River at Sandouplug, 44 km upstream of Yichang (Fig. l). A scheme studied in the feasibility stage has the crest ofthe dam placed at 185 m with a maximums height o…  相似文献   

19.
Silting of reservoirs is a ubiquitous process whenever water is impounded. Despite substantial work on the rates of silting, the spatial pattern of silting in reservoirs is not clearly understood. While it is anticipated that the variability of silting increases with decreasing reservoir size, not much is known about siltation in subtropical humid regions affected by monsoon rainfall. This paper presents the initial results of geomorphic analysis of six earthen check dams in the Shiwalik foothills of the Himalayas (India) in areas that are inhabited by high proportions of disempowered populations. These check dams include three small-sized dams (Dhamala-II, Rel Majra and Sukhomajri-II) and three medium-sized dams (Bunga-I, Parachh-II and Siswan). Field data were collected from each reservoir. The methods used included spatial interpolations of bed depth and silt thickness in each reservoir, Structure from Motion photogrammetry to extract multiple channel cross-sections from photographic scans along tributary mouths, texture analysis of bed and bank materials, and visual observations of hill slopes around the check dams. Based on this study, silt tended to concentrate either in the middle portion of the reservoir or near the dam; however, silt accumulation did not always occur along the dam or in the deepest portion of the reservoirs. Areas located downstream from these check dams are heavily used for various human activities and the channel network has almost been eliminated. While these earthen check dams may be cost-effective tools for water conservation in economically marginalized areas, if abandoned, these structures may pose a physical hazard to downstream communities. © 2019 John Wiley & Sons, Ltd. © 2019 John Wiley & Sons, Ltd.  相似文献   

20.
The process of dam removal establishes the channel morphology that is later adjusted by high-flow events. Generalities about process responses have been hypothesized, but broad applicability and details remain a research need. We completed laboratory experiments focused on understanding how processes occurring immediately after a sediment release upon dam removal or failure affect the downstream channel bed. Flume experiments tested three sediment mixtures at high and low flow rates. We measured changes in impounded sediment volume, downstream bed surface, and rates of deposition and erosion as the downstream bed adjusted. Results quantified the process responses and connected changes in downstream channel morphology to sediment composition, temporal variability in impounded sediment erosion, and spatial and temporal rates of bedload transport. Within gravel and sand sediments, the process response depended on sediment mobility. Dam removals at low flows created partial mobility with sands transporting as ripples over the gravel bed. In total, 37% of the reservoir eroded, and half the eroded sediment remained in the downstream reach. High flows generated full bed mobility, eroding sands and gravels into and through the downstream reach as 38% of the reservoir eroded. Although some sediment deposited, there was net erosion from the reach as a new, narrower channel eroded through the deposit. When silt was part of the sediment, the process response depended on how the flow rate influenced reservoir erosion rates. At low flows, reservoir erosion rates were initially low and the sediment partially exposed. The reduced sediment supply led to downstream bed erosion. Once reservoir erosion rates increased, sediment deposited downstream and a new channel eroded into the deposits. At high flows, eroded sediment temporarily deposited evenly over the downstream channel before eroding both the deposits and channel bed. At low flows, reservoir erosion was 17–18%, while at the high flow it was 31–41%.  相似文献   