 共查询到20条相似文献,搜索用时 15 毫秒
1.
Based on analyses of the theories of groundwater unsteady flow in deep well dewatering in the deep foundation pit,Theis equations are chosen to calculate and analyze the relationship between wa-ter level drawdown of confined aquifer and dewatering duration.In order to reduce engineering cost and diminish detrimental effect on ambient surrounding,optimization design target function based on the control of confined water drawdown and four restriction requisitions based on the control of safe water level,resistance to throwing up from the bottom of foundation pit,avoiding excessively great subsidence and unequal surface subsidence are proposed.Adeep well dewatering project in the deep foundation pit is optimally designed.The calculated results including confined water level drawdown and surface subsid-ence are in close agreement with the measured results,and the optimization design can effectively control both surface subsidence outside foundation pit and unequal subsidence as a result of dewatering.  相似文献   

2.
深基坑降水是确保地质工程安全的重要工程技术措施。以江苏省徐塘电厂翻车机室基坑降水方案确定为例,论述了建筑工程深基坑降水方案设计方法,得到了疏干降水量以及降水井数量。通过徐塘电厂翻车机室基坑降水工程实践,效果显著,可为条件类似地区工程建设提供技术参考。  相似文献   

3.
为了精确模拟预测松散沉积层中深基坑降水引起的地下水渗流场和地面沉降的变化特征,考虑土体孔隙度、渗透系数、储水率随地下水位下降发生的动态变化,建立了深基坑降水三维变参数非稳定渗流与太沙基一维固结理论的地面沉降耦合模型,并采用有限元数值分析方法对模型进行求解。以南京地铁三号线浦珠路站深基坑降水为例进行模拟计算。结果表明:采用15口坑内抽水井,抽水井过滤器埋深为22.0~37.0 m,基坑围护连续墙底部埋深至41.5 m为最优降水方案;不仅使基坑内地下水位满足开挖要求,又使基坑外地面沉降在控制范围内。经验证,所建立的模型合理,计算结果可靠,研究理论用于模拟预测此类地区深基坑降水引起的地下水流场变化具有较高的可信度。  相似文献   

4.
对济南地区基坑降水引起既有地基沉降的认识   总被引:3,自引:0,他引:3  
结合工程经验,对基坑降水引起的周边既有建筑地基沉降的影响因素进行了总结,针对采用分层总和法估算降水引起地基沉降公式中,对应附加应力段的压缩系数取值不准问题,提出了采用基于地层应力历史的降水引起周边地基沉降的估算方法,并结合工程实例对降水引起地基沉降进行了预测。  相似文献   

5.
根据下立交区间基坑特点,合理制定基坑工程降水方案。经工程实践证明,通过疏干井、混合井、降压井的合理设置,联合使用,科学有效地治理了地下水,较好地控制了因降水产生的工程风险。  相似文献   

6.
葛鹏  胡远  左新明 《探矿工程》2019,46(4):63-69
基坑降水的成功与否,将对基坑开挖和周边环境产生重要影响,因此有必要对基坑降水方案进行评估。针对扬中金源时代购物中心基坑降水问题,采用MIDAS/GTS对基坑降水效果进行研究。首先,依据地勘报告中提供的土体渗透系数,结合单井、双井抽水试验结果,反演出MIDAS/GTS中需要的土层渗流系数和边界函数;然后利用反演得到的参数,建立了考虑回灌井补水效应的三维基坑降水效果分析模型,模拟基坑内水位降深与时间的变化关系,并对基坑降水效果进行分析和评估,以期指导土方开挖工程的施工。  相似文献   

7.
长江漫滩地区第四系松散层是一个巨厚的复杂含水体,地下水丰富,对深基坑施工影响极大。详细分析了南京梅子洲过江通道及青奥轴线地下交通系统工程中B2-J1区基坑降水工程的特征,分区分段进行降水设计,并根据各区段的地层特征,选用合适的降水井结构,利用全孔填滤料的方式对开挖面以上含水层进行疏导,取得良好的降水效果;针对坑内、外水位差大的区段设置坑外备用井,防止因围护结构缺陷造成基坑管涌,为基坑安全增加保障,并有效地控制了降水对周边环境破坏。  相似文献   

8.
南通市南山湖综合楼基坑工程降水数值模拟分析   总被引:1,自引:1,他引:0       下载免费PDF全文
殷宝兵  周爱兆  姜彬霖 《探矿工程》2017,44(10):61-65,69
基坑降水的成功与否,关系到整个基坑的安全。南通市南山湖综合楼基坑开挖过程中虽建立了止水帷幕,但仍需对基坑降水的方案进行安全评估。采用MIDAS/GTS数值分析软件建立三维渗流模型,通过对现场单井抽水试验进行模拟分析,综合地勘报告中室内试验渗透系数和抽水试验的渗透系数,反向推演出符合工程实际的渗流边界函数和渗透系数;然后利用反推得到的计算参数,建立三维渗流模型,模拟群井抽水状态下水位降深与时间的变化关系,对群井降水效果进行分析,验证降水井设计是否合理,指导基坑土方的开挖。  相似文献   

9.
崔永高 《工程地质学报》2016,24(6):1207-1213
钻孔灌注桩后压浆后,与坑外含水层相比,基坑范围内含水层的渗透系数减小,这对基坑降水渗流场具有比较明显的影响。某广场式建筑由五幢塔楼和地下车库组成,采用桩侧后压浆钻孔灌注桩,基坑开挖深度21m,承压含水层组厚10m,透水性较强,采用敞开式完整井降水,井位主要沿基坑周边布置。在对水文地质条件进行概化后,建立了地下水三维非稳定流数值模型,进行了非均质渗流场模拟,并与均质渗流场作比较。结果表明,坑内后压浆区域的渗透系数减小后,坑内水力坡度变陡,单井涌水量减小,井数应相应增加;若模型计算域全部按注浆后的渗透系数考虑,则会严重降低补给强度、低估基坑总涌水量;在相同的降深要求下,坑内后压浆后渗透系数减小、但坑外渗透系数不变,基坑总补给量基本没有变化。现场监测与模拟结果较为一致。研究成果对类似工程地下水控制有一定的借鉴意义。  相似文献   

10.
涌漏点的存在使得落底式止水帷幕条件下基坑涌水量的计算成为一个有待解决的技术难题。在承压含水层中开挖落底式深基坑时,针对落底式止水帷幕渗漏的不确定性,建立承压含水层中落底式基坑非完整井降水水文地质模型。基于Theis非完整井非稳定流理论,结合映射原理,推导等效渗透系数计算公式,并提出涌漏系数法用以评价落底式止水帷幕隔渗效果以及计算基坑涌水量。以武汉某深基坑降水工程为例,采用该方法评价止水帷幕的隔渗效果以及对其基坑涌水量进行计算,并与实测结果和传统方法计算结果分别进行对比验证。结果显示涌漏系数法计算误差较小,且计算过程简便,兼具安全性和经济性。研究结果可应用于指导工程设计,具有一定实际应用价值。  相似文献   

11.
胡国超  刘施蕊 《探矿工程》2013,40(10):64-67,73
沈阳华晨宝马新工厂主办公楼工程周边有邻近建筑物,其深基坑工程为坑中坑形式,基坑开挖深度为10.4m,局部开挖深度6.05、7.4m。为了控制变形,采用排桩+旋喷桩止水帷幕作为挡土结构及坑内管井降水方式。通过对支护方案的选择和现场施工结果的分析,为基坑周边存在邻近建筑物、基坑上部存在独立基础的基坑支护的设计与施工提供一定的参考。  相似文献   

12.
深基坑降水中不同的地质模型有限元应用研究   总被引:2,自引:0,他引:2  
王翠英  王家阳 《岩土力学》2007,28(6):1259-1264
分析水-土耦合场相互作用时,将岩土视作弹塑性材料。在非线性本构关系下,考虑渗透作用,得出岩土体有限元方程,建立了基坑降水的三维水-土耦合的数学模型。对基坑降水中不同的地质模型潜水、承压水及有越流补给和实际工程条件井管、过滤管、止水帷幕分别进行了计算处理,并以武汉国际证券大厦降水工程为实例,对其降水过程进行了三维有限元计算。应用三维数值模拟方法,能很好地模拟基坑防渗帷幕、非均质和各向异性、承压-无压等一些解析法难以处理的实际工程条件和地质模型。  相似文献   

13.
基坑工程中,通常采用地下水回灌措施降低降水对周边地质环境产生的不良影响,然而目前基坑降水—回灌的相关设计理论仍处于探索阶段。本文通过引入平面二维流势函数理论和叠加原理,分别求解得到了无止水帷幕工况下潜水完整井和承压完整井在降水—回灌共同作用下的地下水浸润曲线方程;此外,本文通过空间汇点原理和镜像原理分别求得基坑内降水和基坑外回灌对基坑外地下水位的影响,并运用叠加原理得到了有止水帷幕工况下,深基坑降水—回灌作用下的地下水浸润曲线解析式。本文利用得到的解析式探讨了在具有止水帷幕条件下回灌井距基坑围护结构的距离、渗透系数等主要因素对浸润曲线的影响,为基坑降水—回灌设计提供了参考依据。  相似文献   

14.
近年来,落底式止水帷幕(如落底式地下连续墙)在武汉市深基坑工程中广泛使用。许多地铁车站基坑的降水工程中采用了落底式止水帷幕止水+管井降水的思路,取得了较好的工程效果。但在某些换乘车站的建设上,新建地铁车站的降水设计是未考虑既有车站的落底式帷幕的,这种既有帷幕对新建基坑的影响可能无法忽视。本文使用Visual Modflow渗流数值模拟软件,研究了在典型的长江一级阶地水文地质模型基础上建立的8种工况,探讨了既有帷幕对新建基坑的降水影响。研究表明:新建基坑中最大、最小降深均随着既有帷幕和新建基坑的距离的增加而呈现先变大后变小的趋势。  相似文献   

15.
对基坑降水中渗出面产生的机理、影响渗出面高度的因素、渗出面高度的计算、渗出面对基坑工程的危害及采取的措施等进行了详细的论述。工程实践证明,基坑降水工程中渗出面的研究对解决基坑降水中遇到的相关工程问题提供了理论依据。  相似文献   

16.
装配式可回收支护结构为地下空间开发提供了一种经济安全、功能协同、可持续发展的新型绿色支护体系。以郑州市某顶管工作井基坑为背景,基于相似比理论开展了缩尺基坑模型试验,并采用ABAQUS建立能够区分支护系统中刚性构件与柔性构件变形差异的三维流固耦合模型,研究降水开挖过程中支护结构受力和变形特性,分析了降水和开挖对基坑变形发展的影响规律。研究表明:降水开挖过程中,支护结构受力及变形整体均小于设计值,但是钢面板在与支撑连接的位置易出现局部屈服现象;支护结构水平位移增量模式随降水施工和开挖施工的情况不同而差异较大,随着基坑降水开挖的进行,影响支护结构变形的主要因素由基坑降水逐渐向基坑开挖转变;基坑降水对地表沉降的影响较基坑开挖更大,第1级降水期间地表沉降快速增长,沉降增量占比最大达44.6%。  相似文献   

17.
In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to reduce the drawdown and land subsidence outside pits. In dewatering design for confined water, factors including drawdown requirements, the thickness of aquifers, the depth of dewatering wells and the depth of cutoff curtains have to be considered comprehensively and numerical simulations are generally conducted for calculation and analysis. Longyang Road Station on Shanghai Metro Line 18 is taken as the case study subject in this paper, a groundwater seepage model is developed according to the on-site engineering geological conditions and hydrogeological conditions, the excavation depth of the foundation pit as well as the design depth of the enclosure, hydrogeological parameters are determined via the pumping test, and the foundation pit dewatering is simulated by means of the three-dimensional finite difference method, which produces numerical results that consistent with real monitoring data as to the groundwater table. Besides, the drawdown and the land subsidence both inside and outside the pit caused by foundation pit dewatering are calculated and analyzed for various curtain depths. This study reveals that the drawdown and the land subsidence change faster near the curtain with the increase in the curtain depth, and the gradient of drawdown and land subsidence changes dwindles beyond certain depths. In this project, the curtain depth of 47/49 m is adopted, and a drawdown-land subsidence verification test is completed given hanging curtains before the excavation. The result turns out that the real measurements basically match the calculation results from the numerical simulation, and by increasing the depth of curtains, the land subsidence resulting from dewatering is effectively controlled.  相似文献   

18.
深基坑降水与沉降的非线性耦合计算   总被引:11,自引:1,他引:10  
周志芳  朱宏高  陈静  钟建驰  吉林  冯兆祥 《岩土力学》2004,25(12):1984-1988
结合润扬长江公路大桥南锚基坑工程,基于不同水文地质层水流运动特征的差异,对基坑降水过程中的地下水流计算,提出了双层结构数学模型,由此可以同时求出各分层地下水位。在土层降水-固结过程中,考虑到渗透系数和贮水系数随土层物理力学参数的非线性变化,提出了深基坑降水与沉降的非线性耦合计算方法。这为基坑土体变形预测、控制,指导工程施工和设计提供了新的途经。  相似文献   

19.
In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to reduce the drawdown and land subsidence outside pits. In dewatering design for confined water, factors including drawdown requirements, the thickness of aquifers, the depth of dewatering wells and the depth of cutoff curtains have to be considered comprehensively and numerical simulations are generally conducted for calculation and analysis. Longyang Road Station on Shanghai Metro Line 18 is taken as the case study subject in this paper, a groundwater seepage model is developed according to the on-site engineering geological conditions and hydrogeological conditions, the excavation depth of the foundation pit as well as the design depth of the enclosure, hydrogeological parameters are determined via the pumping test, and the foundation pit dewatering is simulated by means of the three-dimensional finite difference method, which produces numerical results that consistent with real monitoring data as to the groundwater table. Besides, the drawdown and the land subsidence both inside and outside the pit caused by foundation pit dewatering are calculated and analyzed for various curtain depths. This study reveals that the drawdown and the land subsidence change faster near the curtain with the increase in the curtain depth, and the gradient of drawdown and land subsidence changes dwindles beyond certain depths. In this project, the curtain depth of 47/49 m is adopted, and a drawdown-land subsidence verification test is completed given hanging curtains before the excavation. The result turns out that the real measurements basically match the calculation results from the numerical simulation, and by increasing the depth of curtains, the land subsidence resulting from dewatering is effectively controlled.  相似文献   

20.
管井降水是一种设备简单、排水效率高的降水方法,在地下工程的施工中有广泛的应用。本文结合拉萨京藏交流中心邻河基坑降水项目的施工实践,参考实际施工效果和实际施工条件,研究邻河基坑管井降水的方案优化,分析降水过程中的重点和难点,增强降水方案的科学性,提高降水效率。  相似文献   