首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Wang  Jianxiu  Liu  Xiaotian  Liu  Shaoli  Zhu  Yanfei  Pan  Weiqiang  Zhou  Jie 《Acta Geotechnica》2019,14(1):141-162

Water level is decreased during foundation pit excavation to avoid water inrush under confined water pressure. Cut-off wall is often used as waterproof curtain to partially cut off the dewatered aquifer. When a foundation pit is located in a built-up area and the underlying confined aquifer is not cut off, the drawdown must be minimized outside the pit to avoid land subsidence in buildings and pipelines. The coupling effect of the cut-off wall and pumping well is used to control the drawdown outside the foundation pit. However, the coupling mechanism is not intuitively well understood because of the limitations of existing experimental methods. In this study, transparent soil was introduced to model the coupling mechanism in the physical model test. High-purity fused silica and mixed paraffin oil were used as skeleton and fluid to simulate the confined aquifer and groundwater. Industrial solid dye and paraffin oil were used as tracers. A camera was used to collect flow information. Tests were performed for the combinations of cut-off wall and partially penetrating pumping wells. The insertion depth ratio of the cut-off wall most effectively influenced the drawdown. The layout of the pumping wells in horizontal direction influenced water level distribution and flow rate. The optimal depth of the pumping wells was 1–5 m above the bottom of the cut-off wall, and the optimal horizontal distance between the cut-off wall and the pumping wells was 25% of the pit width. Non-Darcy flow was observed within the range of 0–10 m around the bottom of the cut-off wall. These results were significant in understanding the cut-off wall and pumping well coupling effect on foundation pit dewatering.

  相似文献   

2.
A whirlpool foundation pit is a small-diameter, deep circular pit. Because of its depth and small diameter, a large drawdown is required, and a limited number of wells can be installed inside the pit. During excavation, partially penetrating wells inside and outside the foundation pit have to be installed to lower the water level when the aquifer is too thick. However, partially penetrating wells near partially penetrating curtains cannot be treated by analytical methods. Therefore, it is necessary to use numerical methods to predict dewatering during excavation. Field experiments were performed on whirlpool foundation pit 1880 of Baosteel Group, Shanghai, China, to obtain pumping rates and drawdown, pumping with a single well and two wells in the confined aquifer. The results indicate that the drawdown inside the pit induced by pumping wells outside the foundation pit was small, whereas it was large for pumping wells inside the pit. The pumping wells inside and outside the pit had to be combined to lower the water level. A three-dimensional numerical model was developed to simulate the dewatering process. The hydraulic conductivities of the confined aquifers were inversed by using the pumping tests. Operation schedules were simulated with the corrected model for different combinations of wells inside and outside the pit. The results suggest that different schedules and operation conditions affect drawdown. The monitored results during dewatering indicate that the simulation and field measurements were in agreement. The results can be applied to similar situations.  相似文献   

3.
承压水降压引起的地面沉降由含水层、弱透水层和潜水层的变形组成。当承压层降压时间短、弱透水层固结变形较小时,可以假设弱透水层为严格的隔水层。采用层状弹性体系理论,基于位移协调条件分别建立了单井抽水以及第三类基坑工程降水(隔水帷幕插入降水含水层)引起的土层变形分析模型,与数值模拟和现场抽水试验结果的对比,验证了文中方法的正确性。研究结果表明,上覆土层弹性参数变化对地表变形的影响可以忽略;抽水井附近的土层变形呈现“上小下大”特点,一定距离以外含水层与地面沉降大致相等,根据承压含水层降深要求,可估算出基坑外的水位降深。  相似文献   

4.
长江三角洲分布有巨厚、松散的第四纪沉积层,地下含水系统为一复合含水层系统,深基坑降水一般采用非完整井,且由于深基坑周围连续挡水墙难以深入含水层底板,所以其地下水渗流场变化极其复杂,具有明显的三维流特征。本文以上海环球金融中心深基坑降水为例,采用数值模拟方法,模拟了在多层含水层复合存在、含水层最深底板埋深达149m、基坑周围挡水连续墙埋深达34m、基坑内地下水位降深达26m的情况下的地下水三维渗流场特征,并以此为据确定出了该基坑降水的最优化方案。  相似文献   

5.
Based on analyses of the theories of groundwater unsteady flow in deep well dewatering in the deep foundation pit,Theis equations are chosen to calculate and analyze the relationship between wa-ter level drawdown of confined aquifer and dewatering duration.In order to reduce engineering cost and diminish detrimental effect on ambient surrounding,optimization design target function based on the control of confined water drawdown and four restriction requisitions based on the control of safe water level,resistance to throwing up from the bottom of foundation pit,avoiding excessively great subsidence and unequal surface subsidence are proposed.Adeep well dewatering project in the deep foundation pit is optimally designed.The calculated results including confined water level drawdown and surface subsid-ence are in close agreement with the measured results,and the optimization design can effectively control both surface subsidence outside foundation pit and unequal subsidence as a result of dewatering.  相似文献   

6.
In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to reduce the drawdown and land subsidence outside pits. In dewatering design for confined water, factors including drawdown requirements, the thickness of aquifers, the depth of dewatering wells and the depth of cutoff curtains have to be considered comprehensively and numerical simulations are generally conducted for calculation and analysis. Longyang Road Station on Shanghai Metro Line 18 is taken as the case study subject in this paper, a groundwater seepage model is developed according to the on-site engineering geological conditions and hydrogeological conditions, the excavation depth of the foundation pit as well as the design depth of the enclosure, hydrogeological parameters are determined via the pumping test, and the foundation pit dewatering is simulated by means of the three-dimensional finite difference method, which produces numerical results that consistent with real monitoring data as to the groundwater table. Besides, the drawdown and the land subsidence both inside and outside the pit caused by foundation pit dewatering are calculated and analyzed for various curtain depths. This study reveals that the drawdown and the land subsidence change faster near the curtain with the increase in the curtain depth, and the gradient of drawdown and land subsidence changes dwindles beyond certain depths. In this project, the curtain depth of 47/49 m is adopted, and a drawdown-land subsidence verification test is completed given hanging curtains before the excavation. The result turns out that the real measurements basically match the calculation results from the numerical simulation, and by increasing the depth of curtains, the land subsidence resulting from dewatering is effectively controlled.  相似文献   

7.
In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to reduce the drawdown and land subsidence outside pits. In dewatering design for confined water, factors including drawdown requirements, the thickness of aquifers, the depth of dewatering wells and the depth of cutoff curtains have to be considered comprehensively and numerical simulations are generally conducted for calculation and analysis. Longyang Road Station on Shanghai Metro Line 18 is taken as the case study subject in this paper, a groundwater seepage model is developed according to the on-site engineering geological conditions and hydrogeological conditions, the excavation depth of the foundation pit as well as the design depth of the enclosure, hydrogeological parameters are determined via the pumping test, and the foundation pit dewatering is simulated by means of the three-dimensional finite difference method, which produces numerical results that consistent with real monitoring data as to the groundwater table. Besides, the drawdown and the land subsidence both inside and outside the pit caused by foundation pit dewatering are calculated and analyzed for various curtain depths. This study reveals that the drawdown and the land subsidence change faster near the curtain with the increase in the curtain depth, and the gradient of drawdown and land subsidence changes dwindles beyond certain depths. In this project, the curtain depth of 47/49 m is adopted, and a drawdown-land subsidence verification test is completed given hanging curtains before the excavation. The result turns out that the real measurements basically match the calculation results from the numerical simulation, and by increasing the depth of curtains, the land subsidence resulting from dewatering is effectively controlled.  相似文献   

8.
深厚强透水含水层超大基坑降水群井效应研究   总被引:1,自引:0,他引:1  
基坑减压降水的幅度与群井效应密切相关。某超大面积基坑,含水层组厚40m,中下部透水性强,采用非完整井降水。对水文地质条件概化,建立了地下水三维非稳定流数值模型,对均匀布置群井、不均匀布置群井、分块开挖降水、不同的井结构、布设回灌井等工况,进行了渗流场模拟。研究表明,强透水性含水层超大面积基坑降水的群井效应极为明显;井位角密中疏布置,可实现降深调平,避免降深不足和超降;基坑分块降水,可减少坑外降深;短滤管井结构可减少基坑总涌水量和坑外降深;强透水性含水层可灌性强,回灌对减少坑外水位下降有较明显的效果。模拟结果与现场监测较为一致。研究成果可为类似工程地下水控制设计提供参考。  相似文献   

9.
In this paper, fist-order reliability method (FORM) is used to evaluate the impacts of uncertainties posed by traditional deterministic models on the environment in Jining, China. Because of groundwater contamination in shallow aquifer, and an increase in water demand, the new wells target the confined aquifer with constant pumping rate of 5,000 m3/d. Using Theis equation, the groundwater drawdown is analyzed to determine whether the confined aquifer will be contaminated. Although the piezometric level is higher than the phreatic level by 11.0 m, the risk of drawdown is still 19.49% when the pumping rate of 5,000 m3/d is maintained for 2 years. The deterministic model indicates a drawdown of 8.94 m which is lower than the maximum tolerance drawdown of 11.0 m. The sensitivity and uncertainty analysis reveal that the model result is more sensitive to transmissivity than specific yield, while the reliability analysis offers significant information for the decision makers. This approach exposes and minimizes the risk of undesirable consequences such as groundwater contamination.  相似文献   

10.
位于上海浦东地区的越江隧道顶管工作井施工基坑距黄浦江防风墙45m,距煤气公司煤气井仪表室1.20m。基坑开挖底界(深度32.45m)为场地内第⑦土层承压含水层顶部(静止水位-6.40m)。为保证基坑施工及临近建筑物的安全,避免基坑降水造成砂土流失而引起的地面沉降问题,在降水井的施工中,根据含水介质的颗粒级配选择相应规格的过滤砂作为过滤层填料,并保证过滤层具有一定的厚度,使降水时的含砂量控制在1/10万以下;采用非稳定流控制水位跟踪作业降水法,尽量减少基坑降水的影响范围,取得了良好的预期效果。  相似文献   

11.
Numerical study of dewatering in a large deep foundation pit   总被引:2,自引:1,他引:1  
During foundation pit excavation, groundwater is often the most important factor that affects pit stability. Dewatering is widely used in pit excavation to avoid uplift of excavation floors due to high water pressure. The characteristics of seepage in small-scale deep foundation pits of high-rise buildings or in the long narrow foundation pits of subway stations have been extensively investigated. However, the characteristics of seepage in large-scale deep excavations have not been studied. This paper investigates the large deep excavation of the buildings in Oriental Fisherman’s Wharf. The total area of the construction site is 33,917 m2. Single-well and group-well field pumping tests were performed and a numerical simulation by 3D finite difference method (FDM) was carried out. The simulation used results from the field pumping tests. The permeability parameters of the confined aquifer were then revised, based upon comparisons of simulation and observation results. Subsequently, dewatering schemes were simulated by FDM forward analysis. The simulation results show that dewatering schemes can minimize seepage and uplift in large excavation pits, though settlement outside the pit may need treatment measures.  相似文献   

12.
介绍了在水源补给充分、水位降深较大的基坑施工中,采用密集井点小泵量连续抽水控制地下水位,使降水漏斗曲面平缓,减小基坑周围地面沉降的风险的方法,以及取得的良好的降水效果。  相似文献   

13.
When pumping is conducted in confined aquifer inside excavation pit(waterproof curtain),the direction of the groundwater seepage outside the excavation changes from horizontal to vertical owing to the existence of the curtain barrier.There is no analytical calculation method for the groundwater head distribution induced by dewatering inside excavation.This paper first analyses the mechanism of the blocking effects from a close barrier in confined aquifer.Then,a simple equation based on analytical solution is proposed to calculate groundwater heads inside and outside of the excavation pit with waterproof curtain(hereafter refer to close barrier)in a confined aquifer.The distribution of groundwater head is derived according to two conditions:(i)pumping with a constant water head,and(ii)pumping with a constant flow rate.The proposed calculation equation is verified by both numerical simulation and experimental results.The comparisons demonstrate that the proposed model can be applied in engineering practice of excavation.  相似文献   

14.
This paper discusses the geological and hydrogeological features of Quaternary deposits in Tianjin as well as the geohazards related to groundwater hydrology in this region. The soft soil deposits, comprising silt, sand, silty clay and clay, are composed of four aquifer groups. In the first aquifer group, one phreatic aquifer and two confined aquifers have relationships with underground construction in the urban area. These three aquifers are separated by two aquitards and collectively form a multi-aquifer system. During geotechnical construction, potential geohazards present are related to the groundwater, which include water-in-rushing, quicksand and piping hazards. To prevent the aforementioned geohazards, dewatering is conducted; however, groundwater pumping may result in large settlements of the surrounding ground. To reduce pumping-induced settlement, the dewatering–waterproofing system has been adopted. According to the characteristics of the subsoil, excavation depth and the surrounding environment, the dewatering system can be divided into five patterns. In the first four patterns, when pumping is conducted in the excavation pit, the groundwater head in the adjacent aquifers outside the pit decreases due to the leakage effect of the aquitards located between the aquifers. In the fifth pattern, waterproof curtain has cut off the aquifers completely and dewatering in the pit cannot result in settlement around excavation pit. To avoid geohazards related to groundwater hydrology, countermeasures recommended include construction of an effective waterproof curtain, selection of a reasonable excavation dewatering pattern and withdrawal of required groundwater.  相似文献   

15.
Foundation dewatering has become a major cause of land subsidence in Shanghai. The burial depth of foundations in relation to geotechnical construction works is less than 75 m, and the corresponding groundwater includes phreatic, low-pressure artesian, and the first confined aquifers. Based on the geological and hydrogeological conditions beneath Shanghai, methods of dewatering may be divided into three modes and further five patterns according to the insertion depth of the dewatering-retaining system. The most common dewatering mode aims to reduce the water pressure in the confined aquifer by setting the dewatering wells inside the pit, whilst the retaining walls are buried in the confined aquifer and partially cut off the confined aquifer layer. To predict the settlement due to foundation dewatering, numerical models are generally adopted, which are similar to those used to predict land subsidence induced by regional groundwater withdrawal; however, since foundation dewatering is conducted along with the setting of retaining walls and foundation pit excavation, which differs from regional groundwater withdrawal, interactions between the retaining wall-dewatering well, the dewatering-excavation, and dewatering-recharge are important factors affecting the analytical model. Since the grading of the shallow soil layers is different, stratified settlement characteristics of the shallow soil strata and seepage erosion, which results in additional deformation, need to be given particular consideration.  相似文献   

16.
某深大基坑位于长江下游岸边,场地地层为典型的二元结构,基坑开挖涉及的两层承压含水层间的弱透水层局部缺失,之间水力联系密切,基坑场地地质条件极为复杂,基坑施工降水直接关系到基坑工程的安全。这里将基坑分3个区,分别进行降水设计。具体降水方案:Ⅰ区两层承压含水层和Ⅱ区第一承压含水层被围护结构隔断内外水力联系,采用疏干井降水;Ⅱ区第二承压含水层未被围护结构隔断,Ⅲ区两层承压含水层水力联系密切,针对这两个区域设计了两套降水方案,方案一在Ⅱ区和Ⅲ区均布置有降水井,在Ⅱ区对第二承压含水层降水,在Ⅲ区对第一承压含水层降水;方案二仅在Ⅲ区布置降水井对第一承压含水层降水。为了更好地对降水方案进行对比分析,验证方案的可行性,对此进行了数值模拟分析,计算结果显示,两种方案均能满足降水要求,不过方案二布井数量少,基坑外水位降深较小,对周边环境影响更小,优于方案一。  相似文献   

17.
国家大剧院深基坑地下水控制设计及施工技术   总被引:3,自引:0,他引:3  
国家大剧院基坑地下水控制是大剧院工程的三大难题之一,也是专家们讨论的焦点。经过水文地质试验和充分论证,确定了地下水控制方案和施工方法,即采用反循环成井工艺施工引渗井,将上层滞水和潜水引渗到第一层承压含水层中消纳,保证第一步基坑开挖至-15 7m;在-15 7m位置采用连续墙阻隔第一层承压水,并使用旋挖钻机在槽内施工降水井,疏干槽内承压含水层并进行越流补给控制,保证基坑开挖至-26m;在歌剧院台仓局部加深部份(-32 5m),采用封闭布设减压井,解决基坑开挖和台仓地下结构施工时基坑突涌的问题;最后采用特殊的封井技术,将井管内高于槽底约10m的承压水头封堵在槽底以下0 5m,安全截断井管,保证了基础施工。  相似文献   

18.
杜魁  余小国  岳丽娜  李超 《探矿工程》2015,42(12):28-33
以武汉钰龙金融广场超深基坑工程为实例,在结合常用的深基坑设计方案的基础上分别从基坑总体设计方案选定、基坑围护体系选定和设计、支撑体系选定、基坑降水选定、土方开挖方案选型和换撑方案的选定等方面进行探讨,并确定最终的基坑工程设计方案选型,即地下连续墙围护+3道内支撑+管井降水处理承压水的支护方案。  相似文献   

19.
刘伍  赵云峰  程剑 《城市地质》2007,2(3):43-47
地铁工程施工不论是明挖、还是暗挖,从开挖的安全性及防水措施等方面,对地质均提出了非常严格的要求,地铁工程一般埋深较大,尤其在水文地质、工程地质条件较复杂的条件下,单一、简单的降水方法很难较好的满足地铁工程施工对地下水控制的要求。因此,需要考虑将不同种的单一降水方法中的优势技术进行合理叠加,尝试复合降水技术,能使地铁工程降水效果达到疏干充分、消除或有效控制含水层底界滞留水渗漏,避免拱顶因地下水渗漏造成冒顶、侧壁地下水渗漏造成坍塌,保障正常施工。  相似文献   

20.
长江漫滩地区第四系松散层是一个巨厚的复杂含水体,地下水丰富,对深基坑施工影响极大。详细分析了南京梅子洲过江通道及青奥轴线地下交通系统工程中B2-J1区基坑降水工程的特征,分区分段进行降水设计,并根据各区段的地层特征,选用合适的降水井结构,利用全孔填滤料的方式对开挖面以上含水层进行疏导,取得良好的降水效果;针对坑内、外水位差大的区段设置坑外备用井,防止因围护结构缺陷造成基坑管涌,为基坑安全增加保障,并有效地控制了降水对周边环境破坏。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号