共查询到20条相似文献,搜索用时 0 毫秒
1.
Landslide dams in mountainous areas are quite common. Typically, intense rainfalls can induce upstream flows along the sloping channel, which greatly affects the stability and failure modes of landslide dams. If a series of landslide dams are sequentially collapsed by an incoming mountain torrent (induced by intense rainfall), large debris flows can be formed in a short period of time. This also amplifies the magnitude of the debris flows along the flow direction. The catastrophic debris flows, which occurred in Zhouqu, China on August 8, 2010, were indeed caused by intense rainfall and the upstream cascading failure of landslide dams along the gullies. Experimental tests were conducted in a sloping channel to understand the dynamic process of cascading landslide dam failures and their effect on flow scale amplification. Similar to the Zhouqu conditions, the modeled landslide dams were distributed along a sloping channel and breached by different upstream flows. For each experiment, the front flows were sampled, the entrained grain sizes were analyzed, and the front discharge along the channel was measured. The results of these experiments show that landslide dams occurring along the channel can be destroyed by both high and low discharge flows, although the mechanisms are quite different for the two flow types. Regardless of flow type, the magnitude of the flows significantly increases after a cascading failure of landslide dams, resulting in an increase in both the diameter and the entrained coarse particles percentage. 相似文献
2.
以新疆大石峡250 m级特高面板砂砾石坝为依托工程,采用大型接触面直剪试验确定了筑坝料与基岩的摩擦接触参数,建立了考虑坝体与坝基相互接触作用的面板坝三维数值模型,研究了摩擦接触效应对坝体、混凝土面板应力变形以及止水接缝三向变位的影响。结果表明:双曲线模型符合筑坝料与基岩之间剪应力与位移的非线性关系;若不考虑坝体与基岩的接触效应,坝体边界处变形梯度和主应力值计算值均偏小,导致判断该区域坝体开裂区范围偏小而拱效应被高估;蓄水期面板挠度和顺坡向应力受接触效应影响相对较小,而轴向位移和轴向应力受接触效应影响较大;周边缝变位受接触效应影响非常强烈,在高水头压力作用下,坝体局部可能出现相对基岩的滑移导致周边止水变形和坝肩竖缝张开量大幅增加。陡峻河谷筑坝若不考虑接触效应,计算结果是偏危险的。计算结果和Anchicaya 坝实测渗漏位置结果均表明,周边缝变位控制是陡峻河谷面板坝建设的关键。 相似文献
3.
滑坡堵江坝溃决洪水及其演进的理论分析 总被引:1,自引:0,他引:1
崩滑堵江事件在世界范围内,尤其在山区广泛存在.溃坝后形成的洪水异常凶猛,洪峰高达几米至几十米,演进过程中常造成下游严重灾害.因此,崩滑堵江事件及其灾害链已严重影响人类的工程经济活动.本文对溃决洪水流量、洪峰及其演进过程进行了理论分析,建立了一套预测溃坝洪水特征的计算公式,并用实例验证,取得了较好的效果. 相似文献
4.
5.
The breach of landslide dam often causes significant disaster in the inundated area; the prediction of breach hydrograph is in high demand for the dam breach risk evaluation. In this study, according to the model tests and Tangjiashan landslide dam breach case, the surface erosion accompanied by intermittent mass failure is known as the key breaching mechanism for landslide dam due to overtopping failure. The downstream slope angle would gradually decrease during the dam-breaching process, whereas a planar wedge failure occurs when the breach slopes at the dam crest and downstream breach channel fail. Based on the breach mechanism, a numerical model for landslide dam breach due to overtopping is developed to simulate the coupling process of water and soil. The model focuses on the breach morphology evolution during the breaching for the sake of the improvement of breach hydrograph prediction. Furthermore, the model can handle one- and two-sided breach, as well as incomplete and base erosion at the vertical direction. The case study of Tangjiashan landslide dam-breaching feedback analysis testifies the rationality of the present model with the relative errors less than 10% for peak discharge, final breach widths, and time to peak. The sensitivity analysis indicates that the final breach depth and soil erodibility affect the breach flow prediction of the landslide dam significantly, whereas the one- or two-sided breach mode is less sensitive. 相似文献
6.
试论疏排水在红层地区滑坡治理中的重要作用 总被引:4,自引:0,他引:4
红层岩土工程地质特性已为工程界所重视。由于其具有遇水软化及低强度的特性,水活动对边坡变形破坏具有重要的促进作用。论文通过对红层岩土工程地质特征和物理力学性质的分析研究,介绍了红层边坡变形破坏特征,论述了地表渗水和地下水活动对红层边坡变形破坏及稳定性的影响。并且通过工程实例分析了疏排水在红层边坡、滑坡治理中的重要作用,提出进行有效的疏排水是对红层边坡、滑坡治理加固的重要手段。 相似文献
7.
Formation and failure of the Tsatichhu landslide dam, Bhutan 总被引:1,自引:1,他引:1
At 00:30 (local time) on the 10th September 2003 a joint and foliation defined wedge of material with an estimated volume of 7–12×106 m3 slid into the narrow Tsatichhu River Valley, in Jarrey Geog, Lhuentse, eastern Bhutan. The Tsatichhu River, a north–easterly flowing tributary of the Kurichuu River, was completely blocked by the landslide. During its movement, the landslide transitioned into a rock avalanche that travelled 580 m across the valley before colliding with the opposite valley wall. The flow then moved down valley, travelling a total distance of some 700 m. The rock avalanche was accompanied by an intense wind blast that caused substantial damage to the heavily forested valley slopes. The resulting geomorphologically-typical rock-avalanche dam deposit created a dam that impounded a water volume of 4–7×106 m3 at lake full level. This lake was released by catastrophic collapse of the landslide, which occurred at 16:20 (local time) on 10th July 2004, after reported smaller failures of the saturated downstream face. The dam failure released a flood wave that had a peak discharge of 5900 m3 s−1 at the Kurichhu Hydropower Plant 35 km downstream. 相似文献
8.
<正>The Tsaoling rock-and-soil avalanche is the largest landslides triggered by the Chi-Chi earthquake(Taiwan,1999).In addition,because of the periodic reoccurrence of gigantic slides since 19 century,instruments installed and aerial photo scans regularly around the Tsaoling area.Besides of massive field observations,several periods of Digital Terrain Models(DTMs) generated by aerial photos sets have also been deployed to investigate and calculate the coseismic and post-seismic morphological changes. 相似文献
9.
以雅砻江卡拉水电站为例,针对滑坡群风险在水电工程坝址比选时的量化评价问题,在考虑滑坡体危险性分析和易损性分析的基础上,引入滑坡体工程影响系数、重要性系数、距离模数、滑坡体状况系数4个指标参数,综合考虑滑坡体客观情况与人类活动的影响,建立以年期望损失为指标的水电工程滑坡风险评价体系。在以坝址安全风险指标、堵江引起发电量损失指标与清淤损失指标和涌浪破坏损失指标为标准的综合评价方法中,运用安全与经济相平衡原则,得出基于滑坡风险评价的坝址比选结果。经实例计算,采用改进后的评价方法可得同一量纲下的计算分析比常规方法更具可比性,综合考虑可为坝址比选提供依据。 相似文献
10.
In this work, a two-dimensional fourth-order Boussinesq-type numerical model is applied to estimate the impact of landslide-generated
waves in dam reservoirs. This numerical model has recently been extended for simulating subaerial landslides. The extended
model is validated using available three-dimensional experimental data, and a good agreement is obtained. The numerical model
is then employed to investigate the impact of landslide-generated waves in two real cases, the Maku and Shafa-Roud dam reservoirs
in the northwestern and the north of Iran, respectively. Generated wave heights, wave run-up, maximum wave height above dam
crest, and dam overtopping volume have been estimated for each case. The amplitude of generated waves about 18 and 31 m and
the volume of dam overtopping up to 80,000 m3 emphasize the importance of the estimation of the landslide-generated waves in dam sites. 相似文献
11.
12.
Corrado Cencetti Andrea Fredduzzi Ivan Marchesini Mara Naccini Paolo Tacconi 《Computational Geosciences》2006,10(2):201-219
The analysis of the flood hazard related to the areas downstream of landslide dams is one of the most interesting aspects
of studying the formation and the failure of natural dams. The BREACH code [14], simulating the collapse of earthen dams, both man-made and naturally formed by a landslide, was chosen in order to analyse
the case of the Valderchia landslide (central Italy). The bed-load transport formula used in BREACH (Meyer-Peter and Muller,
modified by Smart [27]) is based on flume experiments with well-sorted sediments. Such a methodology probably makes this equation not very suitable
for describing the sediment transport peculiar to a landslide body presenting a very poor material sorting. The Schoklitsch
[26] formula was implemented into the programme as an alternative to the Smart equation. However, because the landslide deposits
may often have a strongly bimodal grain–size frequency curve, the percentile D
50 (the typical granulometric parameter requested by bed-load sediment transport formulas) can sometimes correspond to one of
the grain-size classes which are really present to a lesser degree. To consider this phenomenon, the BREACH programme (version
7/88-1) was implemented with a new procedure that calculates two granulometric curves, one for each mode of the original distribution,
and evaluates transport of the landslide material separately. Results of the analysis show that the model is very sensitive
to the bed-load equation and that the procedure implemented to consider the eventual bimodal distribution of the dam material
simulates the armouring phenomenon (which can stop the erosion of the dam during the overtopping phase). 相似文献
13.
14.
泥石流V型排导槽防治理论及应用研究 总被引:1,自引:0,他引:1
泥石流是造成云南省直接经济损失最高的地质灾害。云南省在防治泥石流方面总结出一套“稳、拦、排、截”等工程和植物措施相结合的综合治理办法,V型槽属排导措施中的一种。在云南31条泥石流防治工程实验与实践中,突破泥石流排导最小纵坡和槽型最小曲线半径的理论限制,创造了在部分沟段排导槽最小纵坡3‰、最小曲线半径仅为槽宽的3倍仍能顺畅排导泥石流的效果,改善了纵坡连接代数差的范围,认识到平面曲线段(弯道拐点)和纵坡变坡点不能叠加的问题,发展了复式V型槽。 相似文献
15.
16.
Jia-Jyun Dong Yu-Hsiang Tung Chien-Chih Chen Jyh-Jong Liao Yii-Wen Pan 《Engineering Geology》2011,117(1-2):52-61
Landslides may obstruct river flow and result in landslide dams; they occur in many regions of the world. The formation and disappearance of natural lakes involve a complex earth–surface process. According to the lessons learned from many historical cases, landslide dams usually break down rapidly soon after the formation of the lake. Regarding hazard mitigation, prompt evaluation of the stability of the landslide dam is crucial. Based on a Japanese dataset, this study utilized the logistic regression method and the jack-knife technique to identify the important geomorphic variables, including peak flow (or catchment area), dam height, width and length in sequence, affecting the stability of landslide dams. The resulting high overall prediction power demonstrates the robustness of the proposed logistic regression models. Accordingly, the failure probability of a landslide dam can also be evaluated based on this approach. Ten landslide dams (formed after the 1999 Chi-Chi Earthquake, the 2008 Wenchuan Earthquake and 2009 Typhoon Morakot) with complete dam geometry records were adopted as examples of evaluating the failure probability. The stable Tsao-Ling landslide dam, which was induced by the Chi-Chi earthquake, has a failure probability of 27.68% using a model incorporating the catchment area and dam geometry. On the contrary, the Tangjiashan landslide dam, which was artificially breached soon after its formation during the Wenchuan earthquake, has a failure probability as high as 99.54%. Typhoon Morakot induced the Siaolin landslide dam, which was breached within one hour after its formation and has a failure probability of 71.09%. Notably, the failure probability of the earthquake induced cases is reduced if the catchment area in the prediction model is replaced by the peak flow of the dammed stream for these cases. In contrast, the predicted failure probability of the heavy rainfall-induced case increases if the high flow rate of the dammed stream is incorporated into the prediction model. Consequently, it is suggested that the prediction model using the peak flow as causative factor should be used to evaluate the stability of a landslide dam if the peak flow is available. Together with an estimation of the impact of an outburst flood from a landslide-dammed lake, the failure probability of the landslide dam predicted by the proposed logistic regression model could be useful for evaluating the related risk. 相似文献
17.
18.
19.
万塘滑坡是湖北省秭归县香溪河右岸受库水位变动影响的土质滑坡,拟采用抗滑桩进行治理,迫切需要对治理效果进行预测评价。以万塘滑坡地质结构特征、形成机制为基础,采用极限平衡法、FLAC3D显式有限差分法、ABAQUS有限元法相结合,分别从滑坡治理前后稳定性系数变化、剩余推力大小、应力应变分布特征、塑性区变化、抗滑桩桩身结构受力条件5个方面对滑坡治理效果进行评价。研究结果显示,滑坡经治理后不但局部稳定性得到改善,整体稳定性也能满足规范要求。计算结果不但为自然条件下滑坡稳定性分析提供了参考,还为滑坡治理工程效果评价提供了依据,并对施工后布置监测工作有指导意义。 相似文献
20.
基于地质力学模型试验的锦屏拱坝坝肩加固效果研究 总被引:2,自引:0,他引:2
锦屏一级高拱坝最大坝高305 m,是目前在建的世界最高拱坝,其坝址区地质条件复杂,存在断层、蚀变岩脉、层间挤压带、节理裂隙及深部裂缝等各类软弱结构面,坝与地基的整体稳定问题突出。为使坝体达到良好的受力状态,满足拱座的抗滑稳定与变形稳定等要求,工程上采取了大量的加固措施,主要有左坝肩垫座、左右坝肩混凝土网格洞塞置换、刻槽置换、传力洞等。加固处理后,坝肩的整体稳定性以及坝肩坝基的加固效果如何是工程上关心的重要问题。采用两个三维地质力学模型,分别开展了锦屏一级高拱坝在地基未加固和加固两个方案下的坝肩稳定综合法破坏试验研究,对比分析了两个方案下坝与地基的变形分布特性、坝肩坝基失稳的破坏机制和整体稳定安全度。结果表明:坝肩坝基加固处理后,坝体及左、右两岸坝肩变位的对称性得到明显改善,变位量值减小;在相同的超载倍数下,加固方案下两坝肩开裂破坏的范围减小,破坏程度减轻,坝肩破坏失稳的超载系数增大,超载能力得到提高;未加固方案拱坝整体稳定综合法试验安全系数为4.7 ~ 5.0,加固方案下安全系数为5.2 ~ 6.0,安全度得到明显提高。综合分析认为,锦屏拱坝采用以坝肩垫座、混凝土网格置换洞塞、刻槽置换、传力洞等为主的加固方案对坝肩坝基起到了良好的加固效果。 相似文献