首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
《国际泥沙研究》2022,37(5):687-700
Globally, between 1950 and 2011 nearly 80,000 debris flow fatalities occurred in densely populated regions in mountainous terrain. Mitigation of these hazards includes the construction of check dams, which limit coarse sediment transport and in the European Alps number in the 100,000s. Check dam functionality depends on periodic, costly maintenance, but maintenance is not always possible and check dams often fail. As such, there is a need to quantify the long-term (10–100 years) geomorphic response of rivers to check dam failures. Here, for the first time, a landscape evolution model (CAESAR-Lisflood) driven by a weather generator is used to replicate check dam failures due to the lack of maintenance, check dam age, and flood occurrence. The model is applied to the Guerbe River, Switzerland, a pre-Alpine catchment containing 73 check dams that undergo simulated failure. Also presented is a novel method to calibrate CAESAR-Lisflood's hydrological component on this ungauged catchment. Using 100-year scenarios of check dam failure, the model indicates that check dam failures can produce 8 m of channel erosion and a 322% increase in sediment yield. The model suggests that after check dam failure, channel erosion is the remobilization of deposits accumulated behind check dams, and, after a single check dam failure channel equilibrium occurs in five years, but after many check dam failures channel equilibrium may not occur until 15 years. Overall, these findings support the continued maintenance of check dams.  相似文献   

2.
The determination of sediment yield in catchments based on the sediment trapped by check dams is becoming a subject of interest.In fact,several methods have been developed in recent years to estimate the sediment retained by check dams.The complexity,precision and accuracy of each method vary greatly.In this study,we evaluate the sediment trapped by check dams comparing the Sections method respect to the Prism,Pyramid,DTMs and Trapezoid methods.We analyzed a sample of 25 check dams(α-1=90%;ε=10%) in the Saldana badlands(Spain).The results showed that the Sections method offered a volume of retained sediment between the others,which gave an absolute variation from 22%to40%.The high variability of the check dam and sediment wedge sizes made necessary to compare methods in groups combining both characteristics.No significant differences in sediment volumes could be found between the methods for very small(height(h):1.8-2.3 m;trapped volume(V):6-102 m~3) or large check dams(h 2.3 m;V:165-387 m~3),while significant differences are found for small(h 1.5 m;V:1-229 m~3) or middle-sized check dams(h:2.2-3.2 m;V:65-235 m3).Nevertheless,volume differences between groups ranged up to + 25%.For these reason,the size of the check dam,the shape of the sediment wedge and the accuracy of the measure methods must considered when selecting an appropriate method to obtain the volume of retained sediment by check dams.A correct estimation of the sediment retention is needed to evaluate the role and efficiency of check dams in restoration projects or to estimate sediment yields.  相似文献   

3.
Severe soil erosion occurs on the Loess Plateau in China, which makes the Yellow River the most sediment-laden river in the world. Construction of about 60,000 sediment check dams has remarkably controlled soil erosion on the Loess Plateau and reduced the sediment load of the middle and lower Yellow River. Nonetheless, little is known about the mechanism of erosion control and vegetation development of sediment check dams. The function of a single check dam mainly is trapping sediment, while the function of a train of check dams comprising dozens of or over hundreds of check dams in a gully encompasses controlling bed incision and reducing erosion energy. A formula was proposed to calculate the potential energy of bank failure and slope failure in a gully, which essentially constitutes the erosion energy. The erosion energy increases when gully incision occurs, which is induced by the incision of the Yellow River and its tributaries on the Loess Plateau. Sediment deposition in many gullies due to construction of check dams reduces the erosion energy to almost zero, which in turn greatly reduces soil erosion and sediment yield. Construction of check dams promotes vegetation development. The vegetation-erosion dynamics model was used to study the effect of check dams on vegetation development. Simulation results show that reforestation without check dam construction might result in an increase of vegetation cover in the first ten years and then a drop of vegetation cover to less than 10% in the later years. The check dams provide a foundation for vegetation development.  相似文献   

4.
Dam overtopping risk assessment considering inspection program   总被引:3,自引:2,他引:1  
Safety inspection of large dams in Taiwan is conducted every 5 years. The practice does not take into consideration uncertainty of dam conditions. The goal of this study is to determine the optimal dam inspection interval under the consideration of overtopping risk incorporating uncertainty gate availability. In earlier studies, assessment of overtopping risk only considered the uncertainties in reservoir properties and natural randomness of hydrologic events without giving much thought to the availability of spillway gates. As a result, the overtopping risk could be underestimated. In this study, an innovative concept is proposed to evaluate dam overtopping by taking into account spillway gate availability. The framework consists of three parts: (1) evaluation of conditional overtopping risk for different numbers of malfunctioning spillway gates; (2) evaluation of spillway gate availability; and (3) dam inspection scheduling. Furthermore, considerations are given to overtopping risk, inspection cost, and dam break cost for determining the optimal inspection schedule. The methodology is applied to the Shihmen Reservoir in Taiwan and to evaluate its time-dependent overtopping risk. Results show that overtopping risk considering the availability of the spillway gates is higher than the one without considering the availability of the spillway gates.  相似文献   

5.
Dynamic response of dams is significantly influenced by foundation stiffness and dam-foundation interaction. This in turn, significantly effects the generation of hydrodynamic pressures on upstream face of a concrete dam due to inertia of reservoir water. This paper aims at investigating the dynamic response of dams on soil foundation using dynamic centrifuge modelling technique. From a series of centrifuge tests performed on model dams with varying stiffness and foundation conditions, significant co-relation was observed between the dynamic response of dams and the hydrodynamic pressures developed on their upstream faces. The vertical bearing pressures exerted by the concrete dam during shaking were measured using miniature earth pressure cells. These reveal the dynamic changes of earth pressures and changes in rocking behaviour of the concrete dam as the earthquake loading progresses. Pore water pressures were measured below the dam and in the free-field below the reservoir. Analysis of this data provides insights into the cyclic shear stresses and strains generated below concrete dams during earthquakes. In addition, the sliding and rocking movement of the dam and its settlement into the soil below are discussed.  相似文献   

6.
In Mediterranean semi‐arid conditions, the availability of studies monitoring channel adjustments as a response to reforestation and check dams over representative observation periods, could help develop new management strategies. This investigation is an integrated approach assessing the adjustments of channel morphology in a typical torrent of southern Italy after land‐use changes and check dam construction across a period of about 60 years. A statistical analysis of historical rainfall records, an analysis of land‐use changes in the catchment area and a geomorphological mapping of channel adjustments were carried out and combined with field surveys of bed surface grain‐size over a 5‐km reach including 14 check dams. The analysis of the historical rainfall records showed a slight decrease in the amount and erosivity of precipitation. Mapping of land‐use changes highlighted a general increase of vegetal coverage on the slopes adjacent to the monitored reaches. Together with the check dam network installation, this increase could have induced a reduction in water and sediment supply. The different erosional and depositional forms and adjustments showed a general narrowing between consecutive check dams together with local modifications detected upstream (bed aggradation and cross‐section expansion together with low‐flow realignments) and downstream (local incision) of the installed check dams. Changes in the torrent bends were also detected as a response to erosional and depositional processes with different intensities. The study highlighted: the efficiency of check dams against the disrupting power of intense floods by stabilizing the active channel and the influence of reforestation in increasing hillslope protection from erosion and disconnectivity of water and sediment flows towards the active channel. Only slight management interventions (for instance, the conversion of the existing check dams into open structures) are suggested, in order to mobilize the residual sediment avoiding further generalized incision of the active channel and coast line erosion. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

7.
Stream ecosystems can be dramatically altered by dam-building activities of North American beaver (Castor canadensis). The extent to which beavers’ ecosystem engineering alters riverscapes is driven by the density, longevity, and size (i.e. height and length) of the dams constructed. In comparison to the relative ubiquity of beaver dams on the landscape, there is a scarcity of data describing dam heights. We collected data describing dam height and dam condition (i.e. damaged or intact) of 500 beaver dams via rapid field survey, differentiating between primary and secondary dams and associating each dam with a beaver dam complex. With these data, we examined the influence of beaver dam type (primary/secondary), drainage area, streamflow, stream power, valley bottom width, and HUC12 watershed on beaver dam height with linear regression and the probability that a beaver dam was damaged with logistic regression. On average, primary dams were 0.46 m taller than secondary dams; 15% of observed dams were primary and 85% secondary. Dam type accounted for 21% of dam height variation (p <0.0001). Slope (p = 0.0107), discharge (p = 0.0029), and drainage area (p = 0.0399) also affected dam height, but each accounted for less than 3% of dam height variation. The average number of dams in a dam complex was 6.1 (SD ± 4.5) and ranged from 1 to 21. The watershed a beaver dam was located in accounted for the most variability (17.8%) in the probability that a beaver dam was damaged, which was greater than the variability explained by any multiple logistic regression model. These results indicate that temporally dynamic variables are important influencers of dam longevity and that beaver dam ecology is a primary factor influencing beaver dam height. © 2020 John Wiley & Sons, Ltd.  相似文献   

8.
9.
《国际泥沙研究》2020,35(4):408-416
The magnitude of soil erosion and sediment load reduction efficiency of check dams under extreme rainstorms is a long-standing concern. The current paper aims to use check dams to deduce the amount of soil erosion under extreme rainstorms in a watershed and to identify the difference in sediment interception efficiency of different types of check dams. Based on the sediment deposition at 12 check dams with 100% sediment interception efficiency and sub-catchment clustering by taking 12 dam-controlled catchments as clustering criteria, the amount of soil erosion resulting from an extreme rainstorm event on July 26, 2017 (named “7·26” extreme rainstorm) was estimated in the Chabagou watershed in the hill and gully region of the Loess Plateau. The differences in the sediment interception efficiency among the check dams in the watershed were analyzed according to field observations at 17 check dams. The results show that the average erosion intensity under the “7–26” extreme rainstorm was approximately 2.03 × 104 t/km2, which was 5 times that in the second largest erosive rainfall in 2017 (4.15 × 103 t/km2) and 11–384 times that for storms in 2018 (0.53 × 102 t/km2 - 1.81 × 103 t/km2). Under the “7–26” extreme rainstorm, the amount of soil erosion in the Chabagou watershed above the Caoping hydrological station was 4.20 × 106 t. The sediment interception efficiency of the check dams with drainage canals (including the destroyed check dams) and with drainage culverts was 6.48 and 39.49%, respectively. The total actual sediment amount trapped by the check dams was 1.11 × 106 t, accounting for 26.36% of the total amount of soil erosion. In contrast, 3.09 × 106 t of sediment were input to the downstream channel, and the sediment deposition in the channel was 2.23 × 106 t, accounting for 53.15% of the total amount of soil erosion. The amount of sediment transport at the hydrological station was 8.60 × 105 t. The Sediment Delivery Ratio (SDR) under the “7·26” extreme rainstorm was 0.21. The results indicated that the amount of soil erosion was huge, and the sediment interception efficiency of the check dams was greatly reduced under extreme rainstorms. It is necessary to strengthen the management and construction technology standards of check dams to improve the sediment interception efficiency and flood safety in the watershed.  相似文献   

10.
Earth dams are constructed on a wide scale for hydrotechnical and reclamative purposes. However, the great water permeability of soils and their bad gradation are frequently responsible for the development of mechanical suffusion and other phenomena resulting in dam destruction. Geophysical observations allow under certain conditions to forecast the development of adverse factors. They thus are, as practice shows, an important tool to observe the technical status of dams. The difference in propagation velocities of elastic waves in the zone of aeration and full saturation determines the applicability of the reflected wave method for determining the depth of seepage flow in the dam supporting mass. This can be also achieved by electrical sounding and induced polarization methods since the resistivity and polarizability of air-dry and water-saturated grounds differ considerably. Maps of equal potentials measured on the dam slope reflect the configuration of the contours of water table of the water flow passing through the dam. This makes it possible to obtain data on the direction and intensity of flow as well as on the presence of heterogeneous grounds filling the dam supporting mass. Besides, regime observations conducted according to the SP method allow to forecast the development of suffusion and observe the redeposition of grounds. If the SP anomalies do not increase with time, the suffusion processes can be regarded as fading out. Enhanced amplitude and increasing areas of anomalies show the intensification of these processes. Combined application of some of the above mentioned methods allowed to obtain many practical results on a number of dams in Transcaucasia and Central Asia. The true position of the depression surface determined in the dam of one of the high-mountain water reservoirs, for instance, considerably differed from the designed one. The configuration of the seepage flow surface and its fluctuation caused by the rise and drop of the water level in the reservoir have been studied in detail on another dam situated on a plain. The sites of the most intensive outwash of fine material have also been located and the processes of soil redeposition in the dam supporting mass characterized. The data of the geophysical investigations were used to plan hydroinsulation and repair work.  相似文献   

11.
While 1992 marked the first major dam – Manwan – on the main stem of the Mekong River, the post-2010 era has seen the construction and operationalisation of mega dams such as Xiaowan (started operations in 2010) and Nuozhadu (started operations in 2014) that were much larger than any dams built before. The scale of these projects implies that their operations will likely have significant ecological and hydrological impacts from the Upper Mekong Basin to the Vietnamese Delta and beyond. Historical water level and water discharge data from 1960 to 2020 were analysed to examine the changes to streamflow conditions across three time periods: 1960–1991 (pre-dam), 1992–2009 (growth) and 2010–2020 (mega-dam). At Chiang Saen, the nearest station to the China border, monthly water discharge in the mega-dam period has increased by up to 98% during the dry season and decreased up as much as −35% during the wet season when compared to pre-dam records. Similarly, monthly water levels also rose by up to +1.16 m during the dry season and dropped by up to −1.55 m during the wet season. This pattern of hydrological alterations is observed further downstream to at least Stung Treng (Cambodia) in our study, showing that Mekong streamflow characteristics have shifted substantially in the post-2010 era. In light of such changes, the 2019–2020 drought – the most severe one in the recent history in the Lower Mekong Basin – was a consequent of constructed dams reducing the amount of water during the wet season. This reduction of water was exacerbated by the decreased monsoon precipitation in 2019. Concurrently, the untimely operationalisation of the newly opened Xayaburi dam in Laos coincided with the peak of the 2019–2020 drought and could have aggravated the dry conditions downstream. Thus, the mega-dam era (post-2010) may signal the start of a new normal of wet-season droughts.  相似文献   

12.
This study focuses on the spatial variations in vegetative roughness associated with morphological channel adjustments due to the presence of check dams in Mediterranean torrential streams. Manning’s n values were estimated using methods established by previous studies of submerged and non-submerged vegetation in laboratory flume experiments and field work. The results showed a linear decrease in shrub density and rate of variation of the roughness coefficient versus degree of submergence with increasing distance upstream from the check dam, while downstream, the filling of the check dam and the bed incision had the most influence. A regression analysis was applied by fitting the data to different models: relationships between Manning’s n and the flow velocity were found to be of the power type for shrubs in all upstream sections, while relationships of flow velocity versus hydraulic radius in the sections closest to check dams showed a good fit to second-order polynomial equations.  相似文献   

13.
To maintain a reasonable sediment regulation system in the middle reaches of the Yellow River, it is critical to determine the variation in sediment deposition behind check‐dams for different soil erosion conditions. Sediment samples were collected by using a drilling machine in the Fangta watershed of the loess hilly–gully region and the Manhonggou watershed of the weathered sandstone hilly–gully (pisha) region. On the basis of the check‐dam capacity curves, the soil bulk densities and the couplet thickness in these two small watersheds, the sediment yields were deduced at the watershed scale. The annual average sediment deposition rate in the Manhonggou watershed (702.0 mm/(km2·a)) from 1976 to 2009 was much higher than that in the Fangta watershed (171.6 mm/(km2·a)) from 1975 to 2013. The soil particle size distributions in these two small watersheds were generally centred on the silt and sand fractions, which were 42.4% and 50.7% in the Fangta watershed and 60.6% and 32.9% in the Manhonggou watershed, respectively. The annual sediment deposition yield exhibited a decreasing trend; the transition years were 1991 in the Fangta watershed and 1996 in the Manhonggou watershed (P < 0.05). In contrast, the annual average sediment deposition yield was much higher in the Manhonggou watershed (14011.1 t/(km2·a)) than in the Fangta watershed (3149.6 t/(km2·a)). In addition, the rainfalls that induced sediment deposition at the check‐dams were greater than 30 mm in the Fangta watershed and 20 mm in the Manhonggou watershed. The rainfall was not the main reason for the difference in the sediment yield between the two small watersheds. The conversion of farmland to forestland or grassland was the main reason for the decrease in the soil erosion in the Fangta watershed, while the weathered sandstone and bare land were the main factors driving the high sediment yield in the Manhonggou watershed. Knowledge of the sediment deposition process of check‐dams and the variation in the catchment sediment yield under different soil erosion conditions can serve as a basis for the implementation of improved soil erosion and sediment control strategies, particularly in semi‐arid hilly–gully regions. Copyright © 2018 John Wiley & Sons, Ltd.  相似文献   

14.
Risk analysis for clustered check dams due to heavy rainfall   总被引:7,自引:1,他引:6  
Check dams are commonly constructed around the world for alleviating soil erosion and preventing sedimentation of downstream rivers and reservoirs.Check dams are more vulnerable to failure due to their less stringent flood control standards compared to other dams.Determining the critical precipitation that will result in overtopping of a dam is a useful approach to assessing the risk of failure on a probabilistic basis and for providing early warning in case of an emergency.However,many check dams are built in groups,spreading in several tributaries in cascade forms,comprising a complex network.Determining the critical precipitation for dam overtopping requires a knowledge of its upstream dams on whether they survived or were overtopped during the same storm,while these upstream dams in turn need the information for their upstream dams.The current paper presents an approach of decomposing the dam cluster into(1)the heading dam,(2)border dams,and(3)intermediate dams.The algorithm begins with the border dams that have no upstream dams and proceeds with upgraded maps without the previous border dams until all the dams have been checked.It is believed that this approach is applicable for small-scale check dam systems where the time lag of flood routing can be neglected.As a pilot study,the current paper presents the analytical results for the Wangmaogou Check Dam System that has 22 dams connected in series and parallel.The algorithm clearly identified 7 surviving dams,with the remaining ones being overtopped for a storm of 179.6 mm in 12 h,which is associated with a return period of one in 200 years.  相似文献   

15.
《国际泥沙研究》2022,37(5):675-686
In the Brazilian drylands, there are tens of thousands of small dams. Despite their paramount importance to the rural population, they are rarely monitored. Water demand increases with time while, simultaneously, siltation reduces reservoir water capacity and availability. Reservoir siltation models are, therefore, mandatory to manage the numerous ungauged small dams in these drylands. The objective of the current study is to improve sediment trap efficiency (TE) modeling by including resuspension as a key probabilistic process. The Shannon entropy was used to estimate the sediment resuspension probability, which was merged with the Camp model and generated the RETSED entropy model. To validate the RETSED model, an experimental check dam (ECD, 300 m³), located in the Gilbués desertification site, Brazil, was monitored hourly during one hydrological year (July 2018–July 2019). Measurements show that the annual volumetric decline of the check dam was 12%; and that the average trap efficiency equaled 86%. Only 9.5% of the hourly sediment concentration outflow exceeded the average plus one standard deviation, showing that the reservoir is well mixed; a fact which highlights the relevance of the resuspension process. Three empirical models failed to mimic the experimental results: Churchill (TE = 99%), Brune (TE = 75%), and Maryland (TE = 94%). According to the RETSED entropy model, the resuspension probability during the experiment was 10% and TE = 81%, a value only 6% below the measured one. The Camp model simulated TE = 89%, only 3% higher than the measured value, but confirmed the Camp model's tendency to overestimate TE due to a disregard of resuspension. The deterministic model showed low sensitivity concerning the hydrodynamic effects, whereas the entropy formulation proved to be more consistent with physical behavior: the resuspension probability clearly increased and trap efficiency decreased with rising reservoir discharge.  相似文献   

16.
Silting of reservoirs is a ubiquitous process whenever water is impounded. Despite substantial work on the rates of silting, the spatial pattern of silting in reservoirs is not clearly understood. While it is anticipated that the variability of silting increases with decreasing reservoir size, not much is known about siltation in subtropical humid regions affected by monsoon rainfall. This paper presents the initial results of geomorphic analysis of six earthen check dams in the Shiwalik foothills of the Himalayas (India) in areas that are inhabited by high proportions of disempowered populations. These check dams include three small-sized dams (Dhamala-II, Rel Majra and Sukhomajri-II) and three medium-sized dams (Bunga-I, Parachh-II and Siswan). Field data were collected from each reservoir. The methods used included spatial interpolations of bed depth and silt thickness in each reservoir, Structure from Motion photogrammetry to extract multiple channel cross-sections from photographic scans along tributary mouths, texture analysis of bed and bank materials, and visual observations of hill slopes around the check dams. Based on this study, silt tended to concentrate either in the middle portion of the reservoir or near the dam; however, silt accumulation did not always occur along the dam or in the deepest portion of the reservoirs. Areas located downstream from these check dams are heavily used for various human activities and the channel network has almost been eliminated. While these earthen check dams may be cost-effective tools for water conservation in economically marginalized areas, if abandoned, these structures may pose a physical hazard to downstream communities. © 2019 John Wiley & Sons, Ltd. © 2019 John Wiley & Sons, Ltd.  相似文献   

17.
The cascading failure of multiple landslide dams can trigger a larger peak flood discharge than that caused by a single dam failure.Therefore,for an accurate numerical simulation,it is essential to elucidate the primary factors affecting the peak discharge of the flood caused by a cascading failure,which is the purpose of the current study.First,flume experiments were done on the cascading failure of two landslide dams under different upstream dam heights,downstream dam heights,and initial downstream reservoir water volumes.Then,the experimental results were reproduced using a numerical simulation model representing landslide dam erosion resulting from overtopping flow.Finally,the factors influencing the peak flood discharge caused by the cascading failure were analyzed using the numerical simulation model.Experimental results indicated that the inflow discharge into the downstream dam at the time when the downstream dam height began to rapidly erode was the main factor responsible for a cascading failure generating a larger peak flood discharge than that generated by a single dam failure.Furthermore,the results of a sensitivity analysis suggested that the upstream and downstream dam heights,initial water volume in the reservoir of the downstream dam,upstream and downstream dam crest lengths,and distance between two dams were among the most important factors in predicting the flood discharge caused by the cascading failure of multiple landslide dams.  相似文献   

18.
Rockfill buttressing resting on the downstream face of masonry or concrete gravity dam is often considered as a strengthening method to improve the stability of existing dam for hydrostatic and seismic loads. Simplified methods for seismic stability analysis of composite concrete-rockfill dams are discussed. Numerical analyses are performed using a nonlinear rockfill model and nonlinear dam-rockfill interface behavior to investigate the effects of backfill on dynamic response of composite dams. A typical 35 m concrete gravity dam, strengthened by rockfill buttressing is considered. The results of analyses confirm that backfill can improve the seismic stability of gravity dams by exerting pressure on the dam in opposition to hydrostatic loads. According to numerical analyses results, the backfill pressures vary during earthquake base excitations and the inertia forces of the backfill are the main source for those variations. It is also shown that significant passive (or active) pressure cannot develop in composite dams with a finite backfill width. A simplified model is also proposed for dynamic analysis of composite dam by replacing the backfill with by a series of vertical cantilever shear beams connected to each other and to the dam by flexible links.  相似文献   

19.
《国际泥沙研究》2020,35(6):621-635
The objective of the proposed method is to utilize a site investigation of a debris flow disaster and verify a real scale analysis to evaluate the impulsive load on an open sabo dam. The Nagiso debris flow disaster which occurred in Nagano in 2014, where damage caused by Typhoon Neogri was studied. The verification result of the site investigation demonstrated the weak components of the open Sabo dam experienced damage owing to the debris flow. A discrete element method is normally applied to a solid body to calculate an interaction function force with respect to the contact point between boulders and the dam. The numerical method initially concatenates elements that model the open Sabo dam. Moreover, the stiffness coefficient of flanges and coupling joints between pipes was expressed to utilize the sectional partition method to determine the structural characteristics. The method was improved to separate from the connecting elements beyond the boundary conditions. The debris flow model uses a water flow distribution model, and the debris flow flowed from 200 m upstream of the open sabo dam. Accordingly, the proposed method was examined to verify the primary cause of damage to the open sabo dam and used to reproduce the circumstances that evaluated the impulsive load occurrence mechanism in the case of a real disaster. In addition, the coupling joints between the hollow steel pipes utilized a ‘reproduction analysis’ for a real sabo dam and a ‘reinforced analysis’ for a reinforced sabo dam were applied to assess the weak point of the dam.  相似文献   

20.
The advance of technology has led to more competent countermeasures, but lives and properties still continue to suffer from water‐induced disasters, such as floods, landslides, and debris flows. To increase the effectiveness of counter systems, improved methods of planning and designing such systems are prerequisite. This paper describes briefly a methodological approach for predicting debris flow characteristics, and proposes techniques for evaluating and improving the mitigative effectiveness of check dams against debris flows in steep mountain torrents. Additionally, a non‐dimensional parameter, namely potential storage volume, is introduced to generalize the evaluation processes. As an example, the 1999 debris‐flow event in the San Julian River, Venezuela, is chosen for discussion. The paper also proposes a method of evaluating the control function of a series of check dams as well as the criteria for the selection of their sizes, numbers and locations. It is hoped that this work will help to determine which combinations of check dams will fit best together for the optimal control of debris flows and available resources in any river basin. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号